Companies

NANO Nuclear Energy

U.S. publicly listed advanced nuclear company. Its 31 December 2025 release describes an MOU with the University of Illinois Urbana-Champaign for a KRONOS MMR research reactor. The university maps an approximate proposed site labeled 'East Site' near Abbott Power Plant, and the NRC lists the construction permit application under review. Neither the MOU nor application is an issued construction permit. On 1 October 2026 the company said its subsidiary HALEU Energy Fuel Inc. signed an asset purchase agreement for a depleted-uranium-hexafluoride deconversion license and related materials tied to an unbuilt Lea County, New Mexico facility. Closing still requires NRC consent to the license transfer. The page does not show that consent, does not transfer the license, and does not describe a reactor.

Projects
Licensing: University of Illinois KRONOS MMR. Furthest recorded stage of 4 as vendor, developer or operator. 2 designs.
Evidence
7 sources; first primary source: NANO Nuclear Energy IPO closing exhibit (NASDAQ: NNE). Record reviewed 25 Oct 2026.

Key facts

Organization type
Reactor developer, Vendor
Category
vendor
Country
United States
Aliases
NANO Nuclear Energy Inc., NNE
Listing status
Publicly listed · source NANO Nuclear Energy IPO closing exhibit (NASDAQ: NNE) · listing checked 1 Oct 2026
Exchange / ticker
Nasdaq:NNE
Ownership / control
Public shareholders
Nasdaq Capital Market listing under NNE since May 2024 IPO; still listed as of August 2026 company update.
Website
https://nanonuclearenergy.com/
Confidence
high
Record reviewed
25 Oct 2026 (record review date, not proof of current activity)

Linked designs

  • KRONOS MMR — High-temperature gas-cooled reactor (HTGR) · Microreactor
  • LOKI MMR — High-temperature gas-cooled reactor (HTGR) · Microreactor

Tracked deployment projects

4 linked project records: 3 announced, 1 licensing, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Agreements (6)

Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.

Ownership & relationships

Milestones

  • 8 May 2024 — Began trading on Nasdaq Capital Market as NNE; IPO closed 2024-05-10.
  • 21 Oct 2026 — Announced a three-year non-exclusive engineering-services framework with IMPSA's US subsidiary for KRONOS components, beginning with an estimated six-month design/manufacturability study. Later fabrication remains conditional on engineering results, regulatory requirements and further agreements where needed. This does not establish a UIUC construction contract.

Organization-level unresolved information

Sources

(7)