Project Pele microreactor (BWXT HTGR)
DoD transportable HTGR microreactor prototype by BWXT, about 1.5 MWe class (a 1–5 MWe range appears in DOE materials), distinct from the civil BANR design. BWXT's program timeline reports core stacking complete in June 2026. Its next steps are shipment from Lynchburg to Idaho National Laboratory, fuel loading and demonstration testing; the company page does not establish that those later steps occurred or that DOE authorized operation.
- Reactor type
- High-temperature gas-cooled reactor. How it works, with a 3D view.
- Projects
- Construction: Project Pele (INL microreactor demonstration).
- Evidence
- 3 sources; first primary source: DOE Project Pele groundbreaking article. Record reviewed 1 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- High-temperature gas-cooled reactor (HTGR)
- Coolant
- Helium
- Spectrum
- Thermal
- Developer / vendor(s)
- BWX Technologies
- Module electrical
- 1.5 MWe (gross/net unspecified)
- Fuel form
- TRISO
- Enrichment
- HALEU
- Inclusion basis
- Labeled microreactor
- Confidence
- high
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(1 without a known value)
- Module thermal
- Not recorded
Tracked deployment projects
- Project Pele (INL microreactor demonstration) — Construction · United States
Design sources
(3)
- DOE Project Pele groundbreaking article (government, accessed 1 Oct 2026)
- BWXT Project Pele page (company, accessed 18 Oct 2026)
- BWXT: Project Pele programme page (company, accessed 9 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. BWXT's Project Pele page describes a Generation IV high-temperature gas-cooled reactor designed by BWXT and contracted by the U.S. Department of War's Strategic Capabilities Office, delivering 1.5 MW of carbon-free electricity inside four 20-foot containers, using TRISO fuel. The page lists core barrel cartridge installation complete in September 2026 and says the next step is shipment from Lynchburg to Idaho National Laboratory for fuel loading and demonstration tests. DOE's groundbreaking article says the Department of Defense is planning to design, build and demonstrate a transportable high-temperature gas reactor at INL, and that BWXT will use Pele experience for the separate civil BANR microreactor. The word helium is not in these pages. Stored 1.5 MWe matches the BWXT electricity figure; gross versus net is not stated. Last checked 19 Oct 2026. BWXT Project Pele page; DOE Project Pele groundbreaking article
What would change this
A BWXT or DOE statement that the Pele reactor has been shipped to INL or that replaces the 1.5 MW electricity figure. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Environmental decision
- Project Pele record of decision (prototype mobile microreactor environmental impact statement) — Project Pele (INL microreactor demonstration)
Environmental decision · Issued / approved · U.S. Department of Defense, Strategic Capabilities Office · decided 5 Apr 2022 · 87 FR 22521
Signed 5 April 2022 and published 15 April 2022 at 87 FR 22521. The Strategic Capabilities Office decided to implement the proposed action of its final environmental impact statement: fabricate the prototype mobile microreactor and its fuel at existing off-site commercial facilities and demonstrate it at the Idaho National Laboratory Site. This is a National Environmental Policy Act decision. This record addresses the environmental decision; it does not establish the status of any separate DOE safety authorization. No such authorization document was opened.
Sources: Federal Register 87 FR 22521 (15 Apr 2022): Record of Decision, Construction and Demonstration of a Prototype Mobile Microreactor