Projects / France · Announced
Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte
Calogena's NetZeroHeat project would use one CAL30 heat-only reactor to supply the Pierrelatte district-heating network in France.
Current status
- How current
- General record check . 2 of 3 listed sources have a publication or document date recorded here; the newest is 2 Nov 2026. Status not rechecked since then; this project is not covered by the nightly status check.
Development and review dates
No dated development is recorded. Next general check: . Next evidence or detail review: .
- Permissions
- No separate project-specific permission or application entry is recorded here. The description and evidence notes may report steps not yet entered separately; this is not a finding that none exists.
- Latest development
- No actual dated development is recorded.
- Next dated milestone
- No next milestone date is recorded.
- Selected limitations
- Thermal output is not recorded on this project.
- No operator is recorded.
- No map pin is shown for this record.
A review date is not proof of current activity. An announcement records the announcement, not necessarily the physical step it describes.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
View on the map · Key facts · Who is involved · Timeline · Permissions and applications · Evidence dates · Sources and check dates · Suggest an update
Description
The European Commission listed it among 77 Innovation Fund selections on 19 October 2026 and describes delivery of 131 GWh of heat a year. Calogena reports a €40 million grant and calls construction potential. The Commission said on 19 October that selected promoters were invited to prepare grant agreements, with results due in the first quarter of 2027. No plot, safety authorization application or construction start is recorded. The sources name Pierrelatte, not CEA Cadarache, where Calogena has a separate proposed plant.
Key facts
- Design
- CAL-30 (Microreactor)
- Technology
- Pressurized water reactor (PWR) · light water. The IAEA's 2026 catalog section, supplied by its contributor, lists CAL-30 as PWR (pool-type), but it is a heat-only design at low pressure with its vessel immersed in a pool, unlike a power plant's PWR, and the catalog's own summary table gives only pool type.
- Reactor vessel of this design
- 15 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 395.the printed cell includes the unit m on both numbersSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.
All vessels to scale - Operator(s)
- Not recorded
- Vendor for linked design
- Calogena
- Location
- Pierrelatte (Calogena proposed heat reactor) · France · precision: town or locality only
The sources name this place but publish no coordinate for it, so no pin is shown. - Coordinates
- Town named, no map pin
- Electrical capacity
- thermal only (no MWe) · scope: plant
- Thermal capacity
- Not recorded
- Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Record reviewed
- 11 Nov 2026
Site and capacity notes
Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte is recorded at Pierrelatte (Calogena proposed heat reactor), Auvergne-Rhône-Alpes, France. Operator: No operator is recorded. Recorded vendor: Calogena. Stage: Announced. Location precision: town or locality only; town named, no map pin.
This project is recorded as thermal only (no MWe). Modules planned: 1. Thermal output is not recorded on this project.
Who is involved
Every project is asked the same questions. An answer names only what a cited source supports: a proposal, letter of intent or program listing is not a contract, a payment or a permit. “Not recorded” is not a finding that none exists. Compare who is involved across projects.
More on reading these answers
Company-level money counts only when its source ties it to the project, and the note then says it is company-level. Contractor answers distinguish preparatory partners from construction appointments, and retain the source's terms. An answer not found in the sources we checked stays unknown, and a question with no completed source review stays unreviewed.
- Reactor supplier
- Vendor for the linked designCalogena
- Funding and government decisions
Source-backed project statement The European Commission lists NetZeroHeat, coordinated by Calogena, among projects selected on 19 October 2026 and says promoters have been invited to prepare grant agreements, with results due in the first quarter of 2027. Calogena's 2 November 2026 release gives the amount as €40 million and says it would contribute to potential construction. A selection is not a signed grant agreement or a payment. European Commission: IF25 Net-Zero Technologies call, projects description; European Commission press release IP/26/2187 on Innovation Fund selections; Calogena obtient 40 M€ de la Commission européenne pour son premier réacteur nucléaire commercial
- Fuel
- Fuel form stated for CAL-30 (catalog profile as of 14 Feb 2025)UO2 rods / 17x17 fuel assemblies
No separate question review is recorded.
