MARVEL microreactor test bed at INL's TREAT facility

DOE test reactor: an 85 kWt test-bed microreactor, not a commercial plant. DOE plans installation in INL's TREAT facility, with dry criticality expected in 2027 and full power in 2028; its preliminary safety analysis was approved in 2026.

Stage
Construction
Design
MARVEL (Microreactor)
Technology
Other · unknown
Operator(s)
Idaho National Laboratory
Vendor(s)
Idaho National Laboratory
Location
TREAT facility, Idaho National Laboratory · United States · precision: undisclosed
Searchable without an invented map pin.
Coordinates
undisclosed / not plotted
Electrical capacity
— · scope: plant
Thermal capacity
0.085 MWth (nameplate_unspecified)
Modules planned
1
Inclusion basis
microreactor_labeled
Confidence
medium
Last verified
2026-10-02 (publication/verification date)