Projects / United Kingdom · Announced

Community Nuclear Power North Teesside AP300 proposal

Westinghouse and Community Nuclear Power announced an agreement in February 2024 toward four AP300 units in North Teesside.

Current status

Stage
Announced
How current
General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

Newest recorded development . Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
Announced 8 Feb 2024 · Announcement: Community Nuclear Power North Teesside AP300 proposal documented. Private proposal for four AP300 units in North Teesside. Source: Westinghouse / Community Nuclear Power Teesside proposal. Updates entry
More on this development

A 2027 site-license date and operation in the 2030s are targets, not completed authorizations.

Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
  • Expected for this stage but not recorded as a structured fact: Site location recorded as disclosed (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Pressurized water reactor. How it works, with a 3D view.
Schematic of Rolls-Royce SMR, this type's example. On the left, a reactor vessel holds a core of fuel assemblies, with control rod drives above its head.
Schematic of Rolls-Royce SMR, this type's example.

Description

Westinghouse named Jacobs and Interpath Advisory as CNP's strategic partners for developing a licensed site and described the project as privately funded, without stating an amount. The 2027 site-license target and commercial operation expected by the early 2030s are targets, not completed authorizations. The release does not establish an EPC award or a notice to proceed.

Key facts

Design
AP300 (SMR)
Technology
Pressurized water reactor (PWR) · light water. The 2024 SMR Technology Catalogue describes a one-loop pressurized water reactor, so no integral layout is recorded.
Reactor vessel of this design
11 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 17.330 MWe class versus rated output stays unresolved and is not this cellSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Operator(s)
Not recorded
Vendor for linked design
Westinghouse Electric Company
Design origin
United States: where the design's vendor is recorded, not where parts are made · See designs from this origin on a 3D globe
Location
North Teesside · United Kingdom · precision: region only
Searchable without an invented map pin.
Coordinates
Region only, no map pin
Electrical capacity
Not recorded · scope: plant
Derived plant output (not source-stated)
≈ 1,200 MWe derived (4 planned modules × 300 MWe per module, rating basis unspecified); not a source-stated plant rating
Thermal capacity
Not recorded
Modules planned
4
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
1 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Community Nuclear Power North Teesside AP300 proposal is recorded at North Teesside, England, United Kingdom. Operator: No operator is recorded. Recorded vendor: Westinghouse Electric Company. Stage: Announced. Location precision: region only; region only, no map pin.

Electrical output is not recorded on this project. Modules planned: 4. Thermal output is not recorded on this project. The linked design record states 900 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Contractor

Source-backed project statement Westinghouse's 8 February 2024 release says Community Nuclear Power signed an agreement with Westinghouse aimed at four AP300 units in North Teesside and is working with strategic partners, including Jacobs and Interpath Advisory, to develop a fully licensed site targeted for 2027. These are preparatory site-development partners. The release does not describe an engineering, procurement and construction award or a notice to proceed. Westinghouse / Community Nuclear Power Teesside proposal

Funding and government decisions

Source-backed project statement Westinghouse described the North Teesside project as privately funded. Its release does not state a financing amount, named investor or disbursement. Westinghouse / Community Nuclear Power Teesside proposal

Fuel
  • Fuel form stated for AP300UO2 fuel / 17x17 square lattice
No project-specific fuel supply arrangement is recorded as a structured fact.

Westinghouse's 8 February 2024 release says the AP300 uses AP1000 engineering, components and supply chain. That is design heritage, not fuel supply. The release names no fuel supplier, allocation or delivery for the four North Teesside units. Westinghouse / Community Nuclear Power Teesside proposal

Not found in the sources we checked (2): Customer or offtaker; Comparable schedule revision
Customer or offtaker

Westinghouse's 8 February 2024 release says the AP300 suits grid generation, industrial sites, hydrogen, e-fuels, desalination and district heating, and that the North Teesside region has growing electricity demand. It names no buyer, quantity or offtake agreement for the four North Teesside units. Westinghouse / Community Nuclear Power Teesside proposal

Comparable schedule revision

Comparable schedule revision not established. Westinghouse's 8 February 2024 release gives a 2027 target for a fully licensed North Teesside site and commercial operation expected by the early 2030s. These targets are stated once in the source read, so they show no revision of either milestone. Westinghouse / Community Nuclear Power Teesside proposal

Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Site host or owner
Programs and agreements naming the project

Timeline

Recorded developments

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(5 notes, 1 not yet reviewed)
  • Evidence review. The Westinghouse release says an agreement with Community Nuclear Power is to build four AP300 SMRs in the North Teesside region of Northeast England, describes the fleet as privately financed, and says commercial operation is expected by the early 2030s. It also says CNP is working with Jacobs and Interpath Advisory toward a fully licensed site, with a target of 2027, and that the project is being privately funded. North Teesside is a region, not a named plot, so the stored location is region only. No fuel supplier, offtaker or licensed operator is named. The 2027 and early-2030s dates are targets. The stored AP300 design, four modules, Westinghouse as vendor and announced stage stay. Last checked 19 Oct 2026. Westinghouse / Community Nuclear Power Teesside proposal
    What would change this

    A site-license application naming a plot in North Teesside, or a published site selection, would change this record. Next scheduled check: 19 Jan 2027.

  • Site location recorded as disclosed: Not disclosed in the reviewed evidence. The release names the North Teesside region and a target to develop a fully licensed site. It does not name the plot. A region is not recorded as a named site. Last checked 19 Oct 2026. Westinghouse / Community Nuclear Power Teesside proposal
    What would change this

    The site-license application targeted for 2027, if it names a plot, would settle the site. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. The next step named in Westinghouse's February 2024 release is securing a fully licensed site for the North Teesside AP300 project, targeted for 2027, ahead of commercial operation expected by the early 2030s. Both dates are targets, and no licensing filing is shown in the sources reviewed. Last checked 23 Oct 2026. Westinghouse / Community Nuclear Power Teesside proposal
    What would change this

    An ONR site license application or decision for the Teesside project, or a CNP statement revising the 2027 target. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. Westinghouse's February 2024 release says Community Nuclear Power is working with Jacobs and Interpath Advisory to develop a fully licensed site for the North Teesside AP300 project, targeting 2027. A target is not an application; no ONR site license application, planning application or consultation for the project is shown in the sources reviewed. Last checked 23 Oct 2026. Westinghouse / Community Nuclear Power Teesside proposal
    What would change this

    An ONR nuclear site license application, development consent application or public consultation for the Teesside AP300 project. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). The February 2024 Westinghouse release places the four AP300 units only in the North Teesside region and says a fully licensed site is being developed. It names no plot, land arrangement, grid connection or cooling-water source. Last checked 23 Oct 2026. Westinghouse / Community Nuclear Power Teesside proposal
    What would change this

    A CNP announcement naming the Teesside site, or planning documents describing its grid and water arrangements. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 1 source with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: Community Nuclear Power North Teesside AP300 proposal documented: 8 Feb 2024.1 of 1 listed source has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(1)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Community Nuclear Power North Teesside AP300 proposal — https://smrmap.com/projects/ap300-teesside/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Community Nuclear Power North Teesside AP300 proposal”. Record reviewed 1 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/ap300-teesside/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.