Designs

RITM-400

Rosatom reactor project developed by OKBM Afrikantov, described in Nornickel's November 2023 statement as a pressurised water reactor with a planned capacity of 80 to 90 MW. Russia's General Scheme to 2042 plans 80 MW RITM-400 blocks at Norilsk; that is an application figure, not a design rating. Development status only; no design approval is recorded.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
Announced: Norilsk land small nuclear plant (RITM-400).
Evidence
3 sources; first primary source: Nornickel: Nornickel and Rosatom to look into nuclear power potential in Norilsk. Record reviewed 2 Oct 2026.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Key facts

Class
SMR
Technology
Pressurized water reactor (PWR)
Nornickel's 2023 release calls RITM-400 a pressurised water reactor and no opened source states its layout, so no integral claim is recorded.
Coolant
Light water
Developer / vendor(s)
Afrikantov OKBM
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
low
Not yet recorded
Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
2 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(3 without a known value)
Spectrum
Not recorded
Module electrical
Not recorded
Module thermal
Not recorded

Tracked deployment projects

Design sources

(3)

Evidence and open questions

(4 notes)