Designs

mPower

Integral pressurized-water small modular reactor of 575 MWt and 195 MWe per module (two-module plant) by Generation mPower and BWX Technologies, listed in the IAEA's 2014-2020 SMR booklets. This dated design profile does not establish current development, a deployment site or any regulatory permission.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
No live project recorded here; 1 canceled (B&W mPower plan at TVA's Clinch River site).
Evidence
2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s) as of 2020
Generation mPower LLC, BWX Technologies
Module electrical
195 MWe (gross/net unspecified)
Module thermal
575 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
3 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(2)

Evidence and open questions

(1 note)
  • Evidence review. The 2020 IAEA SMR booklet section, contributed by BWX Technologies, describes the mPower plant as an integral pressurized-water reactor designed by Generation mPower LLC for a nominal 195 MW(e) per module, with a standard plant of two modules at a nominal 390 MW(e). The same section's capacity values read 575 / 195 beside light water coolant and moderator, and electricity is the primary application. Design status in that table is conceptual design. The 2014 booklet edition stated a nominal 180 MW(e) per module and 360 MW(e) for the twin plant, so the electrical figure moved between editions. In the 2020 mPower section, TVA's announced intention to submit an early site permit application at Clinch River for two or more SMR modules is recorded as corporate history. Stored 195 MWe and 575 MWth match the 2020 edition, with basis still unspecified. Last checked 19 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition); IAEA, Advances in Small Modular Reactor Technology Developments (2014 edition)
    What would change this

    A BWXT or NRC document later than the 2020 booklet that withdraws mPower or replaces the 195 MW(e) and 575 MW(t) figures. Next scheduled check: 19 Jan 2027.