Global First Power Micro Modular Reactor

The CNSC describes the Chalk River Micro Modular Reactor proposal as a high-temperature gas-cooled reactor with up to 45 MWth. That ceiling is not an exact achieved output. Its current facility table does not state electrical output, so the electrical rating remains unknown rather than described as thermal-only. CNSC paused the environmental assessment and site-preparation license review in August 2024. This profile preserves the Chalk River configuration and does not establish that it is identical to NANO Nuclear's later KRONOS configuration.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
No live project recorded here; 1 suspended (Global First Power Chalk River MMR).
Evidence
One source (regulator): CNSC Global First Power project status. Record reviewed 1 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Developer / vendor(s)
Global First Power
Module thermal
up to 45 MWth (nameplate; basis unspecified)
Inclusion basis
Labeled microreactor
Confidence
medium
Not yet recorded
Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
Record reviewed
1 Oct 2026 (record review date, not proof of current availability or a deployment)

All fields

(2 without a known value)
Spectrum
Not recorded
Module electrical
Not recorded

Tracked deployment projects

Agreements naming this design (2)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(1)

Evidence and open questions

(3 notes)
  • Evidence review. The CNSC's Global First Power Micro Modular Reactor Project page (modified 15 January 2026) describes Global First Power's proposal for a license to prepare site for a micro modular reactor at the Chalk River Laboratories site in Renfrew County, Ontario. Its facility table gives a high-temperature gas-cooled reactor, up to 1 reactor and installed capacity up to 45 MWth; that is a ceiling for the proposed facility, not an achieved output, and no electrical output or purpose is stated. CNSC staff paused all work on the environmental assessment and the licence-to-prepare-site review as of August 2024, and the page notes that Ultra Safe Nuclear Corporation, GFP's parent, filed for Chapter 11 protection in October 2024. The page connects this configuration to the linked, paused Chalk River deployment. It names GFP as the applicant and USNC as its parent but does not name a reactor designer; the stored HTGR family and up-to-45 MWth rating match, the stored helium coolant is not stated on the page (only 'gas-cooled'), and no source states the neutron spectrum. Last checked 19 Oct 2026. CNSC Global First Power project status
    What would change this

    A CNSC decision to resume or close the Chalk River review, or a design document for this Chalk River MMR configuration stating its coolant and neutron spectrum. Next scheduled check: 19 Jan 2027.

  • Module rating. CNSC states up to 45 MWth for up to one reactor. Electrical output is not specified; that is not a thermal-only classification. Last checked 15 Oct 2026. CNSC Global First Power project status
    What would change this

    A CNSC or proponent document changes the Chalk River configuration, specifies electrical output or resumes the paused review. Next scheduled check: 13 Jan 2027.

  • Neutron spectrum: Not disclosed in the reviewed evidence. The only attached source, the CNSC project page, identifies a high-temperature gas-cooled reactor of up to 45 MWth but does not state the neutron spectrum. Last checked 19 Oct 2026. CNSC Global First Power project status
    What would change this

    A CNSC licensing document (for example GFP's draft environmental impact statement project description) or a GFP/USNC design description for the Chalk River MMR stating the spectrum. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Design assessment

  • CNSC vendor design review, Phase 1 (USNC MMR) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · CNSC · completed Feb 2019
    CNSC lists Phase 1 of its pre-licensing vendor design review of the MMR by USNC-Power Ltd. (Ultra Safe Nuclear Corporation) among completed reviews, with an executive summary dated February 2019. No later phase is listed. CNSC's Chalk River project page names Ultra Safe Nuclear Corporation as the parent of Global First Power, whose proposed micro modular reactor this profile records. CNSC staff paused the Chalk River environmental assessment and licence-to-prepare-site application review as of August 2024. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions.
    Sources: CNSC: vendor design review service agreements and completed reviews; CNSC Global First Power project status