Natura MSR-100 proposal at Texas A&M-RELLIS

Natura's commercial MSR-100 proposal at RELLIS was announced 4 Feb 2025, separate from its earlier MSR-1 demonstration work.

Current status

Stage
Siting
How current
General record check . Bounded evidence review . None of the 2 listed sources has a publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: . Next evidence or detail review: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • The mapped point is not an exact surveyed coordinate.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Reactor type
Molten salt reactor. How it works, with a 3D view.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example. On the left, a tall reactor vessel holds graphite with fuel channels low down and primary heat exchangers above it, with pump motors and shutdown drives on top.
Schematic of IMSR (Integral Molten Salt Reactor), this type's example.

Description

Texas A&M has a campus-wide NRC early-site-permit pre-application, not a Natura-specific application or permit. A future licensed operator and capacity are not stated.

Key facts

Design
Natura MSR-100 (SMR)
Technology
Molten salt reactor (MSR) · molten salt
Operator(s)
Not recorded
Vendor for linked design
Natura Resources
Location
Texas A&M-RELLIS Energy Proving Ground · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Shared campus pin for distinct company proposals. Coordinate is the NuclearChain CC BY 4.0 sites export pin for the Aalo Texas A&M discovery row (position_approximate=1), which sits on the RELLIS campus. It is not a reactor-building survey and is not a headquarters pin.
Coordinates
30.6420749, -96.4682751 · site-area point (approximate)
Electrical capacity
Not recorded · scope: unknown
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
9 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes

Natura MSR-100 proposal at Texas A&M-RELLIS is recorded at Texas A&M-RELLIS Energy Proving Ground, Texas, United States. Operator: No operator is recorded. Recorded vendor: Natura Resources. Stage: Siting. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate). Other records at this site: Aalo commercial proposal at Texas A&M-RELLIS, Kairos commercial proposal at Texas A&M-RELLIS, Terrestrial Energy IMSR at Texas A&M-RELLIS, Last Energy PWR-5 pilot at Texas A&M-RELLIS.

Coordinate source: NuclearChain data exports, NuclearChain sites.csv row 'aalo-atomics-texas-a-and-m-nuclear-power-plant' (30.6420749, -96.4682751)

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Reactor supplier
Fuel
  • Fuel form stated for Natura MSR-100LiF-BeF₂-UF₄ fuel salt (FLiBe with uranium)
  • Enrichment stated for Natura MSR-100<10% enriched LEU+; 19.5% enriched HALEU
No project-specific fuel supply arrangement is recorded as a structured fact.

The 4 February 2025 Texas A&M System announcement and the NRC's campus pre-application page name no fuel supplier, fabrication, allocation or delivery for a Natura MSR-100 at RELLIS. The announcement does not discuss fuel. Texas A&M System Goes Nuclear

Site host or owner
Not found in the sources we checked (4): Customer or offtaker; Contractor; Funding and government decisions; Comparable schedule revision
Customer or offtaker

The 4 February 2025 Texas A&M System announcement quotes Natura planning to deploy its commercial MSR-100 at RELLIS to address Texas and national energy needs, and says proving-ground power could supply the ERCOT grid, but it names no buyer, quantity or agreement. The NRC's campus pre-application page, last reviewed 15 September 2026, names none either. Texas A&M is the site host, not a customer. Texas A&M System Goes Nuclear

Contractor

The 4 February 2025 Texas A&M System announcement and the NRC's campus pre-application page name no engineering, licensing or construction contractor for a Natura MSR-100 at RELLIS. The announcement quotes Natura continuing its partnership with the System, the site host, to deploy the MSR-100 there, and says the System began a campus early-site-permit process. The earlier MSR-1 collaboration is a separate project. Texas A&M System Goes Nuclear

Funding and government decisions

The 4 February 2025 Texas A&M System announcement and the NRC's campus pre-application page, last reviewed 15 September 2026, state no amount, grant, loan or investment for a Natura MSR-100 at RELLIS. The campus early-site-permit process is regulatory, not a funding instrument. Texas A&M System Goes Nuclear

Comparable schedule revision

Comparable schedule revision not established. The 4 February 2025 Texas A&M System announcement says the first RELLIS reactors could be built within five years, and the NRC's campus page, last reviewed 15 September 2026, still shows an early-site-permit submittal planned for the fourth quarter of 2025. These are different campus-level milestones, each stated once, so no revision is shown for the Natura MSR-100. NRC pre-application activities: Texas A&M University System; Texas A&M System Goes Nuclear

