Projects / United States · Siting

Antares microreactor at Joint Base San Antonio (ANPI)

The Department of the Air Force paired Antares with Joint Base San Antonio under ANPI in April 2026.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . 2 of 3 listed sources have a publication or document date recorded here; the newest is 23 Apr 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
Same design
3 tracked: 2 siting, 1 announced. 65 tracked at siting across all designs. Recorded stages, not proof of current activity.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Heat-pipe microreactor. How it works, with a 3D view.
Schematic of eVinci, this type's example. A horizontal canister holds a graphite core block with rows of fuel compacts, with control drums above and below it and shutdown rods coming in from the left.
Schematic of eVinci, this type's example.

Description

Reporting describes ANPI reactors as contractor-owned and operated and names Antares among three companies selected as potential developers and operators. Antares is not linked as operator because the selection and the site are both described as potential. The Air Force is the host, not the operator. The component installation and output are not stated.

Key facts

Design
R1 (Microreactor)
Technology
Other · other
Operator(s)
Not recorded
Vendor for linked design
Antares Nuclear
Location
Joint Base San Antonio · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
The sources name this place but publish no coordinate for it, so no pin is shown.
Coordinates
Named site, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
10 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Antares microreactor at Joint Base San Antonio (ANPI) is recorded at Joint Base San Antonio, Texas, United States. Operator: No operator is recorded. Recorded vendor: Antares Nuclear. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); named site, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Fuel
  • Fuel form stated for R1 (catalog profile as of 14 Feb 2025)TRISO
  • Enrichment stated for R1 (catalog profile as of 14 Feb 2025)19.75 wt%
No project-specific fuel supply arrangement is recorded as a structured fact.

Antares' 22 April 2026 release says fuel fabrication for its initial reactors has been under way at BWX Technologies since October 2025, in the passage about its Department of Energy pilot reactor, and describes TRISO as the R1 design fuel. It does not tie that fuel or any delivery to a reactor at Joint Base San Antonio. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative

Site host or owner
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

Antares' 22 April 2026 release quotes the Joint Base San Antonio commander saying the base's resilience would improve if it is selected as a site, which describes potential host use, not a purchase. Neither that release nor World Nuclear News' 24 April 2026 report names a buyer, quantity or power purchase agreement for an Antares reactor at the base. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative; WNN: US Air Force announces selections for microreactor deployments

Contractor

Antares' 22 April 2026 release says the Department of the Air Force, with the Defense Innovation Unit, selected Antares for the proposed deployment of a prototype microreactor at Joint Base San Antonio, and World Nuclear News on 24 April 2026 calls Antares a potential developer and operator. That is the project's own developer being selected, not a contractor appointment. Neither source names an engineering, construction or other contractor for the base deployment. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative; WNN: US Air Force announces selections for microreactor deployments

Funding and government decisions

Antares' 22 April 2026 release says the company is backed by over $140 million in funding, which is company financing, not money for the Joint Base San Antonio deployment. World Nuclear News' 24 April 2026 report says the selected firms were eligible to seek funding under the program and states no award or amount for this pairing. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative; WNN: US Air Force announces selections for microreactor deployments

Comparable schedule revision

Comparable schedule revision not established. Antares' 22 April 2026 release gives one target, R1 deployment by 2028 or earlier, and World Nuclear News' 24 April 2026 report gives the program's aim of one reactor on an Air Force installation by 2030 or sooner. These are different scopes stated once each, not an earlier and later date for the same Joint Base San Antonio milestone. Antares Selected for Proposed Deployment of Nuclear Microreactor at Joint Base San Antonio Under Department of the Air Force ANPI Initiative; WNN: US Air Force announces selections for microreactor deployments

Not recorded in SMRMap's reviewed evidence (3): Project proposer or applicant; Operator or intended licensed owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)

Evidence dates

(2 of 3 sources with a publication or document date)
Latest dated listed source publication: Department of Air Force picks bidders for nuclear microreactors, assigns locations: 23 Apr 2026.Latest dated recorded event: no date recorded.1 of 3 listed sources has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Antares microreactor at Joint Base San Antonio (ANPI) — https://smrmap.com/projects/anpi-jbsa-antares/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Antares microreactor at Joint Base San Antonio (ANPI)”. Record reviewed 10 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/anpi-jbsa-antares/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.