MARVEL

DOE's current MARVEL project page describes an 85 kWth sodium-potassium-cooled microreactor capable of about 10 kWe. These are intended research-test-bed outputs, not achieved generation or commercial availability. These are the outputs on DOE's project page checked 8 October 2026; the ARIS report is a dated design identity, not regulatory permission. INL's release of 11 March 2026 instead describes MARVEL as producing 85-100 kWth and approximately 20 kW of electricity; SMRMap stores DOE's single values, discloses INL's figures here and has not reconciled the two descriptions.

Reactor type
No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
Projects
Construction: MARVEL microreactor test bed at INL's TREAT facility.
Evidence
3 sources; first primary source: ARIS original status report — MARVEL (2024-10-17). Record reviewed 8 Oct 2026.

Catalog identity snapshot: 17 Oct 2024 (ARIS report publication). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.

Key facts

Class
Microreactor
Technology
Other (see description)
Coolant
Sodium-potassium
Spectrum
Thermal
Developer / vendor(s) as of 17 Oct 2024
Idaho National Laboratory
Module electrical
approximately 10 kWe (gross/net unspecified)
Module thermal
85 kWth (nameplate; basis unspecified)
Fuel form
Uranium zirconium hydride fuel, a version of TRIGA fuel
Reactor vessel
2.55 m tall, 1.22 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 469.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
8 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Design sources

(3)

Evidence and open questions

(1 note)
  • Evidence review. DOE's MARVEL Microreactor Project page (captured 19 October 2026) describes MARVEL as a sodium-potassium-cooled microreactor being developed by DOE that will generate 85 kilowatts thermal and approximately 10 kilowatts electric at the Transient Reactor Test Facility at Idaho National Laboratory, using uranium zirconium hydride (TRIGA-type) fuel with natural-circulation cooling. It presents MARVEL as a nuclear test bed for microreactor operations and end-use applications, not a commercial product. DOE gives anticipated dates of assembly complete in 2026, installation in TREAT from late 2026, dry initial criticality in 2027 and full power in 2028, with operation expected from 2028 to 2030; these are targets, and the page states no safety-basis approval. The ARIS report (published 18 October 2024) identifies MARVEL as an INL test microreactor funded by DOE and classifies its spectrum as thermal at detailed-design status. Both sources tie the design to the linked MARVEL test bed at INL's TREAT facility. Stored vendor, sodium-potassium coolant, thermal spectrum, fuel form, 85 kWth and 10 kWe stay supported by the DOE page; the INL release of 11 March 2026 that the summary cites for 85-100 kWth and about 20 kW could not be read when checked. Last checked 19 Oct 2026. DOE Office of Nuclear Energy: MARVEL microreactor project page; ARIS original status report — MARVEL (2024-10-17)
    What would change this

    DOE's approval of MARVEL's documented safety analysis for operation, or a DOE/INL report of dry initial criticality (anticipated 2027), and a readable INL statement reconciling 85 versus 85-100 kWth and 10 versus about 20 kWe. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Environmental decision

  • DOE finding of no significant impact for MARVEL (DOE/EA-2146) — MARVEL microreactor test bed at INL's TREAT facility
    Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 12 Nov 2021
    Issued at Idaho Falls on 12 November 2021 for environmental assessment DOE/EA-2146. DOE found that designing and demonstrating MARVEL in the north high bay of the Transient Reactor Test facility would not significantly affect the human environment, so no environmental impact statement is required. It is an environmental finding. It is not approval of a safety analysis and not authority to load fuel or operate. The 2021 text describes about 20 kW electric; DOE's current project page gives 85 kW thermal and about 10 kW electric.
    Sources: DOE/EA-2146 Finding of No Significant Impact: MARVEL microreactor