Projects / Canada · Suspended

Global First Power Chalk River MMR (paused)

CNSC paused the Chalk River environmental assessment and site-preparation license review in August 2024.

Current status

Stage
Suspended
How current
General record check . Bounded evidence review . 2 of 4 listed sources have a publication or document date recorded here; the newest is 14 Nov 2023. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Description

Its facility table specifies up to one reactor and up to 45 MWth, not an exact achieved output. The table's "Up to 1 reactor" is an upper bound and is not stored as a selected module count. Electrical output is unspecified in that table and remains unknown; no thermal-only use is inferred. The older 15 MWth / 5 MWe proposal is not treated as the current configuration. A paused application review is not a license grant or evidence that the reactor was built. The same table names Global First Power as licensee for the proposed project.

Key facts

Design
Global First Power Micro Modular Reactor (Microreactor)
Technology
High-temperature gas-cooled reactor (HTGR) · helium
Operator(s)
Global First Power
Vendor for linked design
—
Location
Chalk River Laboratories site, Renfrew County · Canada · precision: site area (named plant, laboratory, base, port, campus or parcel)
Coordinates for the named Chalk River area from the NuclearChain reactors export (CC BY 4.0; derived from GEM's tracker); Global First Power MMR proposal at Chalk River.
Coordinates
46.05, -77.3636 · site-area point (approximate)
Electrical capacity
Not recorded · scope: module
CNSC states an upper bound of up to 45 MWth for up to one proposed reactor.
Thermal capacity
Not recorded
Modules planned
Not recorded. The CNSC facility table says the number of units is up to one reactor.
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
19 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

Global First Power Chalk River MMR (paused) is recorded at Chalk River Laboratories site, Renfrew County, Ontario, Canada. Operator: Global First Power. Recorded vendor: No vendor is recorded. Stage: Suspended. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'chalk-river-nuclear-power-plant' (46.05001, -77.3636)

Electrical output is not recorded on this project. CNSC states an upper bound of up to 45 MWth for up to one proposed reactor. Module count is not recorded. Thermal output is not recorded on this project. The linked design record states up to 45 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Operator or intended licensed owner
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

The page identifies the Chalk River Laboratories site as the proposed location. A site name is not a customer. No buyer, quantity, or power agreement is stated. CNSC Global First Power project status

Contractor

The page says Global First Power was seeking a license to prepare a site. A site-preparation application is not a construction license or an EPC award, and the page does not say it was granted. No engineering firm is named. Ultra Safe Nuclear Corporation is described as the parent, not a construction contractor. CNSC Global First Power project status

Funding and government decisions

The page links to participant funding for review of a draft environmental impact statement and states no amount, recipient award, or disbursement in the text read. The October 2024 Chapter 11 filing is the parent's court proceeding, not a project allocation. No capital figure is disclosed. CNSC Global First Power project status

Fuel
No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.

The facility table states the reactor type and an upper bound of 45 megawatts thermal. The page does not name a fuel supplier, enrichment, or delivery for this project. CNSC Global First Power project status

Comparable schedule revision

Comparable schedule revision not established. August 2024 is the pause date. The 15 January 2026 modification date confirms the same paused status. It does not replace a construction or operation date. There are not two dated statements of the same milestone. The older 15 megawatt-thermal and 5 megawatt-electric description remains a different configuration, as the summary already says. CNSC Global First Power project status

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Reactor supplier; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Assessments of the design (not of this site)

(1)
  • CNSC vendor design review, Phase 1 (USNC MMR) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · CNSC · completed Feb 2019
    CNSC lists Phase 1 of its pre-licensing vendor design review of the MMR by USNC-Power Ltd. (Ultra Safe Nuclear Corporation) among completed reviews, with an executive summary dated February 2019. No later phase is listed. CNSC's Chalk River project page names Ultra Safe Nuclear Corporation as the parent of Global First Power, whose proposed micro modular reactor this profile records. CNSC staff paused the Chalk River environmental assessment and licence-to-prepare-site application review as of August 2024. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
    Sources: CNSC: vendor design review service agreements and completed reviews; CNSC Global First Power project status

