BREST-OD-300
Lead-cooled fast demonstration reactor at Seversk, 700 MWth. Two IAEA outputs disagree on its electrical rating: live PRIS lists 300 MWe gross and 281 MWe net, while the printed 2026 reactor tables list 306 MWe gross and 300 MWe net. The 300 MWe recorded here follows live PRIS as gross; the conflict is preserved. The NIKIET section of the 2024 IAEA SMR catalog describes the fuel as mixed uranium-plutonium mononitride, (U-Pu)N, with enrichment up to 14.5 percent. That is a design description, not a statement that fuel has been loaded.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- Construction: BREST-OD-300 Seversk.
- Evidence
- 5 sources; first primary source: IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026. Record reviewed 15 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s)
- NIKIET
- Module electrical
- 300 MWe (gross)
- Module thermal
- 700 MWth (nameplate; basis unspecified)
- Fuel form
- mixed uranium-plutonium mononitride (U-Pu)N
- Enrichment
- up to 14.5%
- Reactor vessel
- 17.5 m tall, 26 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 277.the section calls the vessel metal-concrete; that names this body and does not add a numeric qualifier The section describes a metal-concrete reactor vessel, not a conventional steel cylinder.SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallBREST-OD-300 *
17.5 m tall, 26 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 15 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- BREST-OD-300 Seversk — Construction · Russia
Design sources
(5)
- World Nuclear Association — Small Nuclear Power Reactors (directory or tracker, accessed 1 Oct 2026)
- EnergyNote 2026 SMR licensing map (news report, accessed 1 Oct 2026)
- IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026 (IAEA/NEA, accessed 18 Oct 2026)
- IAEA: Nuclear Power Reactors in the World, Reference Data Series No. 2, 2026 edition (IAEA-RDS-2/46, September 2026) (IAEA/NEA, accessed 9 Oct 2026)
- IAEA SMR catalogue 2024: BREST-OD-300 section provided by NIKIET (IAEA/NEA, published Jun 2025, accessed 15 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The NIKIET section of the 2024 IAEA SMR catalog (third edition, June 2025) describes BREST-OD-300 as a lead-cooled fast reactor developed by NIKIET as a pilot demonstration prototype for future commercial reactors with a closed fuel cycle, fueled with uranium-plutonium mononitride and generating 300 MW(e) through a subcritical steam turbine. The same section says Rostekhnadzor issued the construction license in February 2021 after a detailed design review, first concrete was poured on 8 June 2021, and equipment fabrication, installation and construction were planned to be completed in 2026. Live IAEA PRIS data captured on 19 October 2026 list BREST-OD-300 at Seversk as an under-construction fast reactor of 700 MWt, 300 MWe gross and 281 MWe net, which ties the design to the linked Seversk project. The stored LFR family, lead coolant, fast spectrum, 700 MWth, 300 MWe gross, (U-Pu)N fuel and 'up to 14.5%' enrichment text stay supported by the catalog and PRIS. The printed RDS-2/46 tables are attached but their text is columnized, so the stored 306/300 MWe pairing could not be quoted from them here; the WNA and EnergyNote captures do not mention BREST. The catalog names NIKIET, not Rosatom, as technology developer. Last checked 19 Oct 2026. IAEA SMR catalogue 2024: BREST-OD-300 section provided by NIKIET; IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026
What would change this
A Rosatom/NIKIET or Rostekhnadzor announcement of the operating license or first criticality at Seversk, or a PRIS update changing status or capacity. Next scheduled check: 19 Jan 2027.