Chinergy / CNNC Energy Technology
CNNC affiliate associated with high-temperature gas-cooled reactor commercialisation; named owner on Maoming Green Energy geological survey.
- Projects
- Siting: CNEC / Zheneng Sanmen HTGR power station.
- Evidence
- 4 sources; first primary source: Guangdong Foshan Geological Bureau: Maoming Green Energy site geological survey acceptance. Record reviewed 2 Oct 2026.
Key facts · Designs · Tracked projects · Agreements · Ownership · Milestones · Sources · Its projects in the table · Who is involved
Key facts
- Organization type
- Vendor, Reactor developer
- Category
- vendor
- Country
- China
- Listing status
- State-controlled (not independently listed) · source 中核苏阀科技实业股份有限公司 2025年度日常关联交易预计公告 (公告编号 2025-011) · listing checked 6 Nov 2026
- Ownership / control
- State-controlled
A Jan 2025 related-party filing by Shenzhen-listed CNNC Suzhou Valve (000777) states 中核能源科技有限公司 is directly controlled by China National Nuclear Corporation, which CNNC calls a centrally managed state-owned enterprise. - Confidence
- medium
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current activity)
All fields
(3 without a known value)
- Aliases
- None recorded in this release
- Exchange / ticker
- None recorded in this release
- Website
- None recorded in this release
Linked designs
- No designs tracked here.
Tracked deployment projects
2 linked project records: 1 siting, 1 operating, counting every project that names this organization in any recorded role (vendor, operator or participant). These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.
- HTR-PM Shidaowan demonstration — Operating · China
Recorded link: construction contractor · project record checked 19 Oct 2026 · timeline · 1 recorded project action · sources - CNEC / Zheneng Sanmen HTGR power station — Siting · China
Recorded link: vendor/developer field · project record checked 2 Oct 2026 · timeline · permission status · sources
Agreements (1)
Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.
- China's HTGR Modern Industrial Chain Alliance led by CNNC's Chinergy (2025) — Research program · Active · announced 11 Dec 2025
Recorded role: Developer or vendor
Ownership & relationships
- China National Nuclear Corporation (中国核工业集团有限公司): Subsidiary of · as of 6 Nov 2026. Recorded in the 2026-11-06 listing check.
Milestones
- No organization-level milestones recorded. See the linked project timelines for dated developments and targets.
Organization-level unresolved information
- None noted for this organization; linked projects may still have open evidence.
Sources
(4)
- Guangdong Foshan Geological Bureau: Maoming Green Energy site geological survey acceptance (government, accessed 2 Oct 2026)
- CNNC EN: Chinergy commercialising modular HTR technology (company, accessed 2 Oct 2026)
- 中核苏阀科技实业股份有限公司 2025年度日常关联交易预计公告 (公告编号 2025-011) (company, published 14 Jan 2025, accessed 6 Nov 2026)
- Profile (company, accessed 6 Nov 2026)