Projects / Russia · Announced
Floating nuclear power unit for Gazprom's Kirinskoye fields, Sakhalin
A floating nuclear power unit for Gazprom's Kirinskoye fields in Sakhalin, Russia, is at the study stage, an option Gazprom confirmed in October 2023 it was considering.
Current status
- How current
- General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- No map pin is shown for this record.
- Same design
- 2 tracked: 1 construction, 1 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
Sakhalin's 2023-2027 electricity plan records Rosatom and Gazprom working out power for the Kirinskoye and Yuzhno-Kirinskoye fields from a modernised floating unit of 116 MW with two RITM-200S reactors; Gazprom confirmed in October 2023 it was considering the option. No decision or contract was found; later status is unconfirmed.
Key facts
- Design
- RITM-200S (SMR)
- Technology
- Integral pressurized water reactor (iPWR) · light water. The NEA SMR Dashboard describes the RITM-200S as an integral pressurised water reactor for floating nuclear power plants.
- Operator(s)
- Gazprom
- Vendor for linked design
- Rosatom
- Location
- Kirinskoye and Yuzhno-Kirinskoye gas-condensate fields · Russia · precision: site area (named plant, laboratory, base, port, campus or parcel)
The sources name this place but publish no coordinate for it, so no pin is shown. - Coordinates
- Named site, no map pin
- Electrical capacity
- 116 MWe (gross/net unspecified) · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
Floating nuclear power unit for Gazprom's Kirinskoye fields, Sakhalin is recorded at Kirinskoye and Yuzhno-Kirinskoye gas-condensate fields, Sakhalin Oblast, Russia. Operator: Gazprom. Recorded vendor: Rosatom. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); named site, no map pin.
Recorded electrical output is 116 MWe (gross/net unspecified), scope plant. Modules planned: 2. Thermal output is not recorded on this project. The linked design record states 190 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project. The linked design record states 58 MWe (gross); the project figure is kept separate.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Operator or intended licensed owner
- OperatorGazprom
- Reactor supplier
- Vendor for the linked designRosatom
- Customer or offtaker
- Prospective customer / offtaker (binding offtake not established)Gazprom · sourceOctober 2023 discussions considered floating nuclear supply for Gazprom’s Sakhalin fields. Prospective consumption only; no contract, ownership or funding is established and continued talks are not verified.
Source-backed project statement
Kommersant reported on 2 October 2023 that Gazprom confirmed it is considering floating nuclear units for external power supply to objects of its Sakhalin gas-production center. The article says the Kirinskoye and Yuzhno-Kirinskoye fields would need 45 megawatts by 2042, with the remaining output going to Sakhalin consumers, and that Rosatom did not answer. This is a confirmed discussion, not a supply contract. Kommersant: Gazprom confirms it is considering floating nuclear units
- Programs and agreements naming the project
- Feasibility or siting study; status not establishedGazprom study of four floating nuclear power units for the Tambey field cluster (Yamal)
Not found in the sources we checked (4): Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Contractor
Kommersant reported on 2 October 2023 that, according to Sakhalin's 2023-2027 electricity plan, Rosatom may build RITM-200S floating units for Gazprom's Kirinskoye and Yuzhno-Kirinskoye fields, and that Gazprom was considering the option. That describes Rosatom's possible role as supplier, which the record already holds, not an appointed construction contractor. No contract or named builder is reported. Kommersant: Gazprom confirms it is considering floating nuclear units
- Funding and government decisions
Kommersant's 2 October 2023 article quotes analysts estimating that one floating unit could cost 45 to 50 billion rubles. That is an outside cost estimate, not financing, and the article names no funder, allocation or investment decision for a Kirinskoye unit. A 190.2 billion ruble figure in the same article is for the separate Baimskaya floating units. Kommersant: Gazprom confirms it is considering floating nuclear units
- Fuel
- No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.
