RITM-200M

Floating SMR in the RITM-200 series for export markets. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here.
Evidence
2 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Afrikantov OKBM
Fuel form
UO2 (cermet fuel) pellets / hexagonal
Reactor vessel
8.6 m tall, 3.45 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 159.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
RITM-200M
8.6 m tall, 3.45 m across
All vessels to scale
Inclusion basis
SMR by design class
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

  • No projects tracked here.

Design sources

(2)

Evidence and open questions

(2 notes)
  • Evidence review. The June 2025 third edition of the 2024 Small Modular Reactor Technology Catalogue has a RITM-200M section from Afrikantov OKBM describing an integral pressurised-water reactor with light-water coolant and moderator. It was developed for an optimized floating power unit, a vessel with two RITM-200M reactor plants that can supply electricity, heat and desalinated water. The section parameter block shows 198 / 50 for thermal/electrical capacity in MW(t)/MW(e), without a gross or net label. That pair is the reactor entry, not the two-plant total, and it is not stored on this identity-only profile. Milestones separate the first RITM-200 on the icebreaker Arktika from completion of the RITM-200M technical design, and RITM-200N output is not used. No operating RITM-200M deployment is named, and NEA figures are not reused. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A later OKBM specification clarifying gross/net and reactor versus floating-unit output. Next scheduled check: 19 Jan 2027.

  • Module rating. The original catalog table on printed page 101 (PDF page 109), checked with its columns intact, places 198 / 50 on the thermal/electrical capacity row. These are the reactor-entry figures, not a two-reactor floating-unit total. Gross/net is unstated. This identity-only profile receives no numerical rating field. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A dated OKBM specification clarifying gross/net and reactor versus floating-unit output. Next scheduled check: 19 Jan 2027.