OTRERA ONE
ASNR's PRM list, as read on 5 October 2026, names OTRERA ONE as a sodium-cooled industrial prototype of 200 MWth and states that Otrera filed a safety-options request on 30 July 2026. The OTRERA 300 section of the 2026 IAEA-hosted catalog, supplied by its contributor, gives reactor type SFR and names OTRERA ONE as the industrial precursor of that design. The ASNR page does not state electrical output or neutron spectrum, and it does not record an opinion or a creation authorization. This is not the OTRERA 300 catalog identity and it is not a sited deployment.
- Reactor type
- Sodium-cooled fast reactor. How it works, with a 3D view.
- Projects
- No projects tracked here.
- Evidence
- 3 sources; first primary source: ASNR, PRM projects and their fuel-fabrication plants. Record reviewed 5 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Sodium-cooled fast reactor (SFR)
The IAEA's 2026 catalog section for OTRERA 300, supplied by its contributor, gives reactor type SFR in a table that also carries OTRERA ONE's 200 MW(t) rating, and describes OTRERA ONE as the industrial precursor configuration of the same sodium fast reactor design, sharing its core and MOX fuel. - Coolant
- Sodium
- Spectrum
- Fast
- Developer / vendor(s)
- Otrera New Energy
- Module thermal
- 200 MWth (nameplate; basis unspecified)
- Record reviewed
- 5 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module electrical
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- ASNR, PRM projects and their fuel-fabrication plants (regulator, accessed 3 Nov 2026)
- Otrera — Technology and Fuel (company page) (company, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) (IAEA/NEA, published Sep 2026, accessed 2 Nov 2026)
Evidence and open questions
(3 notes)
- Evidence review. The ASNR page dated 14 October 2026 lists OTRERA ONE under sodium-cooled reactors as a demonstrator/prototype at 200 MWth, and says OTRERA requested an opinion on safety options on 30 July 2026. The next row is HEXANA at 400 MWth. The company page names OTRERA 20, OTRERA 110, and OTRERA 200 and does not define OTRERA ONE, so those electrical and heat figures were not used. The company fast-reactor sentences do not name OTRERA ONE. The 2026 catalog's OTRERA 300 section names it directly as the industrial precursor of that sodium fast reactor design; it is attached for the reactor type and spectrum only, and its output figures aren't stored here. Last checked 20 Oct 2026. ASNR, PRM projects and their fuel-fabrication plants; Otrera — Technology and Fuel (company page)
What would change this
An OTRERA page that names OTRERA ONE and states its neutron spectrum and electrical output. Next recheck due .
- Technology family. The IAEA's 2026 catalog section for OTRERA 300, supplied by its contributor, gives reactor type SFR in a table that also carries OTRERA ONE's 200 MW(t) rating, and describes OTRERA ONE as the industrial precursor configuration of the same sodium fast reactor design, sharing its core and MOX fuel. No sentence calls OTRERA ONE fast in those words. Printed pages 301, 302 and 307. Last checked 3 Nov 2026. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
What would change this
An Otrera or ASNR document that states the OTRERA ONE neutron spectrum directly or changes its layout. Next recheck due .
- Neutron spectrum. The 2026 catalog's OTRERA 300 section gives reactor type SFR in a table that carries OTRERA ONE's rating and describes OTRERA ONE as the precursor configuration of that sodium fast reactor design, sharing its core and MOX fuel; no sentence calls OTRERA ONE fast in those words. Last checked 3 Nov 2026. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
What would change this
An Otrera or ASNR document that states the OTRERA ONE neutron spectrum directly. Next recheck due .
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- OTRERA ONE safety-options request — applies to the design, not to a site
Design assessment sought · Application received · ASNR · submitted 30 Jul 2026
ASNR states that Otrera filed a safety-options request on 30 July 2026 for OTRERA ONE, listed on the 14 October 2026 page as a 200 MWth sodium-cooled demonstrator/prototype. The page does not record an opinion or a creation authorization. This is not a sited project.
Sources: ASNR, PRM projects and their fuel-fabrication plantsStatus confirmed on against ASNR, PRM projects and their fuel-fabrication plants. This confirms the recorded status only; the record check date remains separate.
Cite or share this page
SMRMap. “OTRERA ONE”. Record reviewed 5 Oct 2026. https://smrmap.com/designs/dsn-otrera-one/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Inclusion basis
- SMR by regulator classification
- Confidence (as stored in the record)
- medium
Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.