Huakun One floating reactor platform
CGN floating platform carrying one compact pressurised-water reactor of 200 MWt and about 50 MWe with two turbine-generators, as described in the November 2025 siting-stage environmental assessment accepted by China's ecology ministry; the National Energy Administration's July 2026 report cites the same figures. The assessment gives no other design name and does not state a relationship to the ACPR50S program. The electrical figure is approximate (about 50 MWe). This is a dated description, not confirmation of current availability or authorization.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Evidence
- 2 sources; first primary source: MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project. Record reviewed 6 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
- Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- China General Nuclear Power Group
- Module electrical
- 50 MWe (gross/net unspecified)
- Module thermal
- 200 MWth (nameplate; basis unspecified)
- Record reviewed
- 6 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
Design sources
(2)
- MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project (government, accessed 6 Oct 2026)
- National Energy Administration: China Nuclear Power Development Report 2026 (July 2026) (government, accessed 6 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The November 2025 siting-stage environmental impact report by CGN Ocean Energy for the Huakun One (华鲲一号) science and technology demonstration project, published on the Ministry of Ecology and Environment's site, describes a floating reactor platform plus the Taipingling operation and maintenance base, built on the Taipingling nuclear plant site in Huidong, Guangdong. It says the floating reactor is a small reactor independently developed by China General Nuclear using compact pressurised-water reactor technology, in a one-reactor, two-turbine configuration with reactor power 200 MWt and generating power of about 50 MWe, and that the platform will be moored in the base's harbour basin to generate electricity. The 200 MWt and about 50 MWe are for the single reactor on the platform, with the electrical basis unstated. The report is a siting-stage environmental assessment, not a construction or operating license; the National Energy Administration's July 2026 report says research on an offshore floating reactor of 200 MW thermal and about 50 MW electrical is advancing, without naming Huakun One. The report connects the linked Taipingling demonstration deployment. The stored CGN vendor, light-water coolant and 200 MWt / about 50 MWe ratings, with no stated basis, match; the report's compact PWR wording does not state the stored thermal spectrum. Last checked 19 Oct 2026. MEE: siting-stage environmental impact report (November 2025), Huakun One science and technology demonstration project; National Energy Administration: China Nuclear Power Development Report 2026 (July 2026)
What would change this
The ministry's approval of the Huakun One siting-stage report, or an NNSA construction license for the floating platform. Next recheck due .
Regulatory actions
Compare reviews and approvals across designs
Site applications and decisions
- NNSA site-selection review opinion No. 2620, Huakun One science and technology demonstration project — Huakun One floating reactor platform demonstration at the Taipingling site
Site permission · Issued / approved · NNSA · decided 2 Nov 2026 · permit 国核安证字第2620号
The National Nuclear Safety Administration issued its site-selection review opinion (国核安证字第2620号) on 2 November 2026 to CGN Ocean Energy for the Huakun One floating reactor platform and maintenance base at the Taipingling nuclear base in Huidong county. The review found no disqualifying site factor affecting safety that engineering measures could not resolve, and the opinion agrees that design work may proceed on the stated site parameters. It is not a construction license: before holding one the company may not pour seismic Category I foundation concrete or build other safety-important structures.
Sources: NNSA: site-selection review opinion No. 2620 for the Huakun One science and technology demonstration project (2 November 2026)
Cite or share this page
SMRMap. “Huakun One floating reactor platform”. Record reviewed 6 Oct 2026. https://smrmap.com/designs/dsn-huakun-one/ (accessed [date]).
“Record reviewed” is the record review date; the evidence review, individual sources and later additions keep their own dates. Add the date you read the page; save a PDF if you need a copy of it.
Record details
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence (as stored in the record)
- medium
Data fingerprint 0153352d9753fff813ac32edec0a3ffbf1d8b7c7ee6420defec355f03d9ef915; build 2026-11-24. It identifies the underlying data collections, not an archived page or a download checksum. The build date is not a source review date.