Designs

EAGL-1

Lead-bismuth-cooled fast SMR of 240 MWe and 600 MWt per unit. Its developer is in NRC pre-application engagement under a regulatory engagement plan that the NRC lists as "No review requested"; that is not a design approval or an application under review.

Reactor type
Lead-cooled fast reactor. How it works, with a 3D view.
Projects
Announced: First American Nuclear EAGL-1 energy park in Indiana (site not disclosed).
Evidence
3 sources; first primary source: First American Nuclear: EAGL-1. Record reviewed 11 Oct 2026.

Key facts

Class
SMR
Technology
Lead-cooled fast reactor (LFR)
Coolant
Lead bismuth
Spectrum
Fast
Developer / vendor(s)
First American Nuclear
Module electrical
240 MWe (gross/net unspecified)
Module thermal
600 MWth (nameplate; basis unspecified)
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
11 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (3)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(3)

Evidence and open questions

(1 note)
  • Evidence review. First American Nuclear Co. (FANCO) describes EAGL-1 as a 240 MWe liquid-metal, fast-spectrum small modular reactor for utility-scale electricity, cooled by lead-bismuth eutectic and fueled with HALEU UO2. Its reactor page gives 240 MWe electric output and 600 MWt thermal output per unit, with the electrical basis (gross or net) not stated, and says customers can start with one unit or deploy several. The NRC page (last updated 15 September 2026) lists pre-application activities since December 2025 associated with a future construction permit application, with the Regulatory Engagement Plan (ML26048A512) marked 'No review requested'; this is pre-application engagement, not an application under review or a design approval. None of the opened pages names Indiana or any site, so the linked Indiana energy-park deployment is not connected by these sources. The stored FANCO vendor, LFR family, lead-bismuth coolant, fast spectrum and 240 MWe / 600 MWt nameplate_unspecified ratings match the sources. Last checked 19 Oct 2026. First American Nuclear: EAGL-1 reactor; First American Nuclear: EAGL-1; NRC: First American Nuclear pre-application activities
    What would change this

    NRC docketing of a FANCO construction permit application or topical report, or a FANCO announcement naming the Indiana site. Next scheduled check: 19 Jan 2027.