RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004)

The Institute of Physics and Power Engineering (IPPE) proposed in 2004 to build the first reference RUTA-70 unit in Obninsk, as recorded in the IAEA's 2016 SMR booklet.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Developer or proposer. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

The booklet describes the unit as a 70 MWt pool-type heating reactor with no electrical output, sited where the institute is located and supported by a feasibility study by NIKIET, IPPE and Atomenergoproekt. A 2003 milestone records approval of the project by the board of the 'Development of Obninsk as a science town' program, a local development program rather than a regulatory permission. The same booklet says RUTA was still at conceptual design; no construction or later decision is recorded, and later status has not been traced.

Key facts

Design
RUTA-70 (SMR)
Technology
Other · light water. The IAEA's 2020 SMR booklet describes RUTA-70 as an integral pool-type heating reactor and does not call it a pressurized water reactor, so the type is recorded as other.
Operator(s)
Not recorded
Vendor for linked design
—
Location
Institute of Physics and Power Engineering (IPPE), Obninsk · Russia · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for the Obninsk APS-1 reactor on the IPPE campus (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker); campus point for the institute, not a RUTA position.
Coordinates
55.08901, 36.5912 · site-area point (approximate)
Electrical capacity
thermal only (no MWe) · scope: unit
Thermal capacity
70 MWth (nameplate; basis unspecified)
Modules planned
Not recorded
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
3 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004) is recorded at Institute of Physics and Power Engineering (IPPE), Obninsk, Kaluga Oblast, Russia. Operator: No operator is recorded. Recorded vendor: No vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'atomic-power-station-1-obninsk-nuclear-power-plant' (55.08901, 36.5912)

This project is recorded as thermal only (no MWe). Module count is not recorded. Recorded thermal output is 70 MWth (nameplate; basis unspecified).

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Contractor

Source-backed project statement The IAEA's 2016 SMR booklet says IPPE's 2004 proposal to build the first reference RUTA-70 unit in Obninsk was supported by a feasibility study carried out jointly by NIKIET, IPPE and Atomenergoproekt of Moscow. That was completed preparatory feasibility work, not an engineering or construction contract, and the booklet says RUTA was still at conceptual design. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

The IAEA's 2016 SMR booklet says 2003 technical and economic assessments looked at using a 70 MWt RUTA reactor to upgrade Obninsk's district heating system, and that the 2004 IPPE proposal was a reference unit in Obninsk. No heat utility, buyer, quantity or supply agreement is named, and RUTA remained at conceptual design. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

Funding and government decisions

The IAEA's 2016 SMR booklet records the 2003 approval of the project by the board of the Obninsk science-town development program and the 2004 proposal, but states no funder, budget or amount for a RUTA-70 unit at Obninsk. The program-board approval is a local development decision, not stated funding. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

The IAEA's 2016 SMR booklet describes RUTA-70 at the conceptual-design stage and names no fuel supplier, fabrication or delivery for a reference unit at Obninsk. This records the booklet's dated scope, not a finding that no later progress occurred. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

Comparable schedule revision

Comparable schedule revision not established. The IAEA's 2016 SMR booklet dates only past steps for the Obninsk proposal, the 2003 assessments and board approval and the 2004 proposal, and gives no construction or operation target. No revision is shown. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)

Not recorded in SMRMap's reviewed evidence (5): Project proposer or applicant; Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
Operator or intended licensed owner
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 1 not yet reviewed)
  • Evidence review. The IAEA 2016 SMR booklet's RUTA-70 section says IPPE proposed in 2004 to build the first reference RUTA-70 unit in Obninsk, where the institute is located, supported by a feasibility study by NIKIET, IPPE and Atomenergoproekt. A 2003 line records a feasibility study of a heating plant at IPPE Obninsk and approval by the board of the Obninsk science-town program. The same section says RUTA was still in conceptual design stages. Other RUTA sizes in the section, including a 20 MW concept and a four-unit Apatity study, are not this Obninsk proposal. The stored 70 MW thermal rating is the RUTA-70 capacity named for Obninsk. No electrical output is stated for this heating reactor. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
    What would change this

    A later IPPE or NIKIET notice that this Obninsk reference unit was licensed, sited on a plot, or dropped. Next scheduled check: 20 Jan 2027.

  • Developer or proposer. The booklet says IPPE proposed the Obninsk unit and that NIKIET, IPPE and Atomenergoproekt carried out the feasibility study. IPPE and Atomenergoproekt have no organization records. NIKIET has a record, but the build proposal is attributed to IPPE, so NIKIET is not stored as the proposer. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
    What would change this

    An organization record for IPPE tied to this Obninsk proposal. Next scheduled check: 20 Jan 2027.

  • Site location recorded as disclosed. The booklet names Obninsk, where IPPE is located, as the place of the first reference unit, and the 2003 line names a heating-plant study at IPPE Obninsk. No coordinates are given, so the site is named without a pin. Last checked 20 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
    What would change this

    A plot-level siting decision inside Obninsk. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites: Not disclosed in the reviewed evidence. The IAEA's 2016 booklet says RUTA was still at the conceptual design stage and gives no next step, decision date or actor for the 2004 Obninsk proposal. No later decision to proceed with or abandon the Obninsk unit is recorded in this source. Last checked 23 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
    What would change this

    A Rosatom or IPPE statement on proceeding with, or dropping, a RUTA-70 unit at Obninsk. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. The IAEA's 2016 SMR booklet records that in 2003 the board of the 'Development of Obninsk as a science town' program approved the project after a feasibility study for a nuclear district heating plant at IPPE in Obninsk. That is a local development-program approval, not a regulatory permit, and the booklet's design and licensing status section describes no license application or public hearing. Last checked 23 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
    What would change this

    A record of a Rostekhnadzor license application or public hearing for a RUTA-70 unit at Obninsk. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). The IAEA's 2016 booklet says IPPE proposed in 2004 to build the first reference RUTA-70 unit in Obninsk, where the institute is located, backed by a feasibility study by NIKIET, IPPE and Atomenergoproekt that found it should run alongside non-nuclear peak and off-peak sources in the town's district heating. These are feasibility findings; the booklet names no plot, heat-network connection agreement or water arrangement. Last checked 23 Oct 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2016 edition)
    What would change this

    A later IPPE or Rosatom document naming a site or heat-supply agreement for RUTA-70 in Obninsk. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 1 source with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.1 of 1 listed source has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(1)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004) — https://smrmap.com/projects/ruta-70-ippe-obninsk/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “RUTA-70 reference heating unit proposal at IPPE, Obninsk (2004)”. Record reviewed 3 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/ruta-70-ippe-obninsk/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.