Not recorded in SMRMap's reviewed evidence (3): Project proposer or applicant; Operator or intended licensed owner; Programs and agreements naming the project
Project proposer or applicant
No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
Operator or intended licensed owner
Programs and agreements naming the project

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 notes, 1 not yet reviewed)
  • Evidence review. The Texas A&M University System's 4 February 2025 release says the chief executives of Kairos Power, Natura Resources, Terrestrial Energy and Aalo Atomics agreed to work with the System to bring reactors to the 2,400-acre Texas A&M-RELLIS campus in Bryan, Texas, part of the Energy Proving Ground, on land the Chancellor offered to the four companies. It quotes Natura's chief executive saying the company will continue its partnership with the System to deploy its commercial system, the Natura MSR-100, on the RELLIS campus, after five years of collaboration on the Natura MSR-1 demonstration system. The release states no MSR-100 unit count, capacity, schedule or operator, and the instrument is the announced agreements with the System. The NRC's pre-application page (last updated 15 September 2026) records campus-wide early site permit pre-application activity by the System for multiple advanced reactors rated 10-1000 MWe gross, with submittal planned for the fourth quarter of 2025, and names no vendor. The next documentary decision is the System's ESP application and NRC docketing, or a Natura agreement or filing for an MSR-100 at RELLIS. The stored Natura MSR-100 design, Natura as vendor and the siting stage stay; module count, capacity and operator stay unknown, and the opened sources do not show that the ESP application was submitted. Last checked 19 Oct 2026. Texas A&M System Goes Nuclear; NRC pre-application activities: Texas A&M University System
    What would change this

    Texas A&M University System's early site permit application and the NRC's docketing notice, or a Natura Resources agreement or filing stating MSR-100 unit count and output at RELLIS. Next scheduled check: 19 Jan 2027.

  • Next decision and prerequisites. The next consequential step shown is Texas A&M filing its early site permit application for RELLIS; the NRC page, updated 15 September 2026, still lists only pre-application activities and gives no filing date. The February 2025 announcement says the first reactors at the proving ground could be built within five years. That is a stated possibility, not a Natura construction schedule. Last checked 23 Oct 2026. NRC pre-application activities: Texas A&M University System; Texas A&M System Goes Nuclear
    What would change this

    Texas A&M's ESP filing, or a Natura construction or license decision for RELLIS. Next scheduled check: 23 Apr 2027.

  • Permissions and public process. The NRC's Texas A&M University System page, updated 15 September 2026, says the NRC is in pre-application activities with the System on a future early site permit for multiple advanced reactors at the RELLIS campus. Texas A&M's February 2025 announcement says the System began that process for the site where Natura Resources proposed a commercial Natura MSR-100. This campus-wide pre-application is not a filed application, a permit or a Natura-specific license, and these sources record no public consultation. Last checked 23 Oct 2026. NRC pre-application activities: Texas A&M University System; Texas A&M System Goes Nuclear
    What would change this

    Texas A&M's early site permit application for RELLIS, or a Natura license application naming the site. Next scheduled check: 23 Apr 2027.

  • Site dependencies (land, grid, water). Texas A&M's February 2025 announcement says the System offered land at the 2,400-acre RELLIS campus in Bryan, Texas, to four reactor companies including Natura Resources, and that power from the proving ground could supply the ERCOT grid. An offer of land under a cooperation agreement is not a lease, and the sources read state no Natura-specific plot, interconnection or cooling-water arrangement. Last checked 23 Oct 2026. Texas A&M System Goes Nuclear
    What would change this

    A ground lease or site agreement for Natura Resources at RELLIS, or an ERCOT interconnection request. Next scheduled check: 23 Apr 2027.

Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(0 of 2 sources with a publication or document date)
Latest dated listed source publication: no date recorded.Latest dated recorded event: no date recorded.2 of 2 listed sources have no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(2)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Natura MSR-100 proposal at Texas A&M-RELLIS — https://smrmap.com/projects/natura-msr-100-rellis/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Natura MSR-100 proposal at Texas A&M-RELLIS”. Record reviewed 9 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/natura-msr-100-rellis/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.