Kommersant's 2 October 2023 article mentions reactor refuelling outages only as a reason for reserve capacity. It names no fuel supplier, quantity or delivery for a Kirinskoye floating unit. Kommersant: Gazprom confirms it is considering floating nuclear units
- Comparable schedule revision
Comparable schedule revision not established. Kommersant's 2 October 2023 article gives a field power-demand estimate of 45 MW by 2042 and production dates for the Yuzhno-Kirinskoye gas field, which it says had slipped several times. Those dates concern gas production, not the floating unit. The article and the April 2023 Sakhalin decree card give no construction or operation date for the floating unit. Kommersant: Gazprom confirms it is considering floating nuclear units; Sakhalin Oblast Governor's Decree No. 19: electricity scheme and programme 2023-2027
Not recorded in SMRMap's reviewed evidence (1): Site host or owner
- Site host or owner
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(5 notes, 1 not yet reviewed)
- Evidence review. Kommersant's 2 October 2023 account describes Gazprom discussing floating nuclear units with Rosatom for the Kirinskoye and Yuzhno-Kirinskoye fields. It cites the Sakhalin 2023–2027 electricity scheme for RITM-200S units and uses both 116 MW and up to 116 MW. Those are prospective source descriptions, not an executed contract or measured output. The captured decree page does not contain the scheme itself, so it does not independently verify its reactor count or exact siting. The stored count is not erased merely because this excerpt omits it; the original scheme remains the settling document. The customer fields do not locate a platform berth. Design and announced stage remain, without new permission or operating-authority claims. Last checked 19 Oct 2026. Kommersant: Gazprom confirms it is considering floating nuclear units
What would change this
A Gazprom or Rosatom contract, or the Sakhalin scheme text itself, naming the unit count and a berth would change this record. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed. Kommersant names the Kirinskoye and Yuzhno-Kirinskoye fields as the loads. It does not name a berth for the floating units. The fields are a named place without coordinates, so they are recorded as a named site without a pin, with the berth still unstated. Last checked 19 Oct 2026. Kommersant: Gazprom confirms it is considering floating nuclear units
What would change this
The scheme or a contract naming the mooring point would fix the berth. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites: Not disclosed in the reviewed evidence. The article says Gazprom is considering the option and that Rosatom did not answer the newspaper. It names no pending license, siting decision or contract for these fields. Last checked 23 Oct 2026. Kommersant: Gazprom confirms it is considering floating nuclear units
What would change this
A Gazprom or Rosatom decision, or a filed application, for floating units at these fields. Next scheduled check: 21 Jan 2027.
- Permissions and public process: Not disclosed in the reviewed evidence. Kommersant (2 October 2023) links the floating-unit option for the Kirinskoye fields to Sakhalin's 2023–2027 electricity scheme, approved by the governor's decree of 28 April 2023; the text of the scheme itself was not reviewed. A regional electricity plan is not a project permission, and no license application, siting decision or public consultation is described. Last checked 23 Oct 2026. Sakhalin Oblast Governor's Decree No. 19: electricity scheme and programme 2023-2027; Kommersant: Gazprom confirms it is considering floating nuclear units
What would change this
A readable copy of the 2023-2027 scheme entry, or a siting or construction decision for these units. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water): Not disclosed in the reviewed evidence. The 2 October 2023 article says the Kirinskoye field energy district is currently isolated. In the same passage an analyst says a refuelling outage would require extra units and a scheme to deliver output to the regional grid. No land, mooring, water or interconnection agreement is stated. Last checked 23 Oct 2026. Kommersant: Gazprom confirms it is considering floating nuclear units
What would change this
A mooring, land, water or grid agreement for floating units at these fields. Next scheduled check: 21 Jan 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 2 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(2)
- Sakhalin Oblast Governor's Decree No. 19: electricity scheme and programme 2023-2027 (government, accessed 2 Oct 2026)
- Kommersant: Gazprom confirms it is considering floating nuclear units (news report, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Floating nuclear power unit for Gazprom's Kirinskoye fields, Sakhalin — https://smrmap.com/projects/gazprom-kirinskoye-floating/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Floating nuclear power unit for Gazprom's Kirinskoye fields, Sakhalin”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/gazprom-kirinskoye-floating/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.