Designs

SMART100

SMART100 is the upgraded integral pressurized-water version of KAERI's original SMART. KAERI and NSSC technical material distinguish its 365 MWth and 110 MWe design ratings from the earlier 330 MWth and 100 MWe SMART; electrical gross/net is unspecified. The NSSC approved SMART100's standard design on 26 September 2024, with administrative follow-up on power-system review during later licensing. This is design approval, not construction or operating permission in Korea, Saudi Arabia or Canada. SMART-C is a separate compact derivative; it does not inherit this approval.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No projects tracked here. Development status as stated in the catalog dated 14 Feb 2025: Standard design approval, Korea, 26 September 2024; not a site license.
Evidence
6 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 14 Feb 2025
Korea Atomic Energy Research Institute
Module electrical
110 MWe (gross/net unspecified)
Module thermal
365 MWth (nameplate; basis unspecified)
Development status (as stated)
Standard design approval, Korea, 26 September 2024; not a site license
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

  • No projects tracked here.

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(6)

Evidence and open questions

(2 notes)
  • Evidence review. The NEA dashboard and the ARIS catalog were not used for figures. KAERI's English announcement says the Nuclear Safety and Security Commission granted SMART100 standard design approval on 26 September 2024, and describes SMART100 as the integrated upgrade of the original SMART, from 330 MW and 100 MW to 365 MW thermal and 110 MW electrical. The NSSC decision paper of the same date calls SMART100 an integral pressurized-water reactor, states 365 MWt and 110 MWe, and says the standard design is approved. KHNP, KAERI, and Saudi K.A.CARE are the joint applicants, which is not changed into a new vendor list. Gross versus net is not stated. The papers name no construction site. Stored family, coolant, and ratings already match. Last checked 20 Oct 2026. KAERI: SMART100 standard design approval and SMART upgrade (27 September 2024); NSSC: SMART100 approval agenda and technical review (26 September 2024, Korean)
    What would change this

    A construction permit or export contract that names a SMART100 plant, or a KAERI sheet that states gross versus net. Next scheduled check: 20 Jan 2027.

  • Module rating. SMART100 standard-design configuration: 365 MWth and 110 MWe, gross/net not stated. These are not the original SMART ratings. Last checked 15 Oct 2026. NSSC: SMART100 approval agenda and technical review (26 September 2024, Korean)
    What would change this

    A later KAERI or regulator specification changes this version or explicitly states the electrical-output basis. Next scheduled check: 13 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Design assessment