Projects / United States · Announced

Beck Creek Energy SMR proposal (Amherst County)

Geenex Power announced Beck Creek Energy to the Amherst County, Virginia, supervisors on 6 October 2026 as a proposed small modular reactor facility of up to 650 MW, and on 8 October named an approximately 250-acre property between Joshua Falls Road and a bend of the James River in eastern Amherst County.

Current status

Stage
Announced
How current
General record check . 2 of 3 listed sources have a publication or document date recorded here; the newest is 8 Oct 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates

No dated development is recorded. Next general check: .

Permissions
No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
Latest development
No actual dated development is recorded.
Next dated milestone
No next milestone date is recorded.
Selected limitations
  • Electrical output is not recorded.
  • Thermal output is not recorded on this project.
  • No operator is recorded.
  • No map pin is shown for this record.
  • Expected for this stage but not recorded as a structured fact: Design identified. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.

A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.

Description

Geenex is a site developer and says it will later choose a technology partner to design, license and operate the reactor, so no design, vendor, unit count or operator is recorded; the project says the plant could be one reactor or several. It plans a local permitting application in 2027 and expects construction in the early 2030s; these are targets. Early-stage site evaluation, with no NRC application. Separate from Appalachian Power's Joshua Falls proposal across the river in Campbell County.

Key facts

Design
Design profile not linked (SMR)
Technology
Not recorded on a linked design profile — see the description
Operator(s)
Not recorded
Vendor for linked design
No selected-design vendor recorded
Location
Beck Creek Energy site, eastern Amherst County · United States · precision: site area (named plant, laboratory, base, port, campus or parcel)
Geenex disclosed an approximately 250-acre property between Joshua Falls Road and a bend of the James River, south of Galts Mill Road, across the river from the Joshua Falls substation. No coordinates are published, so no pin is shown; this is not the Appalachian Power Joshua Falls property in Campbell County.
Coordinates
Named site, no map pin
Electrical capacity
Not recorded · scope: plant
Thermal capacity
Not recorded
Modules planned
Not recorded
Inclusion basis
Vendor SMR claim, capacity checked
Confidence
medium
Record reviewed
30 Oct 2026
Site and capacity notes

Beck Creek Energy SMR proposal (Amherst County) is recorded at Beck Creek Energy site, eastern Amherst County, Virginia, United States. Operator: No operator is recorded. Recorded vendor: No selected-design vendor is recorded. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); named site, no map pin.

Electrical output is not recorded on this project. Module count is not recorded. Thermal output is not recorded on this project.

Who is involved

Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.

More on reading these answers

Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.

Project proposer or applicant
Not recorded in SMRMap's reviewed evidence (9): Operator or intended licensed owner; Reactor supplier; Customer or offtaker; Contractor; Funding and government decisions; Fuel; Site host or owner; Programs and agreements naming the project; Comparable schedule revision
Operator or intended licensed owner
Reactor supplier
Customer or offtaker

No separate question review is recorded.

Contractor

No separate question review is recorded.

Funding and government decisions

No separate question review is recorded.

Fuel
No design profile is linked, so no stated fuel is shown.No project-specific fuel supply arrangement is recorded as a structured fact.

No separate question review is recorded.

Site host or owner
Programs and agreements naming the project
Comparable schedule revision

No separate question review is recorded.

Timeline

This timeline has no entries yet. Other dated information may appear in the description and checking notes.

Permissions and applications

Selected jurisdiction context

Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.

Evidence and open questions

(4 not yet reviewed)

Not yet reviewed against sources: Permissions and public process; Site dependencies (land, grid, water); Spent fuel, waste and closure; Next decision and prerequisites. An unreviewed question is unfinished research, not a finding that nothing exists.

Evidence dates

(2 of 3 sources with a publication or document date)
Latest dated listed source publication: Cardinal News: developer reveals proposed location for Amherst County nuclear energy project: 8 Oct 2026.Latest dated recorded event: no date recorded.1 of 3 listed sources has no publication or document date recorded here.

Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.

Sources

(3)

Suggest an update

If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.

No email program? Write to corrections@smrmap.com and include the project name and link: Beck Creek Energy SMR proposal (Amherst County) — https://smrmap.com/projects/beck-creek-energy-amherst/. Suggestions are checked against sources before anything changes; see how corrections work.

Cite or share this page

SMRMap. “Beck Creek Energy SMR proposal (Amherst County)”. Record reviewed 30 Oct 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/beck-creek-energy-amherst/ (accessed [date]). Data license CC BY 4.0.

“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.