Projects / Indonesia · Announced

West Kalimantan Rosatom land-based SMR proposal (2025)

World Nuclear Association country profile reports a Rosatom land-based SMR alternative (3 x 110 MWe) for West Kalimantan, distinct from the floating RITM-200M offer.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . 3 of 5 listed sources have a publication or document date recorded here; the newest is 3 Jul 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Site location recorded as disclosed (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Primary source (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

Acceptance, selected host, and disposition are not established. In February 2026 Rosatom presented a small reactor of about 100 MWe as one option to the West Kalimantan governor; no acceptance or site. Bloomberg Technoz (3 July 2026) dates the 3 x 110 MW offer to Rosatom's presentation at the 13th Indonesia–Russia Joint Commission in Jakarta on 14 April 2025, where it was the first of two alternative options, with units to be built in 2032, 2033 and 2035. It reports no acceptance or site.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
West Kalimantan Rosatom land-based SMR proposal (host undisclosed) · Indonesia · precision: region only
Rosatom land-based SMR alternative; selected host not verified. Separate from floating and NuScale alternatives.
Coordinates
Region only, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
6 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

West Kalimantan Rosatom land-based SMR proposal (2025) is recorded at West Kalimantan Rosatom land-based SMR proposal (host undisclosed), West Kalimantan, Indonesia. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: region only; region only, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Programs and agreements naming the project
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

The World Nuclear Association's Indonesia profile, updated 20 April 2026, says Rosatom proposed land-based SMRs of 3 x 110 MWe for West Kalimantan in April 2025, and Antara reported on 27 February 2026 that Rosatom offered large or small reactors depending on Indonesia's needs. Neither names a buyer or power purchase agreement for the land-based offer. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

Contractor

The World Nuclear Association's Indonesia profile says Rosatom submitted the land-based SMR proposal for West Kalimantan in April 2025, and Antara reported on 27 February 2026 that Russia's ambassador was awaiting an official response from Indonesia and the province. Rosatom is the proposer, the offer has not been accepted, and neither source names an engineering or construction contractor. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

Funding and government decisions

Antara reported on 27 February 2026 that a Rosatom representative said the company was ready to invest in West Kalimantan by bringing its technology, covering both large and small reactor options, without an amount. That is a general willingness, not a funding commitment for the land-based SMR offer. Older dollar figures in the World Nuclear Association profile concern other Indonesian concepts. Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026); WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals)

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

The World Nuclear Association's Indonesia profile gives 3 x 110 MWe for the land-based offer, and Antara's 27 February 2026 report gives about 100 MW for a small reactor option. Neither names a fuel supplier, quantity or delivery for the West Kalimantan land-based SMRs. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

Comparable schedule revision

Comparable schedule revision not established. The World Nuclear Association's Indonesia profile gives one target, 2032-2035, for Rosatom's land-based SMRs in West Kalimantan, with 2030-2031 for the separate floating offer. Antara's 27 February 2026 report gives no year. One target stated once is not a revision. WNA Nuclear Power in Indonesia (Rosatom West Kalimantan proposals); Antara: Rosatom offers nuclear plant investment to West Kalimantan (27 February 2026)

Not recorded in SMRMap's reviewed evidence (3): Operator or intended licensed owner; Reactor supplier; Site host or owner
Operator or intended licensed owner
Reactor supplier
Site host or owner

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(8 notes, 1 not yet reviewed)

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(3 of 5 sources with a publication or document date)
Latest dated listed source publication: Bloomberg Technoz: RI Bahas Rencana PLTN Terapung dengan Rosatom, Siapkan Aturan (3 July 2026), page 2: 3 Jul 2026.Latest dated recorded event: no date recorded.2 of 5 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(5)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: West Kalimantan Rosatom land-based SMR proposal (2025) — https://smrmap.com/projects/west-kalimantan-land-smr/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “West Kalimantan Rosatom land-based SMR proposal (2025)”. Record reviewed 6 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/west-kalimantan-land-smr/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.