LFR-AS-30
Lead-cooled fast-reactor demonstration for materials testing. This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Lead-cooled fast reactor. How it works, with a 3D view.
- Projects
- Siting: newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-Véron.
- Evidence
- One source (IAEA/NEA): NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- SMR
- Technology
- Lead-cooled fast reactor (LFR)
- Coolant
- Lead
- Spectrum
- Fast
- Developer / vendor(s) as of 14 Feb 2025
- newcleo
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- newcleo LFR-AS-30 at Beaumont-en-Véron / Savigny-en-Véron — Siting · France
Design sources
(1)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 190
Evidence and open questions
(2 notes)
- Evidence review. The only attached source is the NEA SMR Dashboard third edition (2025), used here for identity statements only. It lists the LFR-AS-30 under newcleo and describes it as a fast-spectrum, lead-cooled reactor using mixed plutonium-uranium oxide (MOX) fuel. Its stated role is a demonstration that will enable materials testing for the LFR-AS-200. The dashboard says newcleo has begun discussions with French authorities to acquire land within the Chinon Vienne et Loire community of municipalities, the opened link to the linked Beaumont-en-Véron / Savigny-en-Véron project. No reusable attached source gives the output, and the dashboard's licensing narrative is not reused here, so no dated status is taken from it. The stored newcleo vendor, LFR family, lead coolant and fast spectrum stay as identity facts. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
newcleo's own LFR-AS-30 specification or the CNDP public-debate dossier (already captured for the Véron project), or an ASNR decision on an LFR-AS-30 creation-authorization application. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The only attached source is the NEA dashboard, whose figures are not reused; no reusable published source attached to this record states the LFR-AS-30 output. The closest identity passage is quoted. The rating would not be stored on this identity profile in any case. Last checked 19 Oct 2026. NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
Attaching CNDP public debate brochure: newcleo LFR-AS-30 (already used for the newcleo Véron project) or a newcleo LFR-AS-30 technical page would let the output be recorded as supported. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- newcleo LFR-AS-30 safety-options request — applies to the design, not to a site
Design assessment sought · Application received · ASNR · submitted 19 Dec 2025
ASNR states that newcleo filed a safety-options request on 19 December 2025 for LFR-AS-30. The page does not record an opinion or a creation authorization.
Sources: ASNR, PRM projects and their fuel-fabrication plants