Rosatom
Russian state nuclear corporation behind KLT-40S floating plant, RITM series, and BREST-OD-300.
- Projects
- Operating: Akademik Lomonosov floating NPP. Furthest recorded stage of 14 as vendor, developer or operator. 3 designs.
- Evidence
- 2 sources; first primary source: Akademik Lomonosov floating NPP. Record reviewed 1 Oct 2026.
Key facts · Designs · Tracked projects · Agreements · Ownership · Milestones · Sources · Its projects in the table · Who is involved · Headlines naming this company (1)
Key facts
- Organization type
- Reactor developer, Vendor, Operator
- Category
- vendor
- Country
- Russia
- Aliases
- ROSATOM, State Atomic Energy Corporation Rosatom
- Listing status
- Not applicable
- Ownership / control
- State-controlled
Russian state nuclear corporation; not treated as a Western exchange listing. Some affiliates may have local listings — not assigned here. - Website
- https://www.rosatom.ru/
- Confidence
- medium
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current activity)
All fields
(1 without a known value)
- Exchange / ticker
- None recorded in this release
Linked designs
Tracked deployment projects
(14)
14 linked project records: 8 announced, 1 siting, 1 licensing, 3 construction, 1 operating, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- Akademik Lomonosov floating NPP — Operating · Russia
Recorded link: vendor/developer field · project record checked 18 Oct 2026 · timeline · permission status · sources - BREST-OD-300 Seversk — Construction · Russia
Recorded link: vendor/developer field · project record checked 18 Oct 2026 · timeline · permission status · sources - RITM-200N Jizzakh — Construction · Uzbekistan
Recorded link: vendor/developer field · project record checked 18 Oct 2026 · timeline · 2 recorded project actions · sources - Yakutia land-based RITM-200N (Ust-Kuyga) — Licensing · Russia
Recorded link: vendor/developer field · project record checked 18 Oct 2026 · timeline · permission status · sources - Baim / Cape Nagloynyn floating PEB-106 (RITM-200S) — Construction · Russia
Recorded link: vendor/developer field · project record checked 18 Oct 2026 · timeline · permission status · sources - West Kalimantan Rosatom floating RITM-200M proposal (2025) — Announced · Indonesia
Recorded link: project proposer · project record checked 6 Oct 2026 · timeline · permission status · sources - West Kalimantan Rosatom land-based SMR proposal (2025) — Announced · Indonesia
Recorded link: project proposer · project record checked 6 Oct 2026 · timeline · permission status · sources - Shelf-M small nuclear plant at the Sovinoe deposit, Chukotka — Siting · Russia
Recorded link: project proposer · project record checked 6 Oct 2026 · timeline · permission status · sources - Myanmar 110 MW SMR project (two RITM-200N; site not named) — Announced · Myanmar
Recorded link: vendor/developer field · project record checked 6 Oct 2026 · timeline · permission status · sources - Floating nuclear power unit for Gazprom's Kirinskoye fields, Sakhalin — Announced · Russia
Recorded link: vendor/developer field, project proposer · project record checked 2 Oct 2026 · timeline · permission status · sources - Norilsk land small nuclear plant (RITM-400) — Announced · Russia
Recorded link: project proposer · project record checked 6 Oct 2026 · timeline · permission status · sources - Kaliningrad floating small nuclear plants proposal — Announced · Russia
Recorded link: project proposer · project record checked 13 Oct 2026 · timeline · permission status · sources - First ELENA-AM thermoelectric heating pilot proposal — Announced · Russia
Recorded link: project proposer · project record checked 13 Oct 2026 · timeline · permission status · sources - Northern Halmahera floating nuclear power units (Rosatom, two FPU-100) — Announced · Indonesia
Recorded link: project proposer · project record checked 30 Oct 2026 · timeline · permission status · sources
Agreements
(18)
Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.
- Rosatom and PT Pembangkit Listrik Nuklir floating power agreement for northern Halmahera — Fleet agreement · Active · announced 20 Oct 2026
Recorded role: Developer or vendor - Rwanda Atomic Energy Board and Rosatom roadmap on small modular reactors (first Joint Coordinating Committee, 2026) — Cooperation agreement or MOU · Active · announced 29 Jun 2026
Recorded role: Developer or vendor - Rosatom and India's Ministry of Ports, Shipping and Waterways working group on floating nuclear power plants (2025) — Cooperation agreement or MOU · Active · announced Dec 2025
Recorded role: Developer or vendor - Diamante Energia evaluation of an SMR at the Jorge Lacerda coal complex (ANSN pre-licensing consultation, IAEA/ABDAN… — Feasibility or siting study · Active · announced Oct 2025
Recorded role: Other participant - Iran (AEOI) and Rosatom memorandum on building small nuclear power plants in Iran — Cooperation agreement or MOU · Status not established · announced Sep 2025
Recorded role: Developer or vendor - Brazil Ministry of Mines and Energy and Rosatom (Tenex) cooperation on uranium and small modular reactors (2025) — Cooperation agreement or MOU · Status not established · announced May 2025
Recorded role: Developer or vendor - Rosatom small nuclear power plant program (62 small reactors by 2039, four more floating plants) — National plan · Active · announced Dec 2024
Recorded role: Developer or vendor - Rosatom and Guinea memorandum to study floating nuclear power plants with RITM-200 reactors — Cooperation agreement or MOU · Status not established · announced Jun 2024
Recorded role: Developer or vendor - Iraq's consideration of SMRs and small-reactor cooperation talks with Russia — Government program · Status not established · announced Mar 2024
Recorded role: Developer or vendor - Primorsky Krai floating nuclear power units study (Rosatom) — Feasibility or siting study · Status not established · announced 2024
Recorded role: Developer or vendor - Rosatom early study of an additional modernised floating power unit for Pevek (Chukotka request) — Feasibility or siting study · Status not established · announced Oct 2023
Recorded role: Developer or vendor - Rosatom list of prospective Arctic sites for SHELF-M microreactor plants (Yakutia, Krasnoyarsk, Chukotka) — Feasibility or siting study · Status not established · announced Aug 2023
Recorded role: Developer or vendor - Gazprom study of four floating nuclear power units for the Tambey field cluster (Yamal) — Feasibility or siting study · Status not established · announced Jun 2023
Recorded role: Developer or vendor - Mongolia's small nuclear power plant plans and talks with Rosatom (RITM-200 offered) — Government program · Active · announced 2023
Recorded role: Developer or vendor - Kyrgyzstan and Rosatom small nuclear power plant memorandum and RITM-200N pre-feasibility work — Cooperation agreement or MOU · Active · announced 2022
Recorded role: Developer or vendor - Jordan Atomic Energy Commission SMR program (vendor studies, floating plant at Aqaba considered) — National plan · Active · announced Jun 2018
Recorded role: Developer or vendor - Philippine DOE and Rosatom cooperation on small modular reactor feasibility (2017 memorandum, 2019 agreement) — Cooperation agreement or MOU · Status not established · announced 13 Nov 2017
Recorded role: Developer or vendor - Feasibility study for a four-unit VK-300 nuclear cogeneration plant in the Arkhangelsk region — Feasibility or siting study · Completed · announced Apr 2007
Recorded role: Government
Ownership & relationships
- No dated parent/JV relationships recorded beyond ownership notes.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(2)
- Akademik Lomonosov floating NPP (company, accessed 1 Oct 2026)
- World Nuclear Association — Small Nuclear Power Reactors (directory or tracker, accessed 1 Oct 2026)