NuScale VOYGR (US460 / NPM)

Integral PWR module; US460 configuration uses six ~77 MWe modules (~462 MWe plant). Earlier 50 MWe design was certified; capacity basis differs by configuration. The NRC issued a standard design approval for the US460 design on 29 May 2025; that is a design approval, not permission for any site or project.

Reactor type
Integral pressurized water reactor. How it works, with a 3D view.
Projects
Licensing: NuScale VOYGR Doicești (Romania). Furthest recorded stage of 4 using this design, including 1 canceled and 1 earlier-plan record.
Evidence
3 sources; first primary source: Federal Register 90 FR 23716 (4 Jun 2025): NuScale US460 standard design approval. Record reviewed 10 Oct 2026.
Schematic of CAREM-25, this type's example. A single pressure vessel holds the core below helical steam generators, with a steam dome at the top.
Schematic of CAREM-25, this type's example.

Key facts

Class
SMR
Technology
Integral pressurized water reactor (iPWR)
Coolant
Light water
Spectrum
Thermal
Developer / vendor(s)
NuScale Power
Module electrical
77 MWe (gross)
Module thermal
250 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
medium
Record reviewed
10 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (6)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(3)

Evidence and open questions

(1 note)
  • Evidence review. The only readable attached source naming this design is the secondary EnergyNote 2026 SMR licensing map (data as of 2 October 2026), which lists the NuScale US460 as an integral LWR of 6 x 77 MWe in the US, with the NRC standard design approval granted May 29, 2025, and says the earlier 50 MWe design was certified in January 2023; that SDA is a design-stage instrument, not a site permission. It calls NuScale the only SMR developer with an NRC design approval, places NuScale among the light-water designs, and gives a first batch around 2030 with a non-binding TVA-ENTRA1 6 GW agreement. For deployments it says the NuScale-UAMPS project was canceled in November 2023 (the Carbon Free Power Project) and that Samsung C&T is tied to NuScale Romania (the Doicești project); no opened source names the Wylfa/Shearwater, Ghana or Standard Power proposals. The attached Federal Register notice could not be opened when checked, so the SDA notice itself was not read, and the WNA SMR page (updated 1 October 2026) no longer names NuScale. Stored vendor, iPWR family, light-water coolant and the 77 MWe module figure stay; the stored 'gross' electrical basis, 250 MWth thermal rating and thermal spectrum are not stated in any opened source. Last checked 19 Oct 2026. EnergyNote 2026 SMR licensing map
    What would change this

    A readable copy of the NRC US460 standard design approval or its final safety evaluation (ML25129A004 / ML25086A073), which would confirm the module thermal rating, the gross or net basis of 77 MWe and the approval scope; or a construction permit application referencing the US460 (for example for Doicesti). Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Design assessment

Site applications and decisions