ARC-100

Sodium-cooled SMR proposed for Point Lepreau. CNSC's Phase 2 vendor design review describes 286 MWth and 100 MWe, without a gross or net electrical basis. Staff found no fundamental barriers to licensing at that time, but required further design development and technical follow-up, including reactor shutdown, cooling systems and fuel-design assurance. The review neither certifies the design nor grants a license. NB Power's Point Lepreau licence-to-prepare-site application is a separate process.

Reactor type
Sodium-cooled fast reactor. How it works, with a 3D view.
Projects
Licensing: NB Power ARC-100 at Point Lepreau. Furthest recorded stage of 3 using this design.
Evidence
4 sources; first primary source: CNSC NB Power ARC-100 Project. Record reviewed 1 Oct 2026.
Schematic of Natrium, this type's example. On the left, a wide reactor vessel inside a guard vessel holds the core low down, with control rods from above, an upper structure, one heat exchanger and one pump.
Schematic of Natrium, this type's example.

Key facts

Class
SMR
Technology
Sodium-cooled fast reactor (SFR)
Coolant
Sodium
Spectrum
Fast
Developer / vendor(s)
ARC Clean Technology
Module electrical
100 MWe (net)
Module thermal
286 MWth (nameplate; basis unspecified)
Inclusion basis
SMR by design class
Confidence
high
Record reviewed
1 Oct 2026 (record review date, not proof of current availability or a deployment)

Tracked deployment projects

Agreements naming this design (5)

Agreements, plans, studies and government programs whose sources name this design. They are not deployment projects.

Design sources

(4)

Evidence and open questions

(1 note)
  • Evidence review. The saved CNSC Phase 2 executive summary supports sodium coolant, 286 MWth and 100 MWe without a gross or net electrical basis. It describes preliminary engineering and no fundamental barriers identified at that time, subject to additional work on human factors, software verification, security, shutdown/reactivity, cooling systems and fuel-design assurance. This optional review is not design certification, a license or a binding Commission decision. The page's 8 July 2025 modification date is not established as the decision date. The NB Power project page supports the Canadian developer and Point Lepreau deployment links separately. Stored SFR, fast-spectrum and net electrical-basis values still rest on earlier evidence; this summary does not substantiate them. The ARIS access limitation remains. Last checked 26 Oct 2026. CNSC NB Power ARC-100 Project; CNSC: Status of new nuclear projects - NB Power ARC-100 at Point Lepreau; CNSC: ARC-100 Phase 2 vendor design review executive summary
    What would change this

    A design technical source substantiating the stored fast spectrum and net electrical basis, or a subsequent CNSC design-review or site-license decision. Next scheduled check: 19 Jan 2027.

Regulatory actions

Compare reviews and approvals across designs

Design assessment

  • CNSC vendor design review, Phase 2 (ARC-100) — applies to the design, not to a site
    Design assessment · Review completed (not an approval) · CNSC · completed Jul 2025
    CNSC lists Phase 1 (executive summary dated October 2019) and Phase 2 (executive summary dated July 2025) of its pre-licensing vendor design review of ARC Clean Technology's ARC-100 among completed reviews. CNSC entered into the Phase 2 agreement with ARC on 9 March 2022; that agreement date is not the start of the whole review. The Phase 2 summary found no fundamental barriers to licensing at that time and listed further design work. CNSC says a vendor design review does not certify a design, issue a license or bind later Commission decisions. NB Power's Point Lepreau site application is a separate process.
    Sources: CNSC: vendor design review service agreements and completed reviews; CNSC: ARC-100 Phase 2 vendor design review executive summary

Site applications and decisions