CAL-30
CAL-30 is a heat-only pool-type water reactor concept recorded under Calogena; the developer's section of the 2026 IAEA-hosted catalog gives its reactor type as PWR (pool-type). This is a dated NEA catalog profile (assessment cutoff February 2025), not confirmation of current availability, a named deployment, or authorization. Capacity is not assigned where module and plant scope or output basis has not been reconciled.
- Reactor type
- Pressurized water reactor. How it works, with a 3D view.
- Projects
- Announced: Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte. Development status as stated in the catalog dated 14 Feb 2025: Conceptual design.
- Evidence
- 3 sources; first primary source: NEA Small Modular Reactor Dashboard — Third Edition (2025). Record reviewed 2 Oct 2026.
Key facts · Tracked projects · Sources · Evidence · Regulatory actions · Its projects in the table · Compare with other designs
Catalog identity snapshot: 14 Feb 2025 (NEA assessment cutoff). Later technical descriptions, where recorded, are dated separately below. Source review does not establish current availability or a deployment.
Key facts
- Class
- Microreactor
- Technology
- Pressurized water reactor (PWR)
The IAEA's 2026 catalog section, supplied by its contributor, lists CAL-30 as PWR (pool-type), but it is a heat-only design at low pressure with its vessel immersed in a pool, unlike a power plant's PWR, and the catalog's own summary table gives only pool type. - Coolant
- Light water
- Spectrum
- Thermal
- Developer / vendor(s) as of 14 Feb 2025
- Calogena
- Fuel form
- UO2 rods / 17x17 fuel assemblies
- Development status (as stated)
- Conceptual design
- Reactor vessel
- 15 m tall, 4 m across. Developer's figure in the IAEA ARIS catalog, 2026 edition, printed p. 395.the printed cell includes the unit m on both numbersSMRMap has not checked this against drawings or regulators' documents. A larger vessel does not mean a more powerful reactor, and a reactor vessel is not a whole power plant. The catalog has no open license. These figures are quoted from it and are not offered under SMRMap's CC BY 4.0 data license. These vessel figures are page reference material, outside SMRMap's downloadable dataset and its dataset fingerprint. Quoted source material retains its separate rights.All vessels to scale10 m bar; a person 1.8 m tallCAL-30 *
15 m tall, 4 m across - Inclusion basis
- Labeled microreactor
- Confidence
- medium
- Not yet recorded
- Expected but not recorded as a structured fact: Module rating. A missing structured fact does not mean zero or that it does not exist; a documented review limit is named beside the fact, and the description and sources may say more.
- Record reviewed
- 2 Oct 2026 (record review date, not proof of current availability or a deployment)
All fields
(2 without a known value)
- Module electrical
- Not recorded
- Module thermal
- Not recorded
Tracked deployment projects
- Calogena NetZeroHeat CAL30 heat reactor for Pierrelatte — Announced · France
Design sources
(3)
- NEA Small Modular Reactor Dashboard — Third Edition (2025) (IAEA/NEA, accessed 2 Oct 2026)
Catalog page 140 - Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition) (IAEA/NEA, published Jun 2025, accessed 2 Oct 2026)
- Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026) (IAEA/NEA, published Sep 2026, accessed 2 Nov 2026)
Evidence and open questions
(3 notes)
- Evidence review. Calogena's section of the 2024 IAEA SMR catalog (third edition, June 2025) says Calogena, a subsidiary of the French Gorgé group, is developing a small modular pool-type water reactor for district heating; the module is named CAL 30. It is a 30 MWth nuclear water boiler with demineralized water circulating by natural convection at about 110°C and low pressure, using 17x17 UO2 PWR-type assemblies below 5% enrichment, and produces no electricity (30 MW(t)/0 MW(e)). As dated by that edition, the conceptual design phase runs 2023-2025 and the Safety Options File was submitted to ASNR in October 2024, a design-stage filing rather than a construction authorization. The NEA dashboard lists the design as Gorgé-Calogena's CAL-30. No opened source names CEA Cadarache, so the linked Cadarache proposal is not connected by these sources. The stored vendor, light-water coolant and 'Conceptual Design' status stay, and the family is PWR on the 2026 catalog table, attached for the reactor type only; the stored thermal spectrum is not stated by any opened source, and the rating stays off this identity profile. The 2026 catalog table, attached for the reactor type only, lists Basic Design and 30-35 MW(t); neither is stored here, and the status follows the 2024 edition and the NEA basis. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition); NEA Small Modular Reactor Dashboard — Third Edition (2025)
What would change this
ASNR's opinion on the CAL 30 safety options file or a Calogena creation-authorization (DAC) application, or a newer catalog edition. Next scheduled check: 19 Jan 2027.
- Module rating. The catalog gives the CAL 30 module 30 MWth with no electrical output (30 MW(t)/0 MW(e)), a thermal-only per-module rating. The figure is not stored on this identity profile, which by standing rule carries no module rating. Last checked 19 Oct 2026. Small Modular Reactor Technology Catalogue, 2024 edition (contributor material; June 2025 third edition)
What would change this
A Calogena or ASNR document changing the module's thermal rating. Next scheduled check: 19 Jan 2027.
- Technology family. The IAEA's 2026 catalog section, supplied by its contributor, lists CAL-30 as PWR (pool-type), but it is a heat-only design at low pressure with its vessel immersed in a pool, unlike a power plant's PWR, and the catalog's own summary table gives only pool type. Printed pages 6 and 395. Last checked 3 Nov 2026. Small Modular Reactor Technology Catalogue, 2026 edition (contributor material; printed September 2026)
What would change this
A Calogena or IAEA document that changes the CAL-30 reactor type or layout. Next scheduled check: 3 Feb 2027.
Regulatory actions
Compare reviews and approvals across designs
Design assessment
- Calogena CAL30 safety-options requests — applies to the design, not to a site
Design assessment sought · Under review · ASNR · submitted 31 Oct 2024
ASNR records a CAL30 safety-options request on 31 October 2024 and further requests through 28 August 2026. Its 19 May 2026 opinion concerns shutdown-system diversification: principles are broadly satisfactory, with stronger electrical diversification, detailed design and qualification evidence, and a simple, robust alternative shutdown means required for possible common-mode rod blockage. These are requirements for a possible future creation-authorization application, not whole-design approval or a Cadarache site permission. The opinion dates the amended letter 19 June 2025, while the earlier listing records 20 June 2025.
Sources: ASNR, PRM projects and their fuel-fabrication plants; ASNR, PRM projects and technical exchanges (14 October 2026 update); ASNR opinion 2026-AV-027: CAL30 shutdown-system safety optionsCould not be confirmed on . Attempted official source: ASNR opinion 2026-AV-027: CAL30 shutdown-system safety options. This is an access or status observation only; the record review date is unchanged.