Designs

Jimmy Fermi heat microreactor

ASNR identifies the Bazancourt Fermi reactor as a 20 MWth high-temperature reactor. Jimmy's separate 10 MW figure is proposed heat supplied to the Cristanol customer, not the reactor's thermal rating. The creation-authorization application remains under review; it is not authorization to build or operate. Le Creusot is the fuel-assembly facility, not this deployment site.

Reactor type
High-temperature gas-cooled reactor. How it works, with a 3D view.
Projects
Licensing: Jimmy Cristanol Bazancourt heat microreactor proposal. Development status as stated: Detailed design.
Evidence
4 sources; first primary source: Jimmy deployment announcement. Record reviewed 9 Oct 2026.
Schematic of HTR-PM, this type's example. On the left, a tall reactor vessel holds a bed of fuel spheres inside a graphite reflector, with fuel tubes above and below.
Schematic of HTR-PM, this type's example.

Key facts

Class
Microreactor
Technology
High-temperature gas-cooled reactor (HTGR)
Coolant
Helium
Spectrum
Thermal
Developer / vendor(s)
Jimmy
Module electrical
thermal only (no MWe)
Module thermal
20 MWth (nameplate; basis unspecified)
Fuel form
UCO TRISO particles packed into pellets
Development status (as stated)
Detailed design
Reactor vessel
5 m tall, 5 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 241.the reactor-vessel subsection says the reactor vessel is 5x5m the pressure-tube sentence gives no size footprint 6000 is not this cellSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale
Inclusion basis
Labeled microreactor
Confidence
medium
Record reviewed
9 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Design sources

(4)

Evidence and open questions

(1 note)
  • Evidence review. Jimmy Energy's section of the 2024 IAEA SMR catalog (third edition, June 2025) describes Jimmy as a high-temperature gas-cooled reactor of 10 to 20 MW(t) for low-carbon industrial process heat only, using UCO TRISO fuel, a graphite moderator and a helium primary coolant, with design status 'Detailed design'. ASNR's PRM projects page (dated 14 October 2026) lists the INB Fermi industrial reactor/demonstrator at 20 MWth and says Jimmy Energy filed a creation-authorization (DAC) application on 27 May 2024 for Fermi at Bazancourt, to supply heat to a Cristal Union plant; on 23 July 2026 Jimmy submitted an updated file including reactor design modifications, which ASNR was asked to review technically on 24 July 2026. The DAC is under review, not an authorization to build or operate, and the July 2026 design modifications mean the catalog description may no longer match the reactor under review. Jimmy's own release dates its DAC filing to 29 April 2024 (the catalog also says April 2024), not ASNR's 27 May 2024, and says the Cristanol solution could supply 10 MW, which is heat delivered rather than the reactor rating. These sources connect the linked Bazancourt deployment. The stored Jimmy vendor, HTGR family, helium coolant, 20 MWth rating with no stated basis, thermal-only electrical basis and TRISO fuel form match; the stored thermal spectrum matches the ARIS classification only. Last checked 19 Oct 2026. ASNR, PRM projects and their fuel-fabrication plants; Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); Jimmy deployment announcement
    What would change this

    ASNR's technical opinion on the updated Fermi DAC file or a decree authorizing creation of INB Fermi, which would also fix the post-modification reactor rating. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Construction applications and decisions