BWX Technologies

NYSE-listed nuclear manufacturer and developer of the BWXT Advanced Nuclear Reactor (BANR) microreactor, alongside component manufacturing. The directory maps Tata Chemicals' conditional Green River, Wyoming BANR proposal from a letter of intent; this is not a built reactor or final purchase. It separately records the Belledune transportable-plant selection and Fort Campbell defense proposal.

Projects
Construction: Project Pele (INL microreactor demonstration). Furthest recorded stage of 4 as vendor, developer or operator. 3 designs.
Evidence
11 sources; first primary source: BWXT Commercial Nuclear Operations brochure (2025). Record reviewed 9 Oct 2026.

Key facts

Organization type
Reactor developer, Vendor, Manufacturer
Category
vendor
Country
United States
Aliases
BWXT, BWX Technologies, Inc.
Listing status
Publicly listed · source BWXT Commercial Nuclear Operations brochure (2025) · listing checked 1 Oct 2026
Exchange / ticker
NYSE:BWXT
Ownership / control
Public shareholders
Public company BWX Technologies, Inc. (NYSE: BWXT).
Website
https://www.bwxt.com/
Confidence
high
Record reviewed
9 Oct 2026 (record review date, not proof of current activity)

Linked designs

Tracked deployment projects

5 linked project records: 3 announced, 1 construction, 1 commissioning, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Agreements (4)

Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.

Ownership & relationships

Milestones

(7)
  • 26 Aug 2026 — U.S. Army/DIU Janus program selected BANR (20 MWe variant); groundbreaking target late 2028 — not mapped as a civilian SMRMap pin.
  • 28 Oct 2025 — Announced a steam-generator detailed-design contract with Rolls-Royce SMR and a separate memorandum for prospective manufacturing cooperation. The memorandum is not a manufacturing order or delivered hardware.
  • 22 Jul 2025 — Reported that its Advanced Technologies subsidiary had completed installation and testing of a CVI furnace for TRISO fuel under DOE ARDP work. The completion day is unstated. This is equipment capability, not completed fuel qualification or reactor operation.
  • 2 Apr 2025 — Reported opening a 170,000-square-foot nuclear design/test campus at Lynchburg. The page is dated 2 April with a 26 March body dateline, so no physical opening day is assigned. Through end-2024 it reported $51 million invested at the site and $227,000 in tax incentives received, not a reactor award.
  • 18 Jul 2024 — Announced a Wyoming cooperation agreement to evaluate potential TRISO fuel-factory sites; no selected site, reactor order or fuel delivery.
  • 29 Apr 2024 — BWXT Canada selected for GE Vernova's BWRX-300 supplier group; qualification did not itself award a component order.
  • 19 Apr 2024 — Announced an estimated C$80 million Cambridge factory/equipment plan; Q3 2024 construction and mid-2026 completion were targets, not verified outcomes.

Organization-level unresolved information