Not recorded in SMRMap's reviewed evidence (7): Project proposer or applicant; Operator or intended licensed owner; Customer or offtaker; Contractor; Site host or owner; Programs and agreements naming the project; Comparable schedule revision
- Project proposer or applicant
- No separate project proposer or applicant is recorded. The operator and supplier answers may identify who is developing the project; no role is inferred from them.
- Operator or intended licensed owner
- Customer or offtaker
No separate question review is recorded.
- Contractor
No separate question review is recorded.
- Site host or owner
- Programs and agreements naming the project
- Comparable schedule revision
No separate question review is recorded.
Timeline
This timeline has no entries yet. Other dated information may appear in the description and checking notes.
New developments for every project appear in the site-wide monthly digests and RSS feed; there is no separate feed for one project.
Permissions and applications
- No separate permission or application entries are recorded for this project. Its description, sources and evidence notes may report steps not yet entered separately.
Assessments of the design (not of this site)
(1)
- Calogena CAL30 safety-options requests — applies to the design, not to a site
Design assessment sought · Under review · ASNR · submitted 31 Oct 2024
ASNR records a CAL30 safety-options request on 31 October 2024 and further requests through 28 August 2026. Its 19 May 2026 opinion concerns shutdown-system diversification: principles are broadly satisfactory, with stronger electrical diversification, detailed design and qualification evidence, and a simple, robust alternative shutdown means required for possible common-mode rod blockage. These are requirements for a possible future creation-authorization application, not whole-design approval or a Cadarache site permission. The opinion dates the amended letter 19 June 2025, while the earlier listing records 20 June 2025.
Sources: ASNR, PRM projects and their fuel-fabrication plants; ASNR, PRM projects and technical exchanges (14 October 2026 update); ASNR opinion 2026-AV-027: CAL30 shutdown-system safety optionsCould not be confirmed on . Attempted official source: ASNR opinion 2026-AV-027: CAL30 shutdown-system safety options. This is an access or status observation only; the record review date is unchanged.
Selected jurisdiction context
Browse related records by location. A jurisdiction measure does not by itself approve this project, and location alone does not establish eligibility for funding or support.
Evidence and open questions
(4 not yet reviewed)
Not yet reviewed against sources: Permissions and public process; Site dependencies (land, grid, water); Spent fuel, waste and closure; Next decision and prerequisites. An unreviewed question is unfinished research, not a finding that nothing exists.
Evidence dates
(2 of 3 sources with a publication or document date)
Dates describe the listed documents and recorded events, not proof of current project activity. An announcement dates the announcement, not the promised physical step. Permission dates remain in Permissions and applications. Targets, page-update, access and review dates are separate. Undated evidence may be newer.
Sources
(3)
- European Commission: IF25 Net-Zero Technologies call, projects description (government, accessed 11 Nov 2026)
- European Commission press release IP/26/2187 on Innovation Fund selections (government, published 19 Oct 2026, accessed 11 Nov 2026)
- Calogena obtient 40 M€ de la Commission européenne pour son premier réacteur nucléaire commercial (company, dated 2 Nov 2026, accessed 11 Nov 2026)
Suggest an update
If something on this record is wrong, missing or out of date, email a suggested update. It opens your own email program with this project’s name and link filled in; nothing is sent until you send it.
No email program? Write to corrections@smrmap.com and include the project name and link: Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte — https://smrmap.com/projects/calogena-pierrelatte/. Suggestions are checked against sources before anything changes; see how corrections work.
Cite or share this page
SMRMap. “Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte”. Record reviewed 11 Nov 2026. Data fingerprint 434a3ad4fbbaaa6e4b79ee0db9d79c7b9b85f663d24417697f7e09f26d609d55; build 2026-11-17. https://smrmap.com/projects/calogena-pierrelatte/ (accessed [date]). Data license CC BY 4.0.
“Record reviewed” is the record review date. The evidence review, individual sources and later additions keep their own dates. The fingerprint identifies the underlying data collections, not an archived page or a download checksum. Build date is not a source review date. Include your access date; save a PDF if you need a copy of the page you read.