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes)
  • Evidence review. The CNSC project page, modified 15 January 2026, says the current status is paused. Global First Power was seeking a license to prepare a site for a micro modular reactor at Chalk River Laboratories in Renfrew County, Ontario. CNSC staff paused the environmental assessment and the application review as of August 2024. The facility table says up to one reactor and up to 45 MW thermal. Those are ceilings and are not stored. The page says Ultra Safe Nuclear Corporation, the parent of Global First Power, filed for Chapter 11 protection in October 2024. The attached Global Energy Monitor page is the tracker method page and does not name this project. A license to prepare a site is not a construction license, and the page does not say the application was granted or refused. Last checked 20 Oct 2026. CNSC Global First Power project status
    What would change this

    A CNSC notice that resumes, refuses, or closes the Chalk River site-preparation application. Next scheduled check: 20 Jan 2027.

  • Module/unit count: Not disclosed in the reviewed evidence. The CNSC facility table says the number of units is up to one reactor. That is an upper bound, not a selected module count, so no count is stored. Last checked 19 Oct 2026. CNSC Global First Power project status
    What would change this

    A CNSC or proponent document states a selected reactor count for Chalk River. Next scheduled check: 19 Jan 2027.

  • Plant capacity (scope qualified). CNSC states an upper bound of up to 45 MWth for up to one proposed reactor. The source gives a ceiling; it does not establish an exact project thermal output or an electrical rating. Last checked 15 Oct 2026. CNSC Global First Power project status
    What would change this

    A CNSC or proponent filing identifies a revised output/configuration or resumes the paused project review. Next scheduled check: 13 Jan 2027.

  • Next decision and prerequisites. The CNSC paused the environmental assessment and license review in August 2024 after the proponent's parent entered bankruptcy protection. Any next step depends on the application being withdrawn, transferred to a new owner or resumed; the page records none of these. Last checked 23 Oct 2026. CNSC Global First Power project status
    What would change this

    A CNSC update on the application's withdrawal, transfer or resumption. Next scheduled check: 21 Jan 2027.

  • Permissions and public process. Global First Power sought a CNSC license to prepare site, with an environmental assessment under way. The CNSC page says staff paused all work on the assessment and the license review in August 2024, and that the parent company Ultra Safe Nuclear Corporation filed for US Chapter 11 protection in October 2024. No license was issued. Last checked 23 Oct 2026. CNSC Global First Power project status
    What would change this

    A CNSC notice that the application has been withdrawn, transferred or resumed. Next scheduled check: 21 Jan 2027.

  • Site dependencies (land, grid, water). The proposed location was the Chalk River Laboratories site in Renfrew County, Ontario. The CNSC page describes no land agreement, grid connection or water arrangement, and the review that would have examined them is paused. Last checked 23 Oct 2026. CNSC Global First Power project status
    What would change this

    Resumed CNSC review documents or a new proponent's site description. Next scheduled check: 21 Jan 2027.

  • Spent fuel, waste and closure. Global First Power's August and November 2023 letters to the CNSC, posted on the federal assessment registry, say the updated MMR design adds interim on-site storage of used fuel during operation, before transfer to an off-site interim storage facility; the earlier description allowed storage on the plant site or transfer to an interim facility at end of life. These are proponent descriptions for an environmental impact statement that was not completed before the review was paused. They name no storage license, receiving facility or disposal agreement. Last checked 23 Oct 2026. GFP Evaluation of CEAA 2012 Factors - Applicability to Updated Project Description for MMR at Chalk River (GFP01-CORR-BUS-00068); Update to the Project Description for the Micro Modular Reactor Project at Chalk River (GFP01-CORR-BUS-00055)
    What would change this

    A resumed environmental impact statement, a CNSC license decision or a withdrawal of the project would change this answer. Next scheduled check: 23 Apr 2027.

Evidence dates

(2 of 4 sources with a publication or document date)
Latest dated listed source publication: GFP Evaluation of CEAA 2012 Factors - Applicability to Updated Project Description for MMR at Chalk River (GFP01-CORR-BUS-00068): 14 Nov 2023.Latest dated recorded event: no date recorded.2 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Global First Power Chalk River MMR (paused) — https://smrmap.com/projects/chalk-river-mmr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Global First Power Chalk River MMR (paused)”. Record reviewed 19 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/chalk-river-mmr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.