Projects / United States · Announced

ZettaJoule ZJ0 research reactor at Texas A&M (TEES)

ZettaJoule's ZJ0 is an announced research reactor project with Texas A&M's TEES in College Station, in the United States.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.
  • Expected for this stage but not recorded as a structured fact: Design identified (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

TEES and ZettaJoule agreed in February 2026 to explore building the ZJ0 high-temperature gas-cooled research reactor next to the TEES Nuclear Engineering & Science Center in College Station. Distinct from the RELLIS records. Texas A&M describes it as a very-high-temperature modular reactor from an SMR developer; it is not labeled a microreactor.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
TEES Nuclear Engineering & Science Center area, College Station · United States · precision: town or locality only
Town point from the Wikipedia article for College Station; the reactor would be next to the TEES Nuclear Engineering & Science Center in College Station. No parcel point is published, so this is a town-level point.
Coordinates
30.60139, -96.31444 · town-level point (approximate)
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
2 Oct 2026Evidence review 20 Oct 2026. How current names both.
Site and capacity notes

ZettaJoule ZJ0 research reactor at Texas A&M (TEES) is recorded at TEES Nuclear Engineering & Science Center area, College Station, Texas, United States. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: town or locality only; town-level point (approximate).

Coordinate source: Wikipedia: College Station, Texas (article coordinates), Article coordinate 30.60139, -96.31444 on 'College Station, Texas', read 30 October 2026

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
Customer or offtaker

Texas A&M Engineering's 26 February 2026 release lists possible research pathways such as hydrogen, steelmaking and data centers, and classes of possible research funders, but names no buyer or user of heat or power from the ZJ0 research reactor. World Nuclear News of 27 February 2026 names none either. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement

Contractor

Texas A&M Engineering's 26 February 2026 release says the Texas A&M Engineering Experiment Station signed an agreement with ZettaJoule to explore building the ZJ0 research reactor next to its Nuclear Engineering and Science Center, with ZettaJoule to build it and the station to own it. ZettaJoule is the reactor developer, so this is not a separate contractor appointment, and no engineering or construction contractor is named. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M

Funding and government decisions

Texas A&M Engineering's 26 February 2026 release says the project could catalyse up to US$1 billion in research collaborations, industrial partnerships and federal funding over the next decade. That is a potential research-funding outcome, not money raised or committed to build the ZJ0 reactor, and no funder or amount for construction is named. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

World Nuclear News of 27 February 2026 and the Texas A&M release say ZettaJoule's design is based on Japan's HTTR test reactor, which is the design basis. Neither names a fuel manufacturer, enrichment, quantity or delivery for the College Station reactor. WNN: Transformative research reactor mooted for Texas A&M; Texas A&M Engineering Experiment Station and ZettaJoule sign agreement

Comparable schedule revision

Comparable schedule revision not established. The 26 February 2026 Texas A&M release and the 27 February 2026 World Nuclear News report describe the same exploratory agreement and give no construction or operation date for the ZJ0 reactor, only a ten-year horizon for potential research funding. No revision is shown. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M

Not recorded in SMRMap's reviewed evidence (4): Operator or intended licensed owner; Reactor supplier; Site host or owner; Programs and agreements naming the project
Operator or intended licensed owner
Reviewed 20 Oct 2026: not disclosed in the reviewed evidence.
Reactor supplier
Site host or owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(7 notes, 1 not yet reviewed)
  • Evidence review. Texas A&M Engineering's 26 February 2026 release says TEES and ZettaJoule signed an agreement to explore building the ZJ0 high-temperature gas-cooled research reactor adjacent to the TEES Nuclear Engineering and Science Center in College Station, and that the facility would be owned by TEES. World Nuclear News reported the agreement on 27 February 2026. The release says the reactor may provide process heat at temperatures up to 950 degrees Celsius, and the news report describes the company's ZJ reactor as 30 MW thermal and up to 950 degrees. Those figures are not stored. The agreement is an exploration, not a license. The potential research funding is described as up to one billion dollars. The participating organizations retain only their source-supported roles; a reactor operator is not assigned from the study, proposer, parent, existing-fleet or proposed-owner relationship. Last checked 20 Oct 2026. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M
    What would change this

    A filing that commits an output and a plot for the ZJ0 reactor at the TEES center. Next scheduled check: 20 Jan 2027.

  • Design identified: Not disclosed in the reviewed evidence. Both pages name the ZJ0 reactor. The 30 MW thermal figure is the news report's description of the company's ZJ reactor, and the temperature is stated as up to 950 degrees. Neither is stored, and the empty design field stays empty. Last checked 20 Oct 2026. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M
    What would change this

    A project document that commits one ZJ0 output. Next scheduled check: 20 Jan 2027.

  • Site location recorded as disclosed. Both pages place the reactor adjacent to the TEES Nuclear Engineering and Science Center in College Station. They give no coordinates. The map shows a town-level point for College Station. Last checked 20 Oct 2026. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M
    What would change this

    A surveyed plot for the ZJ0 facility. Next scheduled check: 20 Jan 2027.

  • Operator or intended licensed owner: Not disclosed in the reviewed evidence. The reviewed sources establish other participant roles, but do not appoint the recorded party as this reactor’s operator. The operator remains unassigned; this does not assert that no operator exists. Last checked 20 Oct 2026. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement; WNN: Transformative research reactor mooted for Texas A&M
    What would change this

    A project-specific filing, operating agreement or developer statement explicitly names the proposed reactor operator. Next scheduled check: 20 Jan 2027.

  • Next decision and prerequisites: Not disclosed in the reviewed evidence. The February 2026 release and World Nuclear News's report describe an agreement to explore building the ZJ0 reactor and its research potential, but give no schedule, decision point or licensing step. The next decision for the project is therefore not disclosed in these sources. Last checked 23 Oct 2026. WNN: Transformative research reactor mooted for Texas A&M
    What would change this

    A TEES or ZettaJoule announcement of a decision to proceed, a schedule or an NRC filing. Next scheduled check: 23 Apr 2027.

  • Permissions and public process: Not disclosed in the reviewed evidence. Texas A&M Engineering's 26 February 2026 release says the Texas A&M Engineering Experiment Station signed an agreement with ZettaJoule to explore building the ZJ0 research reactor in College Station. It names no NRC construction permit application, pre-application review or public meeting for the reactor, so no permission is established in this source. Last checked 23 Oct 2026. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement
    What would change this

    An NRC pre-application or construction permit filing for the ZJ0 reactor at TEES. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). The February 2026 release says ZettaJoule would build the ZJ0 reactor next to the TEES Nuclear Engineering & Science Center in College Station, where TEES already has two research reactors, and that TEES would own the new facility. The agreement is to explore the project; no plot, lease, grid or water arrangement is described. Last checked 23 Oct 2026. Texas A&M Engineering Experiment Station and ZettaJoule sign agreement
    What would change this

    A TEES site plan or NRC filing locating the ZJ0 facility. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: ZettaJoule ZJ0 research reactor at Texas A&M (TEES) — https://smrmap.com/projects/zettajoule-tees-zj0/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “ZettaJoule ZJ0 research reactor at Texas A&M (TEES)”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/zettajoule-tees-zj0/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.