Projects / United States · Announced

Ameren / Westinghouse SMR proposal at Callaway (2012)

Ameren Missouri and Westinghouse's Callaway SMR plan began in April 2012, when they formed an alliance to seek DOE funding and an NRC combined license.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 4 of 5 listed sources have a publication or document date recorded here; the newest is 21 Feb 2014. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

The plan was for a 225 MW Westinghouse SMR, built in transportable modules, at the Callaway site. World Nuclear News reported in February 2014 that a combined license application was still planned, with start-up of the first units delayed by several years. That is the newest source read: no license or construction followed in the sources opened, and later status has not been traced.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Ameren Missouri
Vendor for linked design
No selected-design vendor recorded
Location
Callaway site (Ameren Missouri) · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain reactors export point for the existing Callaway plant (CC BY 4.0, derived from GEM's Global Nuclear Power Tracker); plant-area point for the 2012 small modular reactor proposal at the same site, not an SMR position.
Coordinates
38.7589, -91.7788 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Ameren / Westinghouse SMR proposal at Callaway (2012) is recorded at Callaway site (Ameren Missouri), Missouri, United States. Operator: Ameren Missouri. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'callaway-nuclear-power-plant-1' (38.7589, -91.7788)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Operator or intended licensed owner
Contractor

Source-backed project statement Westinghouse's 17 May 2012 release announced the Ameren Missouri-led NexStart SMR Alliance to support Westinghouse's DOE application and a strategy for design certification and a combined license for a Westinghouse SMR at Callaway. World Nuclear News reported on 22 May 2012 that engineering firm Burns & McDonnell and General Dynamics Electric Boat had joined. These are application and licensing-preparation roles. No license, engineering contract or construction award followed in the sources read. Westinghouse and Ameren Missouri announce NexStart SMR Alliance; WNN: SMR vendors apply for government funds; ENR: Department of Energy moves forward on small modular reactors

Not found in the sources we checked (4): Customer or offtaker; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

Ameren Missouri's 19 April 2012 release, Westinghouse's 17 May 2012 NexStart release and the 2012 World Nuclear News and Engineering News-Record reports name no buyer of power from a Westinghouse SMR at Callaway. The alliance utilities are named as supporters of a funding application and a potential deployment, and the April release says a combined license would not obligate Ameren Missouri to build. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds; Westinghouse and Ameren Missouri announce NexStart SMR Alliance

Funding and government decisions

Ameren Missouri's 19 April 2012 release says it agreed to support Westinghouse's application for DOE small modular reactor funds of up to $452 million for up to two designs, and World Nuclear News reported the application was filed on 18 May 2012. Engineering News-Record reported on 28 November 2012 that the first award went to the Babcock & Wilcox, Bechtel and TVA team. No source read awards or pays money to the Callaway proposal. The $452 million is the program ceiling, not this project's funding. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds; Westinghouse and Ameren Missouri announce NexStart SMR Alliance; WNN: SMR vendors apply for government funds; ENR: Department of Energy moves forward on small modular reactors

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

Ameren Missouri's 19 April 2012 release describes a 225 MW Westinghouse SMR based on the AP1000 but names no fuel supplier, fabrication or delivery for Callaway. The later 2012 alliance release and press reports read also name no fuel arrangement. A general risk sentence about the cost of enriched uranium for Ameren's existing generation is not a commitment for this proposal. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds

Comparable schedule revision

Comparable schedule revision not established. Ameren Missouri's 19 April 2012 release expected a DOE funding decision in the summer of 2012, and Westinghouse's 17 May 2012 release expected it in late summer and stated an aim for Callaway operation by 2022. The 2022 aim is stated once, and the funding decision is a program step rather than a Callaway construction or operation milestone. No source read revises a date for this proposal. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds; Westinghouse and Ameren Missouri announce NexStart SMR Alliance; ENR: Department of Energy moves forward on small modular reactors

Not recorded in SMRMap's reviewed evidence (3): Reactor supplier; Site host or owner; Programs and agreements naming the project
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes, 1 not yet reviewed)
  • Evidence review. Ameren Missouri's release of 19 April 2012 says it entered an agreement with Westinghouse to support Westinghouse's application for DOE small modular reactor funds of up to $452 million, and it describes a 225 MW reactor whose technology is based on the AP1000. The same release says a combined license would not obligate Ameren Missouri to build an SMR at the Callaway site. No later license, construction or cancellation is in the opened text. The 225 MW figure has no gross or net basis and is not proposed for storage. No design record is proposed, because the 2012 Westinghouse SMR is not identified here as AP300. The stored announced stage stays. Ameren is the applicant-side utility in this release, not a named licensed operator. Last checked 19 Oct 2026. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds
    What would change this

    A later Ameren or NRC document showing whether the 2012 Callaway SMR application was filed, withdrawn or replaced would change this record. Next scheduled check: 19 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. The release names a Westinghouse SMR of 225 MW based on the AP1000. It does not name AP300 or another cataloged design. The design is described, but not identified with a stored design record. Last checked 19 Oct 2026. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds
    What would change this

    A design certification or application naming the reactor model for Callaway would settle the design link. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed. The release names the Callaway site as the place an SMR could be built. No coordinates are in the quoted passage. Last checked 19 Oct 2026. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds
    What would change this

    An application with a site map would allow a finer location. Next scheduled check: 19 Jan 2027.

  • Permissions and public process. Ameren Missouri's 19 April 2012 release says that, should Westinghouse win DOE SMR investment funds, Ameren would seek an NRC combined construction and operating license for a Westinghouse SMR at the Callaway site, and that obtaining one would not oblige it to build. The application was conditional on the DOE award, and the sources read record no license application, license or public hearing for this proposal. Last checked 23 Oct 2026. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds
    What would change this

    A record of an NRC combined license application for a Westinghouse SMR at Callaway. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Ameren Missouri's April 2012 release places the proposed Westinghouse SMR at the Callaway site, home of its existing Callaway Energy Center nuclear plant. The release identifies the site only; it describes no specific plot, grid connection, cooling-water arrangement or other infrastructure for the SMR. Last checked 23 Oct 2026. Ameren Missouri forms an alliance with Westinghouse to apply for DOE SMR funds
    What would change this

    A license application or site study describing the SMR's location and connections at Callaway. Next scheduled check: 23 Apr 2027.

  • Next decision and prerequisites. World Nuclear News reported on 21 February 2014 that DOE had funded B&W's mPower and NuScale instead of the Westinghouse SMR, that Westinghouse was reassessing its design certification schedule, and that the planned combined license application for Ameren's Callaway site would be delayed by several years. The next steps were therefore a rescheduled Westinghouse design certification application and then Ameren's license application. No later source read records either step or a formal end to the plan. Last checked 23 Oct 2026. Westinghouse SMR progress slows
    What would change this

    A source recording that Ameren or Westinghouse abandoned the Callaway SMR plan, or filed for it. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(4 of 5 sources with a publication or document date)
Latest dated listed source publication: Westinghouse SMR progress slows: 21 Feb 2014.Latest dated recorded event: no date recorded.1 of 5 listed sources has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Ameren / Westinghouse SMR proposal at Callaway (2012) — https://smrmap.com/projects/ameren-callaway-wsmr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Ameren / Westinghouse SMR proposal at Callaway (2012)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/ameren-callaway-wsmr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.