Ward 250

Valar Atomics research reactor. CX-271015 defines the 250 designation as 250 kWth and describes an HTGR with helium coolant and graphite moderator and reflector. No electrical rating is stated. The company's 1 July 2026 electricity claim is not in that determination. DOE's July 2026 Reactor Pilot Program presentation records full power of 100 kW thermal and electricity generation on 2 July 2026, but gives no electrical rating. The recorded 250 kWth is the reactor designation/nameplate, not that demonstration's output. The electrical rating remains unknown; the design is not labeled thermal-only.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
Operating: Valar Atomics Ward 250. Development status as stated: full power 100 kWt achieved 2 July 2026 (DOE update, July 2026).
Evidence
4 sources; first primary source: DOE: Valar Atomics Ward 250 criticality. Record reviewed 7 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Developer / vendor(s)
Valar Atomics
Module thermal
0.25 MWth (nameplate; basis unspecified)
Fuel form
TRISO coated particle fuel
Enrichment
19.75 wt%
Development status (as stated)
full power 100 kWt achieved 2 July 2026 (DOE update, July 2026)
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
7 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Spectrum
Not recorded
Module electrical
Not recorded

Tracked deployment projects

Agreements naming this design (1)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(2 notes)
  • Evidence review. The DOE categorical exclusion defines Ward250 as a 250 kWth high-temperature gas-cooled research reactor using TRISO fuel, helium coolant, and a graphite moderator and reflector, at the Utah San Rafael Energy Research Center. A DOE article says Valar Atomics' Ward 250 completed a zero-power fueled criticality demonstration. The July 2026 DOE pilot-program slides list full power of 100 kWt on 2 July 2026 and a row of about 250 kWt for an HTGR in Emery County, Utah. The 100 kWt figure is an achieved test point, not a replacement of the 250 kWth design definition. Stored 0.25 MWth matches 250 kWth. None of these passages states a neutron spectrum. The words kilowatt thermal name the power unit. Last checked 19 Oct 2026. DOE categorical exclusion CX-271015 PDF: Ward250 research reactor; DOE: Valar Atomics Ward 250 criticality; DOE Office of Nuclear Energy: Reactor Pilot Program Update, slides filed with the NRC (ADAMS ML26198A212)
    What would change this

    A Valar or DOE design specification that states the neutron spectrum separately from the thermal-power unit. Next scheduled check: 19 Jan 2027.

  • Neutron spectrum: Not disclosed in the reviewed evidence. The categorical exclusion states helium coolant and a graphite moderator, and it uses kilowatt thermal as the power unit. It does not say thermal, fast or epithermal spectrum. Spectrum is not inferred from the moderator. Last checked 19 Oct 2026. DOE categorical exclusion CX-271015 PDF: Ward250 research reactor
    What would change this

    A Valar design summary that names the neutron spectrum of Ward250. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Environmental decision

  • DOE categorical exclusion CX-271015 for the Ward250 research reactor — Valar Atomics Ward 250
    Environmental decision · Issued / approved · U.S. Department of Energy, Office of Nuclear Energy · decided 22 Apr 2026
    Signed 22 April 2026 under NEPA identification DOE-ID-26-005. Determines that the 250 kWth Ward250 research reactor at USREL fits a categorical exclusion. It states no authorization number and no electrical output, and it does not confirm the company's later electricity claim.
    Sources: DOE categorical exclusion CX-271015 PDF: Ward250 research reactor