Natura MSR-100
Natura commercial molten-salt system named MSR-100 in the Texas A&M announcement, which gave no electrical output. Natura's 2 December 2025 GAIN release calls the design a 100-MWe system, without specifying gross/net or single-module versus plant scope; module ratings and the RELLIS project output remain unassigned. The same release reports a GAIN voucher for ORNL collaboration on graphite qualification and fuel-bearing-salt irradiation development, with no amount or completed irradiation work stated.
- Reactor type
- Molten salt reactor. How it works, with a 3D view.
- Projects
- Siting: Natura MSR-100 proposal at Texas A&M-RELLIS.
- Evidence
- 4 sources; first primary source: Texas A&M System Goes Nuclear. Record reviewed 1 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Molten salt reactor (MSR)
- Coolant
- Molten salt
- Developer / vendor(s)
- Natura Resources
- Fuel form
- LiF-BeF₂-UF₄ fuel salt (FLiBe with uranium)
- Enrichment
- <10% enriched LEU+; 19.5% enriched HALEU
- Inclusion basis
- Vendor SMR claim, capacity checked
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions); Module rating (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(3 without a known value)
- Spectrum
- Not recorded
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Natura MSR-100 proposal at Texas A&M-RELLIS — Siting · United States
Agreements naming this design (3)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- Natura Resources and NGL Water Solutions Permian agreement on MSR-100 power and produced-water treatment (Texas) — Cooperation agreement or MOU · Active · announced 3 Feb 2026
Concerns United States - Natura acquisition of Shepherd Power and commercialization agreement with NOV — Cooperation agreement or MOU · Status not established · announced 10 Dec 2025
Concerns United States - Natura and 3M lithium-7 development and qualification agreement — Research program · Status not established · announced 4 Nov 2025
Concerns United States
Design sources
(4)
- Texas A&M System Goes Nuclear (government, accessed 1 Oct 2026)
- naturaresources.com: Natura MSR-100 (company, accessed 14 Oct 2026)
- Natura Resources issuer release, 2025-12-02 (company, published 2 Dec 2025, accessed 19 Oct 2026)
- Natura Resources: GAIN voucher to advance molten salt SMR technology (company, published 2 Dec 2025, accessed 19 Oct 2026)
Evidence and open questions
(3 notes)
- Evidence review. Natura describes MSR-100 as a commercial platform and, in its GAIN announcement, a 100 MWe system. Individual-module electrical output and gross/net are not explicit, so the standing module-rating hold remains. The company-site capture forecasts a first commercial reactor in the early 2030s, while the 2 December 2025 PRNewswire copy says 2030; these are versions of one company announcement, not independent corroboration or achieved milestones. RELLIS remains a separate deployment proposal, and the MSR-1 research reactor is not this design. Last checked 19 Oct 2026. naturaresources.com: Natura MSR-100; Texas A&M System Goes Nuclear; Natura Resources: GAIN voucher to advance molten salt SMR technology
What would change this
A Natura design specification that states gross or net, thermal power, and the neutron spectrum for the MSR-100 module. Next scheduled check: 19 Jan 2027.
- Module rating: Not disclosed in the reviewed evidence. The GAIN announcement describes a 100 MWe commercial system but does not clearly state module count or individual-module output. The separately worded 100 MW commercial page is not converted into electricity. No module rating is stored. A system-level figure does not resolve this module-specific gap. Last checked 19 Oct 2026. Natura Resources issuer release, 2025-12-02
What would change this
A Natura technical datasheet expressly states individual-module electrical output and its gross/net basis. Next scheduled check: 19 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. The December 2025 release describes graphite qualification for a molten-salt MSR-100. It does not say thermal, fast or epithermal. Last checked 19 Oct 2026. Natura Resources: GAIN voucher to advance molten salt SMR technology
What would change this
A Natura or NRC design description that names the MSR-100 neutron spectrum. Next scheduled check: 19 Jan 2027.