RUTA-70
Pool-type light-water heating reactor by NIKIET, listed in the IAEA's 2014-2020 SMR booklets as a conceptual design of 70 MWt with no electrical output (heat supply). Qualification rests on the IAEA listing, not on low output. This dated design profile does not establish current development, a deployment site or any regulatory permission.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- Announced: RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004).
- Evidence
- 2 sources; first primary source: IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition). Record reviewed 3 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Catalog identity snapshot: 2020 (edition or document date of the cited source). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Other (see description)
The IAEA's 2020 SMR booklet describes RUTA-70 as an integral pool-type heating reactor and does not call it a pressurized water reactor, so the type is recorded as other. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 2020
- NIKIET
- Module electrical
- thermal only (no MWe)
- Module thermal
- 70 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 3 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004) — Announced · Russia
Design sources
(2)
- IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition) (IAEA/NEA, accessed 3 Oct 2026)
- IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition) (IAEA/NEA, accessed 3 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. The 2020 IAEA SMR booklet section, contributed with permission of NIKIET, describes RUTA-70 as a water-cooled, water-moderated, integral pool-type reactor serving as a nuclear heating plant of 70 MW(t) for district heating, desalination and radioisotope production. It has no power conversion system. The same section calls the conceptual design of RUTA primarily a district-heating reactor for remotely isolated areas. Stored 70 MWth on a thermal-only basis, light-water coolant, thermal spectrum and NIKIET vendor match this section. No sentence names Obninsk or IPPE. Last checked 19 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition)
What would change this
A NIKIET or later IAEA booklet edition that changes the 70 MW(t) heating rating or reports a licensing decision. Next scheduled check: 19 Jan 2027.
- Technology family. The IAEA's 2020 SMR booklet describes RUTA-70 as an integral pool-type heating reactor and does not call it a pressurized water reactor, so the type is recorded as other. Last checked 1 Nov 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2020 edition)
What would change this
A NIKIET or IAEA document that changes the stated reactor type. Next scheduled check: 1 Feb 2027.