KLT-40S
Marine-derived PWR used as twin units on Akademik Lomonosov. IAEA PRIS lists each unit at 150 MWth, 35 MWe gross, 32 MWe net and 30 MWe design net; the plant total is about 70 MWe gross.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- Operating: Akademik Lomonosov floating NPP.
- Evidence
- 5 sources; first primary source: Akademik Lomonosov floating NPP. Record reviewed 9 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Pressurized water reactor (PWR)
The IAEA's 2018 SMR booklet describes a four-loop primary circuit, so no integral layout is recorded. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s)
- Rosatom
- Module electrical
- 35 MWe (gross)
- Module thermal
- 150 MWth (nameplate; basis unspecified)
- Reactor vessel
- 4.8 m tall, 2 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 147.
SMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallKLT-40S
4.8 m tall, 2 m across - Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 9 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- Akademik Lomonosov floating NPP — Operating · Russia
Design sources
(5)
- Akademik Lomonosov floating NPP (company, accessed 1 Oct 2026)
- IAEA Power Reactor Information System (PRIS) (IAEA/NEA, accessed 1 Oct 2026)
- IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026 (IAEA/NEA, accessed 18 Oct 2026)
- IAEA: Nuclear Power Reactors in the World, Reference Data Series No. 2, 2026 edition (IAEA-RDS-2/46, September 2026) (IAEA/NEA, accessed 9 Oct 2026)
- IAEA, Advances in Small Modular Reactor Technology Developments (2018 edition) (IAEA/NEA, accessed 3 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. IAEA PRIS statistics (captured 9 October 2026) list Akademik Lomonosov-1 and -2 at Pevek, Russia, as operational pressurized light-water-moderated and cooled reactors of model KLT-40S 'Floating', each at 150 MWt, 35 MWe gross, 32 MWe net and 30 MWe design net, grid-connected on 19 December 2019 and in commercial operation from 22 May 2020; these are per-unit values, so the twin-unit plant is about 70 MWe gross. The same records name Concern Rosenergoatom as owner and operator and Atomenergomash as reactor supplier, and the IAEA's 2026 Nuclear Power Reactors in the World (RDS-2/46) lists Akademik Lomonosov-1 and -2 as PWRs of the KLT-40S 'Floating' type. These sources connect the linked operating Akademik Lomonosov floating plant and show electricity-generating units; they do not describe the design's developer, integral layout or marine origin. The stored light-water coolant and 150 MWth / 35 MWe gross per-unit ratings match PRIS; no opened source names Rosatom as design vendor (PRIS gives Atomenergomash as reactor supplier), and the stored thermal spectrum is not stated by these sources, which say PWR and light-water-moderated. The Rosatom page timed out and the PRIS home page saved only a script shell, so neither was read. Last checked 19 Oct 2026. IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026; IAEA: Nuclear Power Reactors in the World, Reference Data Series No. 2, 2026 edition (IAEA-RDS-2/46, September 2026); Akademik Lomonosov floating NPP
What would change this
A PRIS update changing the Akademik Lomonosov units' status or ratings, or a readable Rosatom or OKBM Afrikantov KLT-40S design page naming the developer and layout. Next scheduled check: 19 Jan 2027.
- Technology family. The IAEA's 2018 SMR booklet describes a four-loop primary circuit, so no integral layout is recorded. Last checked 1 Nov 2026. IAEA, Advances in Small Modular Reactor Technology Developments (2018 edition); IAEA PRIS statistics: reactors by country code (Russia), captured 9 October 2026
What would change this
A developer, regulator or IAEA document that states this design's primary-circuit layout. Next scheduled check: 1 Feb 2027.