Westinghouse describes the AP300 as a pressurized-water SMR with a 300 MWe electrical rating and a 900 MWth thermal rating per module. These are vendor design ratings, not output achieved at a project or approval for a site. The NRC's AP300 page describes pre-application engagement for a future design-certification application, under docket 99902111, and lists a regulatory-engagement update dated 11 June 2026. Pre-application work is not design certification, an accepted project application or permission to build at a site.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Projects
Announced: Community Nuclear Power North Teesside AP300 proposal. Development status as stated: Basic design.
Evidence
5 sources; first primary source: Westinghouse / Community Nuclear Power Teesside proposal. Record reviewed 8 Oct 2026.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Key facts

Class
SMR
Technology
Pressurized water reactor (PWR)
The 2024 SMR Technology Catalogue describes a one-loop pressurized water reactor, so no integral layout is recorded.
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s)
Westinghouse Electric Company
Module electrical
300 MWe (gross/net unspecified)
Module thermal
900 MWth (nameplate; basis unspecified)
Fuel form
UO2 fuel / 17x17 square lattice
Development status (as stated)
Basic design
Reactor vessel
11 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 17.330 MWe class versus rated output stays unresolved and is not this cellSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
10 m bar; a person 1.8 m tall
AP300 *
11 m tall, 4 m across
All vessels to scale
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
high
Record reviewed
8 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (3)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(5)

Evidence and open questions

(2 notes)
  • Evidence review. Westinghouse's AP300 technology page describes the AP300 SMR as 300 MWe (900 MWth), based on the licensed AP1000 pressurized light-water technology, for grid electricity plus district heating, desalination and hydrogen. The NRC pre-application page (last reviewed 15 September 2026) describes pre-application activities with Westinghouse since May 2023 toward a future design certification application under docket 99902111, calls the AP300 a 300 MWe class, Generation III+, one-loop PWR, and lists a regulatory engagement plan update submitted 11 June 2026; this is pre-application, not certification. The 2024 edition of the IAEA SMR Technology Catalogue (printed June 2025) instead describes the AP300 as a 330 MWe class design with 990 MWth core thermal power, a one-loop light-water PWR at basic design status. Westinghouse's 8 February 2024 release says Community Nuclear Power agreed to build four AP300 SMRs in North Teesside, with a licensed site targeted for 2027 and commercial operation expected by the early 2030s, which supports the linked Teesside deployment. Stored vendor and light-water coolant stay supported, and the sources say one-loop PWR, not integral; the stored 300 MWe and 900 MWth match the developer page and the NRC class, but the 2024 catalog's 330 MWe class and 990 MWth differ and no source states a gross or net basis. Last checked 19 Oct 2026. Westinghouse AP300 SMR technology page; NRC: Westinghouse AP300 pre-application activities; Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); Westinghouse / Community Nuclear Power Teesside proposal; IAEA ARIS design record: AP300
    What would change this

    Westinghouse's AP300 design certification application to the NRC (or a UK GDA entry), which would fix the certified rating (300 versus 330 MWe class, 900 versus 990 MWth) and its basis. Next scheduled check: 19 Jan 2027.

  • Technology family. The 2024 SMR Technology Catalogue describes a one-loop pressurized water reactor, so no integral layout is recorded. Last checked 1 Nov 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
    What would change this

    A developer, regulator or IAEA document that states this design's primary-circuit layout. Next scheduled check: 1 Feb 2027.