Projects / United States · Announced

Nine Mile Point Gen III+ SMR early site permit evaluation

Constellation's January 2025 announcement proposes early-site-permit work for one or more advanced reactors at Nine Mile Point, with NYSERDA cost-share support.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 4 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

DOE's May 2026 award names Constellation SMR Development, LLC and $17,264,292 for pursuing an ESP at a New York location, without naming Nine Mile Point. An issued permit, selected reactor model and future operating entity are not established. The proposed reactor remains separate from the existing units and the canceled large Unit 3 proposal.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
Nine Mile Point Clean Energy Center (advanced/SMR ESP evaluation) · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
NuclearChain export station point (derived from GEM's tracker) for the existing Nine Mile Point plant, the named host of the ESP evaluation; plant-area pin, because new SMR coordinates within the site are not fixed.
Coordinates
43.5205, -76.4068 · site-area point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Nine Mile Point Gen III+ SMR early site permit evaluation is recorded at Nine Mile Point Clean Energy Center (advanced/SMR ESP evaluation), New York, United States. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).

Coordinate source: NuclearChain reactors.csv export (unit coordinates), NuclearChain reactors.csv row 'nine-mile-point-nuclear-power-plant-smr' (43.5205, -76.4068)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Funding and government decisions

Source-backed project statement Constellation's January 2025 release says New York's energy research authority joined its proposal for Department of Energy support of an early site permit for one or more advanced reactors at Nine Mile Point, and calls that cost-share funding a first step, with no amount or payment stated. The Department of Energy's May 2026 award of 17,264,292 dollars to Constellation SMR Development, LLC is for an early site permit at a New York location and does not name Nine Mile Point. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; DOE: $94M awards to expedite Gen III+ SMR deployments (Constellation $17.264M)

Not found in the sources we checked (4): Customer or offtaker; Contractor; Fuel; Comparable schedule revision
Customer or offtaker

Constellation's 15 January 2025 release describes an early site permit effort for one or more advanced reactors at Nine Mile Point and refers to statewide households and businesses, and DOE's 14 May 2026 award supports an early site permit for a New York location. Neither names a buyer of power from a new reactor. Constellation's Google and Amazon agreements listed on the same page concern other plants. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; DOE: $94M awards to expedite Gen III+ SMR deployments (Constellation $17.264M)

Contractor

Constellation's 15 January 2025 release says NYSERDA joined its grant proposal to seek an early site permit at Nine Mile Point, which is a cost-share partnership, not a contractor role. Neither that release, POWER Magazine's 16 January 2025 report nor DOE's 14 May 2026 award names an engineering firm or reactor vendor for the project. Constellation's Rolls-Royce SMR interest concerns the Netherlands. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; POWER: Constellation seeking permit for SMR at Nine Mile Point; Syracuse.com: DOE awards Constellation $17.3M for Nine Mile Point ESP

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

Constellation's 15 January 2025 release names no fuel supplier for a new Nine Mile Point reactor, and the fuel-fabrication awards on DOE's 14 May 2026 page, to Framatome in Richland and Global Nuclear Fuel in Wilmington, do not name Nine Mile Point. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; DOE: $94M awards to expedite Gen III+ SMR deployments (Constellation $17.264M)

Comparable schedule revision

Comparable schedule revision not established. Constellation's 15 January 2025 release, POWER Magazine's 16 January 2025 report and DOE's 14 May 2026 award give no construction or operation year for a new Nine Mile Point reactor. The early site permit's 10 to 20 year validity and DOE's reference to new generation in the 2030s are not project targets, so there is nothing to revise. Constellation: NY joins pursuit of DOE funding for advanced nuclear at Nine Mile Point; POWER: Constellation seeking permit for SMR at Nine Mile Point; DOE: $94M awards to expedite Gen III+ SMR deployments (Constellation $17.264M)

Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(6 notes)

Evidence dates

(0 of 4 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.4 of 4 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(4)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Nine Mile Point Gen III+ SMR early site permit evaluation — https://smrmap.com/projects/nine-mile-point-advanced-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Nine Mile Point Gen III+ SMR early site permit evaluation”. Record reviewed 2 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/nine-mile-point-advanced-smr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.