Where SMR designs come from
Which countries' reactor designs are proposed or built in which others, from SMRMap's published project records. A design's origin is the country recorded for its vendor organization.
In short
46 of 222 published projects use a reactor design whose vendor is recorded in another country.
They come from 10 origin countries into 17 host countries; the largest are United States to Poland (9), United States to United Kingdom (7) and United States to Canada (5).
115 projects use a design from a vendor in their own country.
60 projects have no recorded design and 1 has a design without a recorded vendor country, so they are not counted here.
By origin country
Counts here are project records: a project whose design has vendors in two other countries is listed under both. Only origins with a project record in another country appear.
United States (28 project records into 8 countries)
- Poland (9):
- Last Energy ten-SMR plant for the Legnica Special Economic Zone (2022) · Announced · design PWR-20 · no map point
- OSGE Dąbrowa Górnicza BWRX-300 proposal · Siting · design BWRX-300
- OSGE Kraków / Nowa Huta BWRX-300 proposal · Siting · design BWRX-300
- OSGE Ostrołęka BWRX-300 proposal · Siting · design BWRX-300
- OSGE Stalowa Wola BWRX-300 · Siting · design BWRX-300
- OSGE Stawy Monowskie BWRX-300 · Siting · design BWRX-300
- OSGE Warsaw potential BWRX-300 location (2023 list) · Announced · design BWRX-300 · no map point
- OSGE Wloclawek BWRX-300 · Siting · design BWRX-300
- ZE PAK–SGE Pątnów BWRX-300 proposal · Announced · design BWRX-300
- United Kingdom (7):
- Centrica / X-energy Xe-100 plant at Hartlepool · Announced · design Xe-100
- Community Nuclear Power North Teesside AP300 proposal · Announced · design AP300 · no map point
- GE Hitachi PRISM plutonium-reuse proposal at Sellafield (not taken forward) · Canceled · design PRISM
- Holtec / EDF SMR-300 proposal at Cottam · Announced · design Holtec SMR-300
- Last Energy Llynfi PWR-20 proposal · Siting · design PWR-20
- Last Energy London Gateway PWR-20 proposal · Announced · design PWR-20
- Shearwater NuScale Wylfa feasibility proposal (2021) · Announced · design NuScale VOYGR (US460 / NPM)
- Canada (5):
- Belledune Prodigy transportable nuclear proposal · Announced · design BWXT BANR · no map point
- Darlington BWRX-300 Unit 1 · Construction · design BWRX-300
- Darlington BWRX-300 Units 2-4 · Siting · design BWRX-300
- SRC initial eVinci demonstration proposal (canceled) · Canceled · design eVinci · no map point
- SaskPower Rafferty SMR (Estevan area) · Siting · design BWRX-300
- Romania (2):
- Last Energy PWR-20 demonstrator at RATEN Mioveni (2022 plan) · Announced · design PWR-20
- NuScale VOYGR Doicești (Romania) · Licensing · design NuScale VOYGR (US460 / NPM)
- Sweden (2):
- Kärnfull Next SMR park at Målma, Valdemarsvik · Licensing · design BWRX-300 · no map point
- Studsvik new nuclear at the Nyköping home site · Licensing · design BWRX-300
- Estonia (1):
- Fermi Energia Estonian BWRX-300 plant · Siting · design BWRX-300 · no map point
- Ghana (1):
- Nuclear Power Ghana and Regnum NuScale VOYGR-12 plant (site not disclosed) · Announced · design NuScale VOYGR (US460 / NPM) · no map point
- Ukraine (1):
- Energoatom / Holtec Rivne SMR-160 proposal (MoU-era) · Announced · design Holtec SMR-160
United Kingdom (6 project records into 4 countries)
- Czechia (3):
- Rolls-Royce SMR Dětmarovice candidate location · Siting · design Rolls-Royce SMR
- Rolls-Royce SMR Tušimice candidate location · Siting · design Rolls-Royce SMR
- Temelin Rolls-Royce SMR · Siting · design Rolls-Royce SMR
- Canada (1):
- U-Battery first-of-a-kind siting bid at Chalk River (2019-2023) · Siting · design U-Battery
- Poland (1):
- SGP Industria Rolls-Royce SMR plant (2024 decision in principle) · Suspended · design Rolls-Royce SMR · no map point
- Sweden (1):
Canada (3 project records into 2 countries)
- United States (2):
- ARC-100 first-of-a-kind deployment framework at Idaho National Laboratory · Announced · design ARC-100
- Nuclea Morpheus test reactor siting at the Utah San Rafael Energy Lab · Announced · design Morpheus
- Rwanda (1):
