Blykalla SEALER Norrsundet / Gävle proposal

Blykalla submitted a government application for six reactors totalling 330 MW at Norrsundet on 18 May 2026. Sweden recorded a separate state-support application on 5 June. These applications do not establish permission to construct or committed funding. The site is distinct from Untra.

Stage
Licensing
Design
SEALER (SMR)
Technology
Lead-cooled fast reactor (LFR) · lead
Operator(s)
Blykalla
Vendor(s)
Blykalla
Location
Blykalla SEALER Norrsundet / Gävle proposal location · Sweden · precision: undisclosed
Searchable without an invented map pin.
Coordinates
undisclosed / not plotted
Electrical capacity
330 MWe (nameplate (gross/net unspecified)) · scope: plant
Thermal capacity
—
Modules planned
6
Inclusion basis
smr_by_vendor_claim_with_capacity_check
Confidence
medium
Last verified
2026-10-01 (publication/verification date)