Projects / United States · Announced
Pylon / LOKI MMR experiment proposal for INL's DOME
NANO Nuclear Energy's LOKI MMR is an announced test reactor proposal for Idaho National Laboratory's DOME test bed.
Current status
- How current
- General record check . Bounded evidence review . 1 of 5 listed sources has a publication or document date recorded here: 7 Oct 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
DOE funded Ultra Safe Nuclear in 2023 to design a Pylon microreactor experiment for INL's DOME test bed; Pylon was not chosen for the 2024 second phase. NANO Nuclear, which bought and renamed the design LOKI MMR, said in January 2025 it aimed to demonstrate it in DOME by 2027. NRIC's October 2026 DOME queue does not include it, so the demonstration is unconfirmed.
Key facts
- Design
- LOKI MMR (Microreactor)
- Technology
- High-temperature gas-cooled reactor (HTGR) · helium
- Operator(s)
- Not recorded
- Vendor for linked design
- NANO Nuclear Energy
- Location
- DOME test bed, Idaho National Laboratory · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
DOE identifies DOME as the repurposed EBR-II containment. This reuses the recorded OpenStreetMap building center 43.59507,−112.65716. The shared facility point is approximate and does not separate reactor positions or establish permission. - Coordinates
- 43.59507, -112.65716 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: module
- Thermal capacity
- Not recorded
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Pylon / LOKI MMR experiment proposal for INL's DOME is recorded at DOME test bed, Idaho National Laboratory, Idaho, United States. Operator: No operator is recorded. Recorded vendor: NANO Nuclear Energy. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: eVinci DOME nuclear test reactor, Deployable Energy Unity full-power test in INL's DOME (2027).
Coordinate source: OpenStreetMap Nominatim geocoder, OpenStreetMap Nominatim result: building center of the EBR-II containment (DOME) at the Materials and Fuels Complex, 43.59507, −112.65716
Electrical output is not recorded on this project. Modules planned: 1. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Project proposer or applicant
- Project proposerUltra Safe Nuclear Corporation · source
- Project proposerNANO Nuclear Energy · source
- Reactor supplier
- Vendor for the linked designNANO Nuclear Energy
- Funding and government decisions
Source-backed project statement The DOE notice of 23 October 2023 says DOE, through NRIC, awarded $3.9 million in total to Radiant, Ultra Safe Nuclear and Westinghouse for front-end engineering and experiment design of DOME experiments, naming Pylon as Ultra Safe's design. Pylon's share is not stated. The 18 November 2024 second-phase award of $5 million went to Radiant and Westinghouse only, and no later award naming LOKI MMR was read. DOE: awards $3.9 million for advanced reactor experiment designs; DOE: awards $5 million for second phase of advanced reactor experiment designs
Not found in the sources we checked (4): Customer or offtaker; Contractor; Fuel; Comparable schedule revision
- Customer or offtaker
NANO Nuclear's 15 January 2025 release describes LOKI MMR for classes of remote terrestrial, marine and space uses but names no buyer, and the DOE notices of 23 October 2023 and 18 November 2024 and the 2 October 2026 ANS article treat DOME as a test facility. No recipient of power from a LOKI demonstration is named. NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design
- Contractor
The DOE notice of 23 October 2023 says DOE, through NRIC, funded Ultra Safe Nuclear, the developer, to carry out front-end engineering and experiment design of the Pylon experiment for DOME, and the 18 November 2024 second phase went to Radiant and Westinghouse. NANO Nuclear's 15 January 2025 release says it acquired and renamed the design. No engineering or construction contractor other than the developers is named, and no DOME slot is shown. DOE: awards $3.9 million for advanced reactor experiment designs; DOE: awards $5 million for second phase of advanced reactor experiment designs; NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design
- Fuel
- No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.
