NUWARD SMR

NUWARD small modular reactor design. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled. Two dated versions: ARIS (October 2024) records the earlier two-reactor 340 MWe design; after the July 2024 pivot NUWARD describes a single 1,150 MWth reactor of up to 400 MWe. Parameters are not mixed between versions; up to 400 MWe carries a capacity-check note.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
4 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Pressurized water reactor (PWR)
SMRMap treats the fully integrated PWR in the IAEA's October 2024 status report as the historical two-reactor ARIS design and does not classify the revised single-reactor configuration's primary-circuit layout, so no integral claim is recorded.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
NUWARD
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (4)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(3 notes)
  • Evidence review. The revised company description and the earlier two-reactor ARIS description are kept distinct. The company solution page describes NUWARD SMR as an EDF and NUWARD GEN III+ pressurised-water reactor intended to supply electricity and heat, including hydrogen production, district heating and desalination. That page states one reactor thermal output and convertible electrical and heat figures; those figures are not stored on this identity-only profile, and no module rating field is proposed. The December 2025 Joint Early Review phase 2 summary says NUWARD decided in July 2024 to shift toward an SMR based on proven technology only; the review ran from December 2023 to March 2025 and is not a permit or a named deployment. The ARIS status report published 15 October 2024 still describes a fully integrated PWR and two reactor units; its output figures are not quoted and are not applied to the company description. No linked deployment is named, and the stored vendor, light-water coolant and thermal spectrum are left unchanged. Last checked 19 Oct 2026. NUWARD: our SMR solution (archived); NUWARD Joint Early Review Phase 2 (archived); IAEA ARIS status report: NUWARD (October 2024)
    What would change this

    A dated NUWARD data sheet that states gross and net output for the post-July 2024 single-reactor design separately from the October 2024 two-unit ARIS description. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. The current company description does not establish a module rating applicable to this historical two-unit identity. The older ARIS description was reviewed for identity and classification only. Current single-reactor figures are kept separate; no rating is stored. Last checked 19 Oct 2026. NUWARD: our SMR solution (archived); IAEA ARIS status report: NUWARD (October 2024)
    What would change this

    A company or regulator specification that gives gross and net electrical output for the revised reactor without mixing in the two-unit ARIS rating. Next scheduled check: 19 Jan 2027.

  • Technology family. SMRMap treats the fully integrated PWR in the IAEA's October 2024 status report as the historical two-reactor ARIS design and does not classify the revised single-reactor configuration's primary-circuit layout, so no integral claim is recorded. NUWARD shifted in July 2024 to a design based on proven technology and now describes a 1,150 MWth reactor; the NEA SMR Dashboard calls NUWARD SMR integrated without stating where its primary circuit sits. Last checked 1 Nov 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); IAEA ARIS status report: NUWARD (October 2024); NUWARD Joint Early Review Phase 2 (archived); NUWARD: our SMR solution (archived)
    What would change this

    A dated developer or regulator description of the revised design's primary-circuit layout. Next scheduled check: 1 Feb 2027.