Projects / Canada · Announced
ARC-100 proposal at the Port of Belledune Green Energy Hub
In November 2022 the Belledune Port Authority said it would pursue ARC small modular reactor technology at the port's Green Energy Hub in Canada.
Current status
- How current
- General record check . Bounded evidence review . The listed source has no publication or document date recorded here. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Electrical output is not recorded.
- Thermal output is not recorded on this project.
- No operator is recorded.
- The mapped point is not an exact surveyed coordinate.
- Same design
- 3 tracked: 1 licensing, 2 announced. 96 tracked at announced across all designs. Recorded stages, not proof of current activity.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Sodium-cooled fast reactor. How it works, with a 3D view.
View on the map · View on the 3D globe · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
It said it would do so with Cross River Infrastructure Partners, for hydrogen production and industrial heat and power. Its release describes a minimum of 1 GW of heat and power, without specifying the reactor count or separating electrical and thermal output. Feasibility studies, environmental approvals and licensing were still required; no later status is established in the reviewed sources. Separate from the Prodigy proposal at Belledune and the ARC-100 at Point Lepreau.
Key facts
- Design
- ARC-100 (SMR)
- Technology
- Sodium-cooled fast reactor (SFR) · sodium
- Operator(s)
- Not recorded
- Vendor for linked design
- ARC Clean Technology
- Location
- Port of Belledune Green Energy Hub · Canada · precision: site area (named plant, laboratory, base, port, campus or parcel)
Port point from the Wikipedia article for the Port of Belledune; the port authority names its Green Energy Hub but no reactor pad, so this marks the port area. - Coordinates
- 47.91167, -65.84167 · site-area point (approximate)
- Electrical capacity
- Not recorded · scope: module
- Thermal capacity
- Not recorded
- Inclusion basis
- SMR by design class
- Confidence
- medium
- Record reviewed
- 2 Oct 2026Evidence review 19 Oct 2026. How current names both.
Site and capacity notes
ARC-100 proposal at the Port of Belledune Green Energy Hub is recorded at Port of Belledune Green Energy Hub, New Brunswick, Canada. Operator: No operator is recorded. Recorded vendor: ARC Clean Technology. Stage: Announced. Location precision: site area (named plant, laboratory, base, port, campus or parcel); site-area point (approximate).
Coordinate source: Wikipedia: Port of Belledune (article coordinates), Article coordinate 47.91167, -65.84167 on 'Port of Belledune', read 30 October 2026
Electrical output is not recorded on this project. Modules planned: 1. Thermal output is not recorded on this project. The linked design record states 286 MWth (nameplate; basis unspecified) (module); that figure is not copied onto this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designARC Clean Technology
Not found in the sources we checked (5): Customer or offtaker; Contractor; Funding and government decisions; Fuel; Comparable schedule revision
- Customer or offtaker
The Belledune Port Authority's 28 November 2022 announcement says the ARC-100 would serve expanded hydrogen production and other port industries, which may include metal fabrication and advanced manufacturing. Those are intended uses. The announcement names no buyer, quantity or agreement for the unit's power or heat. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
- Contractor
The Belledune Port Authority's 28 November 2022 announcement says the port is working with Cross River Infrastructure Partners, named as project developer, to pursue an ARC-100 unit, pending feasibility studies, environmental approvals and licensing. A developer is a proposer, not a contractor. The announcement names no feasibility, engineering or construction contractor, and its 2021 Pabineau First Nation agreement concerns jobs and economic initiatives. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
- Funding and government decisions
The Belledune Port Authority's 28 November 2022 announcement gives no cost, funder or financing for the ARC-100 unit. ARC's chief executive describes a relatively low cost of construction and operation without a figure, and the minimum 1 GW of heat and power is an output aim, not money. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
- Fuel
- No fuel form or enrichment is recorded on the linked design profile.No project-specific fuel supply arrangement is recorded as a structured fact.