The DOE notice of 23 October 2023 says the design process supports planning for fueled reactor experiments, but it, the 2024 DOE notice and NANO Nuclear's 15 January 2025 release name no fuel manufacturer, quantity or delivery for a Pylon or LOKI MMR experiment. DOE: awards $3.9 million for advanced reactor experiment designs
- Comparable schedule revision
Comparable schedule revision not established. NANO Nuclear's 15 January 2025 release puts the earlier 2026 initial-testing timeline under review after the acquisition and describes a demonstration aim by 2027. Initial testing and demonstration are not established as the same milestone, so these dates are not treated as a comparable revision. The 2 October 2026 ANS account does not name LOKI in the NRIC queue; that omission alone does not establish cancellation or a confirmed slot. NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design; ANS: Deployable Energy next in line for testing in NRIC's DOME
Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Operator or intended licensed owner
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 notes, 1 not yet reviewed)
- Evidence review. On 23 October 2023 the Department of Energy awarded $3.9 million among three developers, including Ultra Safe Nuclear Corporation, to design DOME experiments, and it named Pylon as one of the three designs. On 18 November 2024 the second-phase award of $5 million went to Radiant and Westinghouse and did not name Pylon or Ultra Safe. On 15 January 2025 NANO Nuclear said it had renamed the acquired Pylon design LOKI MMR and aimed to demonstrate it at DOME by 2027, while saying the original 2026 test timing was under review. The same page states two different output ranges, so no single electrical figure is stored. An ANS account dated 2 October 2026 describes the DOME queue as Radiant and then Deployable Energy, with a competitive request to be announced in 2027, and does not name LOKI. That is a queue account, not a cancellation. No operating license is stated. Last checked 19 Oct 2026. DOE: awards $3.9 million for advanced reactor experiment designs; NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design; ANS: Deployable Energy next in line for testing in NRIC's DOME
What would change this
A DOE or NRIC selection, or the announced 2027 competitive DOME application, that names LOKI MMR or Pylon. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. NANO Nuclear's January 2025 release sets an aim of demonstrating LOKI MMR in DOME by 2027. Getting there would need a DOME test-slot selection and DOE authorization; the sources reviewed record neither, and the release gives no intermediate milestones. Last checked 23 Oct 2026. NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design
What would change this
A DOME test-slot selection or DOE safety authorization for LOKI MMR. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). NANO Nuclear said in January 2025 it aimed to demonstrate the LOKI MMR at the DOME test facility at Idaho National Laboratory by 2027. DOME is a shared DOE test bed; the release describes no test slot, building interface or utility arrangement for LOKI. Last checked 23 Oct 2026. NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design
What would change this
A DOE or NRIC announcement assigning a DOME test slot to LOKI MMR. Next scheduled check: 21 Jan 2027.
- Permissions and public process. Nuclear News reported on 2 October 2026 that DOME users are chosen through the National Reactor Innovation Center's competitive applications, evaluated against criteria to set a sequencing order; Radiant was selected first and Deployable Energy next, and NRIC said no project had been identified after Deployable, with a new request for applications due in 2027. World Nuclear News reported the July 2026 round and its criteria. LOKI MMR therefore has no DOME slot in these sources; whether NANO Nuclear applied, and any DOE authorization, is not stated. Last checked 23 Oct 2026. NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design; ANS: Deployable Energy next in line for testing in NRIC's DOME; Deployable Energy to test its Unity nuclear battery in DOME
What would change this
NRIC's 2027 request for DOME applications and its selection, or a NANO Nuclear statement that LOKI MMR applied for or received a DOME slot or DOE authorization. Next scheduled check: 23 Apr 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(1 of 5 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(5)
- DOE: awards $3.9 million for advanced reactor experiment designs (government, accessed 2 Oct 2026)
- DOE: awards $5 million for second phase of advanced reactor experiment designs (government, accessed 2 Oct 2026)
- NANO Nuclear: announces LOKI MMR as the tradename for its acquired Pylon design (company, accessed 2 Oct 2026)
- ANS: Deployable Energy next in line for testing in NRIC's DOME (news report, accessed 2 Oct 2026)
- Deployable Energy to test its Unity nuclear battery in DOME (news report, published 7 Oct 2026, accessed 23 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Pylon / LOKI MMR experiment proposal for INL's DOME — https://smrmap.com/projects/loki-mmr-dome-inl/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Pylon / LOKI MMR experiment proposal for INL's DOME”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/loki-mmr-dome-inl/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.