Projects / prj-kaliningrad-floating-smr-proposal

Kaliningrad floating small nuclear plants proposal

Rosatom’s own 1 October 2026 account of its director-general’s presidential meeting says small floating nuclear plants will be deployed in Kaliningrad region as part of the energy-fleet initiative. This is one regional proposal record with an unknown number of plants and modules, not a counted fleet of approved units. No berth, selected reactor variant, capacity, operator or project-specific permission is established. The adjacent discussion of 28 RITM installations is a wider manufacturing portfolio, not Kaliningrad’s unit count.

What this record says

Last verified 2026-10-13. This is a record review date, not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Site and deployment

Kaliningrad floating small nuclear plants proposal is recorded at Kaliningrad region floating-plant location (undisclosed), Kaliningrad Oblast, Russia. Operator: No operator is recorded. Vendor for a linked design: No selected-design vendor is recorded. Stage: Announced. Location precision: undisclosed. Other documented relationships: Project proposer: Rosatom.

Capacity

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Permission recorded

Latest supported development

No actual dated development is recorded.

Next documented milestone

No next milestone date is recorded.

Material unknowns

Stage
Announced
Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Other documented relationships
Location
Kaliningrad region floating-plant location (undisclosed) · Russia · precision: undisclosed
Only the region is named. No port, berth, city-centre or regional-centroid point substituted.
Coordinates
undisclosed / not plotted
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
—
Inclusion basis
smr_by_design_class
Confidence
medium
Last verified
2026-10-13 (publication/verification date)

Milestones & dated events

Regulatory actions

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Sources