NuScale US600
NuScale's earlier integral pressurized-water SMR design, which the NRC describes as a natural-circulation light-water reactor of 160 MWt and 50 MWe per module, with up to twelve modules and 600 MWe in one reactor building. The NRC approved its standard design on 11 September 2020 and certified it by a rule published on 19 January 2023. The later NuScale VOYGR (US460 / NPM) uses larger modules and holds its own 2025 approval; the US600 certification does not cover it. No deployment project in SMRMap uses the US600.
- Reactor type
- Integral pressurized water reactor. How it works, with a 3D view.
- Projects
- No projects tracked here. Development status as stated: NRC design certification, rule published 19 January 2023; not a site permission.
- Evidence
- 3 sources; first primary source: NRC: Design Certification - NuScale US600 (past licensing activities). Record reviewed 28 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Integral pressurized water reactor (iPWR)
- Coolant
- Light water
- Developer / vendor(s)
- NuScale Power
- Module electrical
- 50 MWe (gross/net unspecified)
- Module thermal
- 160 MWth (nameplate; basis unspecified)
- Development status (as stated)
- NRC design certification, rule published 19 January 2023; not a site permission
- Inclusion basis
- SMR by regulator classification
- Confidence
- high
- Not yet recorded
- Expected but not recorded as a structured fact: Neutron spectrum. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 28 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Spectrum
- Not recorded
Tracked deployment projects
- No projects tracked here.
Design sources
(3)
- NRC: Design Certification - NuScale US600 (past licensing activities) (regulator, page updated 14 Sep 2026, accessed 28 Oct 2026)
- eCFR: Appendix G to 10 CFR Part 52, Design Certification Rule for NuScale (government, accessed 28 Oct 2026)
- NRC: Design Certification Applications for New Reactors (regulator, page updated 14 Sep 2026, accessed 28 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The NRC's past-licensing page for the NuScale US600 (last reviewed 14 September 2026) describes a standard design certification for up to twelve NuScale SMRs of 160 MWt and 50 MWe each, 600 MWe in total, an integral pressurized-water, natural-circulation light-water design, and records a US600 standard design approval requested on 13 July 2020 and approved on 11 September 2020. The eCFR text of Appendix G to 10 CFR Part 52 cites 88 FR 3306 of 19 January 2023 and allows reference for 40 years from 21 February 2023. The NRC's issued-certifications list names the US600. No source states the neutron spectrum or a gross or net electrical basis. This profile is separate from the VOYGR profile, whose 77 MWe US460 module holds the 2025 standard design approval. Last checked 28 Oct 2026. NRC: Design Certification - NuScale US600 (past licensing activities); eCFR: Appendix G to 10 CFR Part 52, Design Certification Rule for NuScale
What would change this
The NRC amends, renews or withdraws the US600 certification, or a project references the US600. Next scheduled check: 28 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- NRC design certification of the NuScale US600 — applies to the design, not to a site
Design assessment · Issued / approved · NRC · decided 19 Jan 2023
The NRC lists the NuScale US600 among its issued design certifications. NuScale filed the application by letter dated 31 December 2016; the NRC lists it as tendered in December 2016, with the submission completed in January 2017. The certification rule, Appendix G to 10 CFR Part 52, was published on 19 January 2023 (88 FR 3306) and may be referenced for 40 years from 21 February 2023. The US600 is NuScale's earlier configuration of up to twelve modules of 50 MWe and 160 MWt each, which also received a standard design approval on 11 September 2020; the later US460 holds its own 2025 standard design approval. A design certification approves a design independent of any site and is not permission to build or operate.
Sources: eCFR: Appendix G to 10 CFR Part 52, Design Certification Rule for NuScale; NRC: Design Certification - NuScale US600 (past licensing activities); NRC: Design Certification Applications for New Reactors; Federal Register FR Doc. 2017-06309 (30 Mar 2017): NuScale design certification application accepted for docketing - NRC standard design approval for the NuScale US600 — applies to the design, not to a site
Design assessment · Issued / approved · NRC · decided 11 Sep 2020 · submitted 13 Jul 2020 · ADAMS ML20247J564
The NRC records that NuScale requested a standard design approval for the US600 on 13 July 2020 and that it was approved on 11 September 2020 (ML20247J564). The design was later certified by rule in January 2023. A standard design approval approves a design independent of any site; it is not permission to build or operate.
Sources: NRC: Design Certification - NuScale US600 (past licensing activities)