The Belledune Port Authority's 28 November 2022 announcement mentions the fueling of low-carbon hydrogen projects as an ARC-100 application, which concerns hydrogen, not nuclear fuel. It names no nuclear fuel supplier, quantity or delivery for the Belledune unit. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
- Comparable schedule revision
Comparable schedule revision not established. The Belledune Port Authority's 28 November 2022 announcement gives one conditional window, commercial operation between 2030 and 2035 pending studies, approvals and licensing. The 2029 commissioning and late-2020s dates on the same page are for the separate Point Lepreau ARC-100. One window stated once is not a revision. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
Not recorded in SMRMap's reviewed evidence (4): Project proposer or applicant; Operator or intended licensed owner; Site host or owner; Programs and agreements naming the project
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Operator or intended licensed owner
- Site host or owner
- Programs and agreements naming the project
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(1)
- CNSC vendor design review, Phase 2 (ARC-100) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed Jul 2025
CNSC lists Phase 1 (executive summary dated October 2019) and Phase 2 (executive summary dated July 2025) of its pre-licensing vendor design review of ARC Clean Technology's ARC-100 among completed reviews. CNSC entered into the Phase 2 agreement with ARC on 9 March 2022; that agreement date is not the start of the whole review. The Phase 2 summary found no fundamental barriers to licensing at that time and listed further design work. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions. NB Power's Point Lepreau site application is a separate process.
Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: ARC-100 Phase 2 vendor design review executive summary
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(5 notes, 1 not yet reviewed)
- Evidence review. On 28 November 2022 the Belledune Port Authority said it was working with Cross River Infrastructure Partners to pursue an advanced small modular reactor from ARC Clean Technology Canada as part of an expansion at the port, and that the development could include an ARC-100 unit based at the port for hydrogen production and other industry. The same announcement places a hydrogen facility at the port's Green Energy Hub and says the aSMR development would generate a minimum of 1 GW of heat and power. That 1 GW figure is a development minimum, not one ARC-100, and it is not stored. No license, fuel contract or financing close is stated. The stored ARC-100 design, one module, ARC as vendor and announced stage stay. Last checked 19 Oct 2026. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
What would change this
A feasibility result, environmental filing or CNSC application naming the Belledune ARC-100 would change this record. Next scheduled check: 19 Jan 2027.
- Site location recorded as disclosed. The source places the contemplated ARC-100 at the Port of Belledune, a named industrial host. The related hydrogen facility is described at the Green Energy Hub, but that does not establish a reactor pad there. The map marks the port area, not a reactor pad. Last checked 19 Oct 2026. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
What would change this
A license application with a plot on the hub would fix the footprint. Next scheduled check: 19 Jan 2027.
- Next decision and prerequisites. The 2022 release makes feasibility studies the next step, followed by environmental approvals and CNSC licensing, with commercial operation suggested between 2030 and 2035. The reviewed sources record no feasibility result or later status. Last checked 23 Oct 2026. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
What would change this
A port authority, Cross River or ARC statement on the feasibility study or a license application. Next scheduled check: 21 Jan 2027.
- Permissions and public process. The November 2022 port release says the project would still need feasibility studies, environmental approvals and CNSC licensing, and that Cross River and ARC committed to early engagement with stakeholders, communities and First Nations, with information sessions to follow. It names no filed application or approval. Last checked 23 Oct 2026. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
What would change this
An environmental-assessment registration, CNSC license application or record of the promised information sessions. Next scheduled check: 21 Jan 2027.
- Site dependencies (land, grid, water). The 2022 release places the proposal at the Port of Belledune's Green Energy Hub, to supply at least 1 GW of heat and power to industrial users there. It describes no specific parcel, grid connection or cooling-water arrangement, and no later site document was found in these sources. Last checked 23 Oct 2026. Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River
What would change this
A feasibility study or EIA registration describing the Belledune site, grid and water arrangements. Next scheduled check: 21 Jan 2027.
Not yet reviewed against sources: Spent fuel, waste and closure. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(0 of 1 source with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(1)
- Belledune Port Authority: to pursue an ARC Clean Technology aSMR project with Cross River (company, accessed 2 Oct 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: ARC-100 proposal at the Port of Belledune Green Energy Hub — https://smrmap.com/projects/belledune-arc-100/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “ARC-100 proposal at the Port of Belledune Green Energy Hub”. Record reviewed 2 Oct 2026. Data fingerprint ee4d3854cfaa29a74e5f3d1b06467a050a149754ff4e29a386fab03eb267b850; build 2026-11-18. https://smrmap.com/projects/belledune-arc-100/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.