Designs

R1

Kilowatt-scale SMR selected for a DOME demonstration. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
Heat-pipe microreactor. How it works, with a 3D view.
Projects
Siting: 2 projects. Furthest recorded stage of 3 using this design.
Evidence
2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of eVinci, this type's example. A horizontal canister holds a graphite core block with rows of fuel compacts, with control drums above and below it and shutdown rods coming in from the left.
Schematic of eVinci, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
Other (see description)
Coolant
Other (see description)
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Antares Nuclear
Fuel form
TRISO
Enrichment
19.75 wt%
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. The NEA SMR Dashboard third edition (assessment cutoff 14 February 2025) describes Antares' R1 as a kilowatt-scale heat-pipe reactor using TRISO fuel for earth, subsea and outer-space applications, and says it was selected for demonstration at INL's DOME facility under NRIC. DOE's Reactor Pilot Program update slides (July 2026) describe Antares' reactor as a sodium heat-pipe cooled thermal fission microreactor on 19.75 wt% TRISO fuel at INL building MFC-793, with the preliminary safety analysis approved in January 2026, the documented safety analysis in April 2026 and criticality of the Mark-0 critical assembly (under 100 W thermal) on 4 June 2026, followed by a planned 2027 Mark-1 electricity test at 1 MW-thermal (about 270 kW-electric). These are DOE pilot authorizations of test articles, not NRC licenses or commercial deployments. Neither source names the linked Fort Bragg (Janus), Joint Base San Antonio or INL Central Facilities Area deployments. Stored vendor, heat-pipe technology and coolant, thermal spectrum, TRISO fuel and 19.75 wt% enrichment stay; the module rating stays unset because no reusable published source states the R1 product rating. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025); DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)
    What would change this

    DOE's authorization (PDSA/DSA) for the Antares Mark-1 electricity-producing test or an Army Janus / ANPI site decision naming the R1, which would give a dated rating and tie the design to a specific linked deployment. Next scheduled check: 19 Jan 2027.

  • Module rating: Not disclosed in the reviewed evidence. No reusable published source states the R1 product rating. DOE's July 2026 slides give 1 MW-thermal (about 270 kW-electric) for the planned Mark-1 electricity test, a test configuration rather than a rated product output, so no module rating is stored. Last checked 19 Oct 2026. DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)
    What would change this

    An Antares product specification or DOE/Army authorization stating the R1 commercial unit's MWth and kWe with basis, which would confirm whether the 1 MWth NEA value applies to the fielded R1 rather than only the Mark-1 test unit. Next scheduled check: 19 Jan 2027.