Gazprom study of four floating nuclear power units for the Tambey field cluster (Yamal)

Kommersant reported in June and October 2023 that Gazprom was studying four floating nuclear power units, about 400 MW in total, to supply the Tambey cluster of fields on Yamal. It is an option under study, no decision, order or berth has been recorded.

Type
Feasibility or siting study
Countries concerned
Russia
Participants and roles
Designs named
—
Scale as stated
four floating units, about 400 MW in total (press) · 4 units stated
Announced or first reported
Jun 2023
Status
Status not established
Gazprom considering the option, no decision, order or berth recorded.
Confidence
low
Last checked
2026-10-14 (record review date, not proof of current activity)