Companies

First American Nuclear

Developer of the EAGL-1 lead-bismuth-cooled fast SMR. The NRC lists pre-application activities with the company from December 2025, associated with a future construction-permit application; its regulatory engagement plan is marked "No review requested". Pre-application engagement is not an application under review or a permit, and it names no plant site. Separately, FANCO's 17 August 2026 release describes plans for a HALEU deconversion and fuel-fabrication facility, anticipating a Part 70 license application in the fourth quarter of 2027. That is a company-reported fuel-facility plan, distinct from reactor licensing; the cited NRC accessions were not opened in this review.

Projects
Announced: First American Nuclear EAGL-1 energy park in Indiana (site not disclosed). 1 design.
Evidence
10 sources; first primary source: First American Nuclear: EAGL-1. Record reviewed 11 Oct 2026.

Key facts

Organization type
Reactor developer, Vendor
Category
vendor
Country
United States
Website
https://fanuclear.com/
Confidence
medium
Record reviewed
11 Oct 2026 (record review date, not proof of current activity)

All fields

(4 without a known value)
Aliases
None recorded in this release
Listing status
Unknown (no listing is recorded here; this does not mean the organization is private)
Exchange / ticker
None recorded in this release
Ownership / control
Unknown (no owner or controller is recorded here)

Linked designs

  • EAGL-1 — Lead-cooled fast reactor (LFR) · SMR

Tracked deployment projects

1 linked project record: 1 announced, counting every project that names this organization in any recorded role (vendor, operator or participant); the developer table counts only projects that use its designs. These include proposals and historical canceled or suspended plans; the count is not reactors built. Stages are the last recorded classifications, not proof of current activity. A recorded operator/host field does not by itself establish who will operate a reactor. A project without a recorded regulatory action is not necessarily without permission.

Agreements (3)

Agreements, plans, studies and government programs that name this organization as a participant. They are not deployment projects and are not counted above.

Ownership & relationships

Milestones

(8)
  • 10 Feb 2026 — Dated its regulatory engagement plan for the EAGL-1 design (NRC ADAMS ML26048A512). The plan says FANCO initially intends a construction-permit application for a first-of-a-kind or prototype plant and names no site.
  • 15 Apr 2026 — Announced submission of that plan to the NRC, opening pre-application engagement. It says FANCO is working with the State of Indiana on manufacturing, siting and workforce development; no site is named and no application is under review.
  • 13 May 2026 — AtkinsRéalis announced a 20-year EAGL-1 engineering-services alliance and initial design-related task orders. The framework is not a reactor order or an awarded plant construction contract.
  • 13 Jul 2026 — Signed an early EAGL-1 cooperation framework with Hyundai E&C, according to Hyundai's 14 July release. A future EPC role remains exploratory; no selected plant site or reactor order is stated.
  • 27 Jul 2026 — Announced two NSUF Rapid Turnaround Experiment selections for materials research with national laboratory capabilities. These are company-reported research selections, not completed experiments or a stated cash grant.
  • 17 Aug 2026 — Announced a regulatory engagement plan for a proposed HALEU deconversion and fuel-fabrication facility, separate from the EAGL-1 reactor. Anticipated Part 70 application timing is a company plan; no license or application acceptance is established here.
  • 27 Oct 2026 — Announced submitting a technical justification to the NRC on installing certain conventional-island equipment before a reactor construction permit. The NRC document was not opened; no NRC acceptance or site is stated.
  • 30 Oct 2026 — Signed a five-year master service agreement with Hyundai E&C for EAGL-1, according to Hyundai's 2 November release. Scope and value are set by later task orders; it is not an EPC award or a reactor order.

Organization-level unresolved information