ARC-100
Sodium-cooled SMR proposed for Point Lepreau. CNSC's Phase 2 vendor design review describes 286 MWth and 100 MWe, without a gross or net electrical basis. Staff found no fundamental barriers to licensing at that time, but required further design development and technical follow-up, including reactor shutdown, cooling systems and fuel-design assurance. The review neither certifies the design nor grants a license. NB Power's Point Lepreau licence-to-prepare-site application is a separate process.
- Reactor type
- Sodium-cooled fast reactor. How it works, with a 3D view.
- Projects
- Licensing: NB Power ARC-100 at Point Lepreau. Furthest recorded stage of 3 using this design.
- Evidence
- 4 sources; first primary source: CNSC NB Power ARC-100 Project. Record reviewed 1 Oct 2026.
Key facts · Tracked projects · Agreements · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Key facts
- Class
- SMR
- Technology
- Sodium-cooled fast reactor (SFR)
- Coolant
- Sodium
- Spectrum
- Fast
- Developer / vendor(s)
- ARC Clean Technology
- Module electrical
- 100 MWe (net)
- Module thermal
- 286 MWth (nameplate; basis unspecified)
- Inclusion basis
- SMR by design class
- Confidence
- high
- Record reviewed
- 1 Oct 2026 (record review date, not proof of current availability or a deployment)
Tracked deployment projects
- NB Power ARC-100 at Point Lepreau — Licensing · Canada
- ARC-100 proposal at the Port of Belledune Green Energy Hub — Announced · Canada
- ARC-100 first-of-a-kind deployment framework at Idaho National Laboratory — Announced · United States
Agreements naming this design (5)
Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.
- ARC Clean Technology and IC Nuclear & Industry term sheet for ARC-100 deployment in Türkiye — Cooperation agreement or MOU · Active · announced 7 Apr 2026
Concerns Türkiye - Nucleon Energy and ARC Clean Technology NuARC partnership to deploy ARC-100 SMRs, starting in Alberta — Cooperation agreement or MOU · Active · announced 25 Sep 2025
Concerns Canada - Nucleon and ARC memorandum to explore ARC-100 deployment in Alberta and Texas — Cooperation agreement or MOU · Superseded · announced 13 May 2025
Concerns Canada, United States - KHNP, ARC Clean Technology and NB Power collaboration on global ARC-100 fleet deployment (2023-2024) — Cooperation agreement or MOU · Status not established · announced Nov 2023
Concerns Canada - ARC and Invest Alberta commercialization memorandum — Cooperation agreement or MOU · Status not established · announced 24 Mar 2023
Concerns Canada
Design sources
(4)
- CNSC NB Power ARC-100 Project (regulator, accessed 3 Nov 2026)
- IAEA Advanced Reactors Information System (ARIS) (IAEA/NEA, accessed 1 Oct 2026)
- CNSC: Status of new nuclear projects - NB Power ARC-100 at Point Lepreau (regulator, accessed 9 Oct 2026)
- CNSC: ARC-100 Phase 2 vendor design review executive summary (regulator, accessed 26 Oct 2026)
Evidence and open questions
(1 note)
- Evidence review. The saved CNSC Phase 2 executive summary supports sodium coolant, 286 MWth and 100 MWe without a gross or net electrical basis. It describes preliminary engineering and no fundamental barriers identified at that time, subject to additional work on human factors, software verification, security, shutdown/reactivity, cooling systems and fuel-design assurance. This optional review is not design certification, a license or a binding Commission decision. The page's 8 July 2025 modification date is not established as the decision date. The NB Power project page supports the Canadian developer and Point Lepreau deployment links separately. Stored SFR, fast-spectrum and net electrical-basis values still rest on earlier evidence; this summary does not substantiate them. The ARIS access limitation remains. Last checked 26 Oct 2026. CNSC NB Power ARC-100 Project; CNSC: Status of new nuclear projects - NB Power ARC-100 at Point Lepreau; CNSC: ARC-100 Phase 2 vendor design review executive summary
What would change this
A design technical source substantiating the stored fast spectrum and net electrical basis, or a subsequent CNSC design-review or site-license decision. Next scheduled check: 19 Jan 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- CNSC vendor design review, Phase 2 (ARC-100) — applies to the design, not to a site
Design assessment · Review completed (not an approval) · CNSC · completed Jul 2025
CNSC lists Phase 1 (executive summary dated October 2019) and Phase 2 (executive summary dated July 2025) of its pre-licensing vendor design review of ARC Clean Technology's ARC-100 among completed reviews. CNSC entered into the Phase 2 agreement with ARC on 9 March 2022; that agreement date is not the start of the whole review. The Phase 2 summary found no fundamental barriers to licensing at that time and listed further design work. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions. NB Power's Point Lepreau site application is a separate process.
Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: ARC-100 Phase 2 vendor design review executive summary
Site applications and decisions
- NB Power license to prepare site application — NB Power ARC-100 at Point Lepreau
Site permission sought · Under review · CNSC · submitted 30 Jun 2023
Site preparation license application for ARC-100.
Sources: CNSC NB Power ARC-100 ProjectStatus confirmed on against CNSC NB Power ARC-100 Project. This confirms the recorded status only; the general record check date remains separate.