Policy and licensing / West Virginia
West Virginia: SMR policy and licensing
Selected federal, state, territory, and national measures whose official text was opened. This is not a complete list of laws, rules, programs or guidance for any jurisdiction. A jurisdiction without a page here is not a finding that it has no policy, and these pages do not rate or prefer any jurisdiction. Nothing here implies that a project is eligible for, or approved under, any measure.
89 projects in United States →
Federal measures apply in West Virginia as everywhere in the United States and are listed once on the federal page. They are not counted here.
Where licensing stands
Built only from the records on this page. It is not a complete account of the law and not legal advice.
- Authorities named in recorded applications, reviews and decisions
- None recorded: no application or decision for a tracked project here is recorded.
- Licensing law or framework in the record
- NRC licensing measures are recorded once, on the federal page (9 records).
- Latest recorded step
- Took effect : West Virginia Enrolled Senate Bill 4 (2022): repeal of the nuclear-construction article
- Open coverage gaps
- Commission or siting instruments (access blocked). What the review of 5 Oct 2026 read.
Laws, rules and executive directives
- West Virginia Enrolled Senate Bill 4 (2022): repeal of the nuclear-construction article · In effect
2022 W. Va. Acts, Enrolled Senate Bill 4 · West Virginia Legislature · affects: Siting
West Virginia Enrolled Senate Bill 4, passed on 31 January 2022, repeals Code sections 16-27A-1 and 16-27A-2. It took effect 90 days from passage, on 1 May 2022. Official code pages still use the ban article heading and display both sections as repealed. The repeal does not approve a reactor.
Not approved or pending: No replacement construction or siting statute was opened. The current code still titles the article as a ban even though both section bodies say repealed. No reactor approval is granted. No West Virginia site is tracked in this dataset. (Record checked .)
Bills, proposed rules and consultations
- None recorded.
Funding and support programs
- None recorded.
Regulatory guidance and inspector policies
- None recorded.
Recorded permissions and applications for tracked projects located in West Virginia
Listed by project location only, with each action's issuing authority recorded. The jurisdiction measures above do not themselves authorize reactor construction or operation.
- None recorded.
What this review has read for West Virginia
As of 5 Oct 2026. Bounded review concluded with access gaps. A published record above is separate from research coverage: a class can be blocked or unreviewed even where records are published. Coverage for every state and territory.
- Statutes, session laws and bills: Evidence read. Enrolled Senate Bill 4 (2022), repealing the nuclear-construction ban, and the current code pages for the repealed sections were read.
- Governor or energy instruments: None found in sources checked. The governor's executive-order index was read. It is an index, and no individual order was opened.
- Commission or siting instruments: Access blocked. The Secretary of State catalog page for rule 150-03 was opened. The rule file is an image scan without a text layer, so the rule text was not read. A commission docket link returned an error response (HTTP 400).
- Funding measures and awards: None found in sources checked. Code sections 5B-2N-2a (a grid fund for coal and natural-gas generation) and 5B-2N-2b (an energy strategy that includes nuclear-fueled energy) were read. Neither funds nuclear projects; the signed 2026 bill was not opened.
Sources read (8):
- www.wvlegislature.gov/Bill_Status/bills_text.cfm?billdoc=SB4%20ENR.htm&yr=2… · checked 4 Oct 2026
- code.wvlegislature.gov/16-27A-1/ · checked 4 Oct 2026
- code.wvlegislature.gov/16-27A-2/ · checked 4 Oct 2026
- code.wvlegislature.gov/24-2-1/ · checked 4 Oct 2026
- code.wvlegislature.gov/5B-2N-2a/ · checked 4 Oct 2026
- governor.wv.gov/executive-orders · checked 4 Oct 2026
- code.wvlegislature.gov/5B-2N-2b/ · checked 4 Oct 2026
- apps.sos.wv.gov/adlaw/csr/rule.aspx?rule=150-03 · checked 5 Oct 2026
Sources that could not be read (2):
- apps.sos.wv.gov/adlaw/csr/readfile.aspx?DocId=50441&Format=PDF · checked 5 Oct 2026 · image without readable text
- www.psc.state.wv.us/scripts/WebDocket/ViewDocument.cfm?CaseActivityID=66729… · checked 5 Oct 2026 · an error response (HTTP 400)