Unity
Deployable Energy Unity microreactor. INL’s 30 September 2026 release describes the full configuration as 1 MWe, light-water-moderated and helium-cooled; thermal output and gross/net electrical basis are not stated. The separate 30 June 2026 INL zero-power experiment (0 MWth, no electricity, no active cooling) is not this full-power rating. A conditional 2027 DOME test is planned, not achieved.
- Reactor type
- No type-page assignment: this may be a different arrangement or a type not yet established by the evidence. See the description and evidence below, or the reactor types SMRMap explains.
- Projects
- Commissioning: Deployable Energy Unity at Idaho National Laboratory. Furthest recorded stage of 3 using this design.
- Evidence
- 5 sources; first primary source: DOE fact sheet: The Golden Era of American Nuclear Energy Has Arrived. Record reviewed 13 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- Microreactor
- Technology
- Other (see description)
- Coolant
- Helium
- Developer / vendor(s)
- Deployable Energy
- Module electrical
- 1 MWe (gross/net unspecified)
- Fuel form
- UO2 annular pellets, Zircaloy cladding
- Enrichment
- 4.95% U-235 (LEU)
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Neutron spectrum (reviewed: not disclosed in the reviewed evidence; see Evidence and open questions). A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 13 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Spectrum
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Deployable Energy Unity at Idaho National Laboratory — Commissioning · United States
- Deployable Energy Unity full-power test in INL's DOME (2027) — Siting · United States
- Deployable Energy–Hornbeck Unity maritime demonstration proposal — Announced · United States
Design sources
(5)
- DOE fact sheet: The Golden Era of American Nuclear Energy Has Arrived (government, accessed 1 Oct 2026)
- DOE EM note on four Reactor Pilot criticality reviews (government, accessed 1 Oct 2026)
- Deployable Energy: technology (company, accessed 2 Oct 2026)
- DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality (government, dated 15 Apr 2026, accessed 4 Oct 2026)
- INL: Deployable Energy selected to test its nuclear battery at DOME (government, published 30 Sep 2026, accessed 13 Oct 2026)
Evidence and open questions
(2 notes)
- Evidence review. DOE-Idaho's categorical exclusion CX for the Deployable Energy zero-power criticality test (posting DOE-ID-INL-26-011, approved 4/15/2026) describes the Unity core as a compact microreactor intended for future deployment as a modular 1-megawatt electric unit, using established LWR fuel technology (4.95% U-235 UO2 pellets in Zircaloy), helium cooling in its full configuration and a physically separate water moderator; the test itself is bounded at 0 MWth and 0 kWe at INL's Materials and Fuels Complex. Deployable Energy's technology page calls the product the Unity Nuclear Battery, cites 4.95% enriched UO2 fuel and helium coolant, and offers a six-month lead time starting in 2030. DOE's 25 July 2026 fact sheet says Unity completed a criticality demonstration at INL on June 30, 2026 (a zero-power DOE pilot milestone, not electrical operation). Deployment link supported: the Unity project at INL (zero-power test); the conditional 2027 DOME full-power test is stated only in the INL release that returned an access refusal (HTTP 403), and no readable source names the Hornbeck maritime proposal. Stored vendor, 'other' family, helium coolant, 1 MWe (unspecified basis), no thermal rating, fuel form and enrichment stay supported; neutron spectrum stays unknown because no readable source states it. Last checked 19 Oct 2026. DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality; Deployable Energy: technology; DOE fact sheet: The Golden Era of American Nuclear Energy Has Arrived
What would change this
DOE authorization (PDSA/DSA) for the Unity full-power DOME test planned for 2027, or a Deployable Energy technical description stating the neutron spectrum and module MWth. Next scheduled check: 19 Jan 2027.
- Neutron spectrum: Not disclosed in the reviewed evidence. No readable attached source states Unity's neutron spectrum. The CX and Deployable Energy pages describe light-water moderation with helium cooling, which points toward a moderated core but is not a stated spectrum; the INL DOME release could not be read (access refused, HTTP 403). Last checked 19 Oct 2026. DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality; INL: Deployable Energy selected to test its nuclear battery at DOME
What would change this
A readable INL/DOE DOME selection document or Deployable Energy design report that states thermal (or other) spectrum for the full Unity configuration. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Environmental decision
- DOE Idaho categorical exclusion CX-271007 for the Unity zero-power test — Deployable Energy Unity at Idaho National Laboratory
Environmental decision · Issued / approved · U.S. Department of Energy, Idaho Operations Office · decided 15 Apr 2026
Approved 15 April 2026 under posting DOE-ID-INL-26-011. Covers a zero-power criticality test bounded at 0 MWth and 0 kWe. It does not authorize the future 1 MWe configuration and is not an operating license.
Sources: DOE Idaho categorical exclusion CX-271007 PDF: Unity zero-power criticality