- Dual Fluid critical demonstration experiment in Rwanda · Licensing · design DF-CDE critical demonstration experiment · no map point
Russia (3 project records into 3 countries)
- Kazakhstan (1):
- VBER-300 nuclear plant project near Aktau, Mangystau (2006) · Suspended · design VBER-300 · no map point
- Myanmar (1):
- Myanmar 110 MW SMR project (two RITM-200N; site not named) · Announced · design RITM-200N · no map point
- Uzbekistan (1):
- RITM-200N Jizzakh · Construction · design RITM-200N
Czechia (1 project record into 1 country)
- Ukraine (1):
- TEPLATOR heat-only reactor for Slavutych district heating · Announced · design TEPLATOR · no map point
Denmark (1 project record into 1 country)
- Switzerland (1):
France (1 project record into 1 country)
- Slovakia (1):
- newcleo / JAVYS LFR-AS-200 study at Bohunice V1 · Siting · design LFR-AS-200
Italy (1 project record into 1 country)
- United States (1):
- Terra Innovatum SOLO first deployment at Rock City Admiral Parkway, Valmeyer · Siting · design SOLO · no map point
Japan (1 project record into 1 country)
- United States (1):
- Toshiba 4S proposal at Galena, Alaska (mid-2000s) · Canceled · design 4S · no map point
Sweden (1 project record into 1 country)
- Norway (1):
- SEALER power plant proposal in Longyearbyen, Svalbard · Siting · design SEALER · no map point
By host country
Every country with a published project counted on this page. Rows run from the most projects using designs from elsewhere.
| Country | Projects using designs from elsewhere | Projects using home-country designs |
|---|---|---|
| Poland | United States 9, United Kingdom 1 | 1 |
| United Kingdom | United States 7 | 2 |
| Canada | United States 5, United Kingdom 1 | 4 |
| United States | Canada 2, Italy 1, Japan 1 | 64 |
| Czechia | United Kingdom 3 | 0 |
| Sweden | United States 2, United Kingdom 1 | 3 |
| Romania | United States 2 | 1 |
| Ukraine | United States 1, Czechia 1 | 0 |
| Estonia | United States 1 | 0 |
| Ghana | United States 1 | 0 |
| Kazakhstan | Russia 1 | 0 |
| Myanmar | Russia 1 | 0 |
| Norway | Sweden 1 | 0 |
| Rwanda | Canada 1 | 0 |
| Slovakia | France 1 | 0 |
| Switzerland | Denmark 1 | 0 |
| Uzbekistan | Russia 1 | 0 |
| Argentina | None | 2 |
| China | None | 11 |
| Finland | None | 1 |
| France | None | 6 |
| India | None | 3 |
| Indonesia | None | 1 |
| Japan | None | 1 |
| Netherlands | None | 2 |
| Russia | None | 10 |
| South Africa | None | 2 |
| South Korea | None | 1 |
Home-country designs
Projects whose design comes from a vendor recorded in the project's own country.
- United States: 64 projects
- China: 11 projects
- Russia: 10 projects
- France: 6 projects
- Canada: 4 projects
- India: 3 projects
- Sweden: 3 projects
- Argentina: 2 projects
- Netherlands: 2 projects
- South Africa: 2 projects
- United Kingdom: 2 projects
- Finland: 1 project
- Indonesia: 1 project
- Japan: 1 project
- Poland: 1 project
- Romania: 1 project
- South Korea: 1 project
Not counted
These are gaps in SMRMap's records, not findings about the projects.
- 60 projects have no design recorded in SMRMap, so no origin can be given.
- 1 project uses a design with no recorded vendor country: HTR-PM Shidaowan demonstration.
3D view
A globe with a raised arc from each origin country's approximate center to each mapped project using one of its designs, colored by origin, and a bead at each project colored by its recorded stage. Choose an origin and a pair to see their projects.
No WebGL? The lists above show the same projects.
What this shows and leaves out
- A design's origin is the country recorded for its vendor organization, normally its headquarters. It is not where components are made or who supplies them, and it is not a contract.
- A selected design at proposal stage is a plan, not a purchase.
- Arcs start at an approximate country center, not at a vendor's offices.
- 16 of 46 project records have no map point and appear only in the lists.
- Stage colors are the recorded stage, not proof of current activity.
- Counts are SMRMap's published project records, not reactors, and SMRMap's records are not a complete list of SMR projects (coverage and gaps).